Planning application

Jacaranda Totnes Road Paignton TQ4 7PW

Granted Torbay P/2024/0343 Planning Application

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing dwelling and erection of replacement dwelling, new store building and associated works.

As published by the council, reference P/2024/0343

Application record

Reference
P/2024/0343
Type
Planning Application
Status
Decided
Decision
Approval
Received
21 May 2024
Validated
3 Sep 2024
Decided
23 Oct 2024
Ward
Collaton St Mary
Decision by
Delegated
Postcode
TQ4 7PW

Timeline

Dates from the published record

  1. 21 May 2024

    Received by Torbay

  2. 3 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 23 Oct 2024

    Decision issued: Approval

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Jacaranda Totnes Road Paignton TQ4 7PW

    P/2022/1174 Submitted 26 Oct 2022 6m away

    Formation of loft conversion with roof alterations, install Juliet balconies, new windows to side and roof lights, single storey rear extension infill.

    Granted Householder Extension Loft or dormer +2 9 docs
    Small domestic
  • Land North Of Totnes Road Paignton TQ4 7PW

    P/2023/0075 Submitted 19 Jan 2023 88m away

    Installation of pole and associated apparatus.

    Decided Telecoms 5 docs
  • Redlands Totnes Road Paignton TQ4 7PW

    P/2023/0211 Submitted 6 Mar 2023 132m away

    Conversion of double garage to granny annexe with new windows, doors and rooflights and associated works.

    Granted Householder Loft or dormer Windows or glazing 22 docs
    Domestic
  • Land To The North Of Totnes Road, Collaton St Mary Paignton

    P/2022/1357 Submitted 21 Dec 2022 145m away

    Variation/Removal of Conditions relating to application P/2021/1180 (Reserved Matters for 73 dwellings). Variation of Condition 9 (Amend to materials as previously submitted), Removal of Conditions 11 (Permitted Development), 12 (Highway Standards), 13 (Adoptable Streets) and 14 (Road Management/Maintenance).

    Refused Amendments 89 docs
    Major scheme
  • Land To The North Of Totnes Road, Collaton St Mary Paignton

    P/2025/0783 Submitted 5 Dec 2025 145m away

    Non-Material Amendment to application P/2022/1357: Variation/Removal of Conditions relating to application P/2021/1180 (Reserved Matters for 73 dwellings). Variation of Condition 9 (Amend to materials as previously submitted), Removal of Conditions 11 (Permitted Development), 12 (Highway Standards), 13 (Adoptable Streets) and 14 (Road Management/Maintenance). Amendment sought: Change material of previously approved vertical tile hanging plots from charcoal concrete to natural slate.

    Granted Amendments
    Major scheme
  • 44 St Marys Park Paignton TQ4 7DB

    P/2023/0011 Submitted 5 Jan 2023 383m away

    Formation of two storey extension to rear to provide loft extension to include an additional velux roof light and associated works.

    Granted Householder Extension Loft or dormer 10 docs
    Domestic

In Torbay

  • P/2025/0768 Granted

    St Edmunds Hotel 25 Sands Road Paignton TQ4 6EG

    Change of use from guest house to dwelling.

    1 Dec 2025 Full applications
  • P/2026/0532 Awaiting decision

    41 Totnes Road Paignton TQ4 5LA

    Change of use from ambulance offices (use class E) to residential institution as adult respite centre (use class C2) to include construction of single storey extension to rear and associated works.

    24 Aug 2026 Full applications
  • P/2026/0271 Withdrawn

    15 Scarborough Road Torquay TQ2 5UJ

    Change of use from C1 (guesthouse) to C4 (six-bed HMO) with no external alterations. Existing self-contained basement flat retained as C3 dwelling. No building works proposed.

    27 Apr 2026 Full applications
  • P/2026/0512 Awaiting decision

    33A New Road Brixham TQ5 8NB

    Change of use of garage to affordable residential unit. Alterations to fenestration.

    14 Aug 2026 Full applications
  • P/2026/0309 Refused

    The Rosewood 56 Belgrave Road Torquay TQ2 5HY

    Change of use of upper floors of property from C1 (guesthouse) to six-bedroom HMO. Basement and ground floor owner's accommodation remains unchanged. No external alterations.

    11 May 2026 Full applications