Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site Land North And West Of Holborough Quarry Ladds Lane Snodland Kent

Awaiting decision Tonbridge and Malling 26/01508/HRSC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Request for Screening Opinion under the Habitats and Species Regulations 2017 in respect of: Mixed-use development of 1,300 homes and supporting services and infrastructure

As published by the council, reference 26/01508/HRSC

Application record

Reference
26/01508/HRSC
Status
Registered
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Snodland West And Holborough Lakes
Parish
Snodland
Decision by
Delegated

Site history

Applications at this address on the Tonbridge and Malling register

This site has had 3 applications since 2026.

  • 26/01151/EASP Awaiting decision

    Development Site Land North And West Of Holborough Quarry Ladds Lane Snodland Kent

    Request for an EIA Scoping Opinion under Town and Country Planning (Environmental Impact Assessment) Regulations 2017 as amended: For A mixed use development delivered in phases being separate and severable parts of the development and comprising up to 2,000 dwellings (use class C3); up to up to 2,500sqm Class E (a), up to 350sqm hot food/coffee take away (sui generis), and full electric vehicle charging infrastructure (sui generis) ; mixed use local centre (comprising Commercial, Business and Service Uses Class E (a), (b), (c), (f) creche/nursery, (g) offices, residential uses (C3), local community space Class F2 (b) and mobility hub; a site for a primary school (use class F1); a care home (C2),Green Infrastructure including formal open space (including playing fields with changing facilities and associated infrastructure (use class F2(c)), informal open space, allotments, play space (including Neaps/Leaps/MUGA), walking and cycling routes, amenity greenspace, parks and gardens, natural/semi natural greenspace, new and retained landscape and woodland, and including areas for biodiversity enhancement); sustainable drainage systems; movement network comprising new highway, cycle and pedestrian routes (including a vehicular access point from the Peter's Bridge roundabout); pedestrian and/or cycle connections and improvements to existing Rights of Way at Whitedyke Road and the improvement and/or localised diversion of footpath RS218; engineering works (including ground modelling); demolition and other supporting ancillary infrastructure (including utilities, pumping stations, lighting, electricity substations and secondary mobility hubs). Outline planning application with all matters reserved except access onto Peter's Bridge roundabout and reconfiguration of part of Ladds Lane to provide bus and active travel only access. The proposal forming part of a cross-boundary development with works to the access at Peter's Bridge in Medway

    Submitted 15 Jun 2026
  • 26/01150/EASP Awaiting decision

    Development Site Land North And West Of Holborough Quarry Ladds Lane Snodland Kent

    Request for an EIA Scoping Opinion under Town and Country Planning (Environmental Impact Assessment) Regulations 2017 as amended: For A mixed use development delivered in phases being separate and severable parts of the development and comprising up to 1,300 dwellings (use class C3); 1.49ha of land for up to up to 2,500sqm Class E (a), up to 350sqm hot food/coffee take away (sui generis), and full electric vehicle charging infrastructure (sui generis) ; mixed use local centre (comprising Commercial, Business and Service Uses Class E (a), (b), (c), (f) creche/nursery, (g) offices, residential uses (C3), local community space Class F2 (b) and mobility hub; a site for a primary school (use class F1); Green Infrastructure including formal open space (including playing fields with changing facilities and associated infrastructure (use class F2(c)), informal open space, allotments, play space (including Neaps/Leaps/MUGA), walking and cycling routes, amenity greenspace, parks and gardens,natural/semi natural greenspace, new and retained landscape and woodland, and including areas for biodiversity enhancement); sustainable drainage systems; movement network comprising new highway, cycle and pedestrian routes (including a vehicular access point from the Peter's Bridge roundabout); pedestrian and/or cycle connections and improvements to existing Rights of Way at Whitedyke Road and the improvement and/or localised diversion of footpath RS218; engineering works (including ground modelling); demolition and other supporting ancillary infrastructure (including utilities, pumping stations, lighting, electricity substations and secondary mobility hubs). Outline planning application with all matters reserved except access onto Peter's Bridge roundabout and reconfiguration of part of Ladds Lane to provide bus and acrtive travel only access. The proosal forming part of a cross-boundary development with works to the access at Peter's Bridge in Medway

    Submitted 15 Jun 2026

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Tonbridge and Malling

  2. 17 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Tonbridge and Malling took a median of 62 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Milton Keynes

304 applications on PlanIndex · across 30 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

  • PARISH COUNCIL Consultee Response · 27 Aug 2026
  • KENT DOWNS NATIONAL LANDSCAPE Consultee Response · 19 Aug 2026
  • HRA SCREENING REPORT (SCHEME A) Report · 12 Aug 2026
  • COVER LETTER Correspondence · 12 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Tonbridge and Malling for determination, against a statutory target of eight weeks. Over the last year Tonbridge and Malling's median decision took 62 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Tonbridge and Malling's portal will say. Our guide explains the common types.