Skip to content
PlanIndex Get alerts
Menu

Planning application

96 Queensway Torquay TQ2 6BY

Granted Torbay P/2022/0792 Planning Application

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of new dwelling adjacent to no 96 Queensway

As published by the council, reference P/2022/0792

Application record

Reference
P/2022/0792
Type
Planning Application
Status
Decided
Decision
Approval
Received
5 Jul 2022
Validated
5 Jul 2022
Decided
17 Feb 2023
Ward
Cockington With Chelston
Decision by
Delegated
Postcode
TQ2 6BY

Timeline

Dates from the published record

  1. 5 Jul 2022

    Received by Torbay

  2. 17 Feb 2023

    Decision issued: Approval

  3. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Our Lady Of The Angels Catholic Primary School Queensway Torquay TQ2 6DB

    AT/2024/0245 Submitted 17 Sep 2024 53m away

    T001 - Common Ash - Reduce over-extended westerly limb by min. 45m, to suitable growth points. Reduce east-facing limb with Inonotus hispidus fungal fruiting body by min. 5m and to suitable growth points, balance rest of crown as closely as possible to maintain shape.

    Granted Trees 8 docs
  • 33 Fletcher Close Torquay TQ2 6DD

    AT/2025/0275 Submitted 10 Sep 2025 179m away

    T0064 - 1x Mature Monterey Pine - Sectionally dismantle, fell, and remove to ground level using lowering and rigging techniques to safely control each section's descent in accordance with industry best practices. All cut material to be cut into manageable lengths & stacked neatly in the woodland area in habitat piles or windrows. Remove all other cut material from site & return to a Devon Tree Services depot for recycling, leaving the area safe, clean & tidy. Please see QTRA for justification of work.

    Granted Trees
  • 33 Fletcher Close Torquay TQ2 6DD

    AT/2025/0346 Submitted 18 Nov 2025 186m away

    fell and remove T001 Holm oak underneath pine that is being removed through permission in AT/2025/0275/TPO. Heavily suppressed holm oak under the canopy of the pine which we have permission to remove. This Oak needs to be removed to facilitate the removal of the pine.

    Granted Trees
  • 40A Ben Jonson Close Torquay TQ2 6BT

    P/2019/1333 Submitted 17 Dec 2019 225m away

    Formation of decked entrance and boundary fence with climbing plants forming hedge (Retrospective).(Amended plans received 14.07.2021).

    Granted Householder 9 docs
    Small domestic
  • 2 Davis Avenue Torquay TQ2 6DU

    P/2024/0660 Submitted 26 Sep 2024 244m away

    Formation of a single storey extension to the side and rear.

    Granted Householder Extension
    Small domestic
  • 24 Raleigh Close Torquay TQ2 6FE

    AT/2022/0327 Submitted 1 Dec 2022 263m away

    G1. Mixed group of Beech, Sycamore, and Ash. Crown raise over gardens of 75 to 79 Raleigh Avenue for a ground clearance of approx 5m and remove Basel growth. Section fell leaning Ash tree within this group. T1. Side prune Sycamore growing adjacent to 24 Raleigh Close for approx 3m.

    Granted Trees 4 docs

In Torbay

  • P/2025/0768 Granted

    St Edmunds Hotel 25 Sands Road Paignton TQ4 6EG

    Change of use from guest house to dwelling.

    1 Dec 2025 Full applications
  • P/2026/0532 Awaiting decision

    41 Totnes Road Paignton TQ4 5LA

    Change of use from ambulance offices (use class E) to residential institution as adult respite centre (use class C2) to include construction of single storey extension to rear and associated works.

    24 Aug 2026 Full applications
  • P/2026/0271 Withdrawn

    15 Scarborough Road Torquay TQ2 5UJ

    Change of use from C1 (guesthouse) to C4 (six-bed HMO) with no external alterations. Existing self-contained basement flat retained as C3 dwelling. No building works proposed.

    27 Apr 2026 Full applications
  • P/2026/0512 Awaiting decision

    33A New Road Brixham TQ5 8NB

    Change of use of garage to affordable residential unit. Alterations to fenestration.

    14 Aug 2026 Full applications
  • P/2026/0309 Refused

    The Rosewood 56 Belgrave Road Torquay TQ2 5HY

    Change of use of upper floors of property from C1 (guesthouse) to six-bedroom HMO. Basement and ground floor owner's accommodation remains unchanged. No external alterations.

    11 May 2026 Full applications