Planning application
Land Adjacent Hangmans Wood And Hangmans Wood Industrial Park Stifford Road South Ockendon Essex
Works: Extension
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
The permanent use of Areas 1, 2 and 3 for open storage (Use Class B8), together with an extension into Area 3 accommodating the erection of a new 2,800sqm storage building (Use Class B2/B8)
As published by the council, reference 26/00792/FUL
Application record
- Reference
- 26/00792/FUL
- Type
- Full Planning Permission Application
- Status
- Awaiting decision
- Received
- 8 Jul 2026
- Validated
- 23 Jul 2026
- Ward
- Belhus
Timeline
Dates from the published record
-
8 Jul 2026
Received by Thurrock
-
23 Jul 2026
Validated
Checked as complete and ready for consideration.
-
1 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Thurrock took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
40 documents on file for this application
- ENVIRONMENTAL HEALTH
- ENV HEALTH
- ENVIRONMENTAL HEALTH
- EMERGENCY PLANNING
- NATURAL ENGLAND
- ENVIRONMENT AGENCY
- TC HIGHWAYS
- ESSEX POLICE
- FORESTRY ENGLAND
- APPLICATIONFORMREDACTED
- LETTER OF SUPPORT FROM HOWARD TENENS
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- PROPOSED SITE MASTERPLAN
- DESIGN AND ACCESS STATEMENT
- ENVIRONMENTAL DNA (EDNA) SURVEYS
- BAT REPORT
- BIODIVERSITY NET GAIN FEASIBILITY ASSESSMENT
- INVERTEBRATE SURVEYS 2024
- BNG METRIC
- FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY REPORT
- SITE INVESTIGATION
- TIER 1: PRELIMINARY RISK ASSESSMENT
- LETTER OF SUPPORT
- EXTERNAL LIGHTING IMPACT ASSESSMENT
- LANDSCAPE AND VISUAL APPRAISAL
- PLANNING STATEMENT
- TRANSPORT STATEMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- TRAVEL PLAN AND HGV ROUTING STRATEGY
- LETTER OF SUPPORT 7 JULY 2026
- PREVIOUS PLANNING APPROVALS PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED ELEVATIONS
- LANDSCAPE BASE
- TREE RETENTION AND PROTECTION PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Thurrock for determination, against a statutory target of eight weeks. Over the last year Thurrock decided full applications in a median of 85 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Thurrock
-
26/01240/FUL Awaiting decision
Production House Princess Margaret Road East Tilbury Essex RM18 8RJ
Retrospective planning application for the retention of four existing roof-mounted refrigeration condenser units.
-
26/01225/FUL Awaiting decision
Avora Lounge Kings Walk Grays Essex RM17 6HR
The erection of a single-storey lean-to pergola structure, enclosed with full-height glazed panels set within slim black aluminium frames, with retractable roof within the rear garden.
-
26/01219/FUL Awaiting decision
70 Argent Street Grays Essex RM17 6PG
Change of use from C3 to C4 HMO
-
26/01217/FUL Awaiting decision
1 Wilsman Road South Ockendon Essex RM15 6QB
Application for the change of use of a dwelling (Use Class C3a) to a children's home for up to two children (Use Class C2), involving the conversion of a garage to an office.
-
26/01203/FUL Awaiting decision
Oozedam High Road Fobbing Essex SS17 9HT
Part demolition and alterations to the existing dwelling to provide a three-bedroom retained home; demolition of the pool enclosure and ancillary outbuildings; and erection of four detached dwellings, comprising one three-bedroom, two four-bedroom and one five-bedroom home, with access, parking, cycle and refuse storage, landscaping, biodiversity enhancement, drainage and associated works. The existing basement and electric entrance gates are retained.