Planning application
Winsor Works London Road Addington West Malling Kent
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline Application: All matters reserved except for access and layout (Erection of 7no dwellings (use class C3) with landscaping, parking and associated works)
As published by the council, reference 26/01553/OA
Application record
- Reference
- 26/01553/OA
- Status
- Registered
- Received
- 19 Aug 2026
- Validated
- 25 Aug 2026
- Ward
- Pilgrims With Ightham
- Parish
- Addington
- Decision by
- Delegated
Site history
Applications at this address on the Tonbridge and Malling register
This site has had 2 applications since 2020: 0 approved, 1 refused.
-
20/02962/LDP Refused
Winsor Works London Road Addington West Malling Kent
Lawful Development Certificate Proposed: Concrete crushing operation
Timeline
Dates from the published record
-
19 Aug 2026
Received by Tonbridge and Malling
-
25 Aug 2026
Validated
Checked as complete and ready for consideration.
-
26 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tonbridge and Malling took a median of 62 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
- ENVIRONMENT AGENCY
- PROPOSED SITE PLAN
- PROPOSED SITE PLAN- ENTRANCE
- BNG METRIC
- REMEDIATION METHOD STATEMENT
- APPLICATIONFORMREDACTED
- PROPOSED SITE SECTIONS
- SITE LOCATION AND EXISTING SITE PLAN- ENTRANCE
- EXISTING SECTIONS 2
- EXISTING SITE SECTIONS 1
- DESIGN AND ACCESS STATEMENT
- NOISE IMPACT ASSESSMENT
- ARBORICULTURAL REPORT
- PLANNING STATEMENT
- APPENDIX 1- HISTORIC APPEAL DECISON
- FLOOD RISK ASSESSMENT
- EXISTING SITE PLAN- PART 2
- PRELIMINARY ECOLOGICAL APPRAISAL
- BIODIVERSITY NET GAIN ASSESSMENT
- TRANSPORT STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Tonbridge and Malling for determination, against a statutory target of eight weeks. Over the last year Tonbridge and Malling's median decision took 62 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Tonbridge and Malling's portal will say. Our guide explains the common types.