Planning application
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details of condition 14 (remediation verification report), for Phase 2 development, submitted pursuant to Outline planning permission TM/17/01595/OAEA (Outline Application: The erection of up to 840 dwellings (including affordable homes) with public open space, landscaping, sustainable drainage systems, land for a Primary School, doctors surgery and for junction improvements at Hermitage Lane/A20 junction, and a link road between Poppy Fields roundabout and Hermitage Lane. Vehicular accesses into the site from Poppy Fields Roundabout and Hermitage Lane. All matters reserved with the exception of means of access)'
As published by the council, reference 25/00851/RD
Application record
- Reference
- 25/00851/RD
- Type
- Reserved Details
- Status
- Registered
- Received
- 15 May 2025
- Validated
- 15 May 2025
- Ward
- Aylesford South And Ditton
- Parish
- Aylesford
Site history
Applications at this address on the Tonbridge and Malling register
This site has had 12 applications since 2023: 6 approved, 0 refused.
-
26/01063/RD Awaiting decision
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of Conditions 14 (Remediation), 16 (Noise Mitigation), 17 (Surface Water Drainage), 19 (Foul Waste Disposal) and 25 (Landscape and Open Space) for Phase 3 only, pursuant to Outline Planning Permission 17/01595/OAEA as amended by TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595 OAEA for alterations to the proposed design of Poppyfields roundabout)
-
26/00565/OB106D Granted
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of Phase 3 Affordable Housing Scheme (schedule 1, paragraph 2.1) submitted pursuant to S106 Agreement on Outline planning permission TM/17/01595/OAEA (Outline Application for erection of up to 840 dwellings (including affordable homes) with public open space, landscaping, sustainable drainage systems, land for a Primary School, doctors surgery and for junction improvements at Hermitage Lane/A20 junction, and a link road between Poppy Fields roundabout and Hermitage Lane. Vehicular accesses into the site from Poppy Fields Roundabout and Hermitage Lane. All matters reserved with the exception of means of access)
-
26/00270/RD Awaiting decision
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of condition 25 (Open Space) (phase 2 only) pursuant to planning permission TM/23/00289/OAEA (Section 73 minor material amendment application to vary condition 7 of planning approval: TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595/OAEA for alterations to the proposed design of Poppyfields roundabout))
-
25/02101/RD Awaiting decision
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of condition 4 (Earthworks) Pursuant to planning permission TM/23/00643/RM Reserved Matters application: Detailed design of the strategic open space and landscaping (Infrastructure phase 1 and 2) pursuant to outline application (varied via S73) Ref: TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595 OAEA for alterations to the proposed design of Poppy fields roundabout)
-
25/01813/OB106V Awaiting decision
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Variation to clause 1 definition of 'Primary School Land' and paragraphs 4.4, 5.4 and 5.5 of Schedule 2. Deletion of paragraph 5.1 of Schedule 2. Addition of paragraph 26 to Schedule 6 and "Primary School Land Plan/Plan 9" at Appendix 1. Disregard the land coloured brown for the purposes of defining the Primary School Land on "Plan 2" titled "Development Framework" at Appendix 1. In relation to outline planning permission TM/17/01595/OAEA (Outline Application for erection of up to 840 dwellings (including affordable homes) with public open space, landscaping, sustainable drainage systems, land for a Primary School, doctors surgery and for junction improvements at Hermitage Lane/A20 junction, and a link road between Poppy Fields roundabout and Hermitage Lane. Vehicular accesses into the site from Poppy Fields Roundabout and Hermitage Lane. All matters reserved with the exception of means of access).
-
23/00507/NMA Granted
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Non Material Amendment to planning permission TM/22/00076/RM to amend the plans list condition to include all drawings submitted as part of the original reserved matters application
-
23/00506/RD Withdrawn
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of planning condition 21 (Phase 1 EV Charging Plan) submitted pursuant to planning permission TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595 OAEA for alterations to the proposed design of Poppyfields roundabout)
-
23/00445/RD Granted
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of planning condition 21 (EV Charging Points - phase 1) submitted pursuant to planning permission TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595/OAEA for alterations to the proposed design of Poppyfields roundabout)
-
23/00290/RD Granted
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of planning condition 16 (Noise mitigation measures - phase 1) submitted pursuant to planning permission TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595 OAEA for alterations to the proposed design of Poppyfields roundabout)
-
23/00129/RD Granted
Land South Of London Road And East Of Hermitage Lane Aylesford Kent
Details of planning condition 11 (external materials - phase 1: plots 1 to 44) submitted pursuant to planning permission TM/22/01863/FL (Section 73 minor material amendment application to vary condition 08 of approved outline permission TM/17/01595/OAEA for alterations to the proposed design of Poppyfields roundabout)
Timeline
Dates from the published record
-
15 May 2025
Received by Tonbridge and Malling
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 July 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tonbridge and Malling took a median of 62 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Tonbridge and Malling for determination, against a statutory target of eight weeks. Over the last year Tonbridge and Malling decided outline applications in a median of 69 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Tonbridge and Malling
-
26/01315/RD Granted
Farm Building East Of Stable Court Roughway Lane Roughway Tonbridge Kent
Details of conditions 8 (boundary treatment), 10 (CEMP), 12 (refuse and recycling storage) and 13 (cycle storage) pursuant to planning permission TM/25/02022/FL (Demolition of agricultural barn and erection of 2no. residential dwellings with associated car barn, parking and landscaping)
-
26/01014/RD Granted
Development Site Bushey Wood Phase 1 Bull Lane Eccles Aylesford Kent
Details of condition 33 part (ii) (Written Scheme of Investigation) for Phase 1A pursuant to planning permission TM/22/00113/OAEA Residential development of up to 950 dwellings, provision of a mixed-use local centre (including Class E, F and C3 with potential for retirement homes) provision of land to accommodate a new primary school, replacement sports pitches with changing facilities; associated green infrastructure including landscaping, public open space, allotments, sustainable urban drainage systems, biodiversity enhancements; new accesses from Bull Lane; new access and road/cycleway/footpath link to New Court Road
-
25/01875/RD Refused
239 London Road West Malling Kent ME19 5AD
Details of condition 13 (Construction and Environmental Management Plan) pursuant to planning permission TM/24/00441/FL (Erection of 2 bungalows with associated parking and landscaping)
-
26/00904/RD Granted
Royal British Legion Industries Hall Road Aylesford Kent ME20 7NX
Details of Condition 34 (Habitat Management and Monitoring Plan )of 25/00382/PA (Demolition of existing building and structures to provide 1no. warehouse building within a flexible B2 / B8 Use Class (General Industrial / Storage and Distribution), together with open storage (Use Class B8, alongside associated landscaping, parking and servicing and other infrastructure at Royal British Legion Industries, Hall Road, Aylesford, ME20 7NX)
-
26/00510/RD Granted
1 Bourne Vale Plaxtol Sevenoaks Kent TN15 0QT
Details of condition 6 (hard and soft landscaping) pursuant to planning permission TM/23/00550/FL (Demolition of existing single storey double garage and erection of new detached 2 storey dwelling with rooms in roof and associated external works)