Planning application
11 Merlin Way Leavesden Watford Hertfordshire WD25 7GJ
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of single storey rear extension with rooflights, partial conversion of the existing garage and alterations to fenestrations, including replacement of windows
As published by the council, reference 26/0303/FUL
Application record
- Reference
- 26/0303/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- approved
- Received
- 24 Feb 2026
- Validated
- 27 Mar 2026
- Decided
- 16 Jun 2026
- Ward
- Leavesden
- Parish
- Abbots Langley Parish Council
- Decision by
- Delegated Decision
- Postcode
- WD25 7GJ
Timeline
Dates from the published record
-
24 Feb 2026
Received by Three Rivers
-
27 Mar 2026
Validated
Checked as complete and ready for consideration.
-
16 Jun 2026
Decision issued: approved
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
47 Dowding Way Leavesden Watford Hertfordshire WD25 7GA
Demolition of existing conservatory and erection of a single storey rear extension including alterations to fenestration
Granted Full applications Extension Demolition +1 9 docsSmall domestic -
42 Dowding Way Leavesden WD25 7GA
Part single, part two storey rear extension
Granted Full applications Extension 15 docs -
35 Merlin Way Leavesden Watford Hertfordshire WD25 7GJ
Prior Approval: Single storey rear extension (maximum depth 4 metres, maximum height 3 metres and eaves height 2.7 metres)
Withdrawn Outline Extension 8 docsSmall domestic -
45 Dowding Way Leavesden Watford Hertfordshire WD25 7GA
Construction of front porch and conversion of garage into habitable accommodation.
Granted Full applications Extension 20 docsSmall domestic -
53-55 And Land To The Front Of 21-37 Cheshire Drive Cheshire Drive Leavesden WD25 7GP
Discharge of Condition 4 (Provision of Affordable Housing) pursuant to planning permission 19/1647/FUL
Decided Conditions 7 docs -
53-55 And Land To The Front Of 21-37 Cheshire Drive Leavesden Hertfordshire
Discharge of Condition 8 (Hard and Soft Landscaping) pursuant to planning permission 19/1647/FUL
Decided Conditions 3 docs
Other full applications applications
In Three Rivers
-
26/1384/FUL Awaiting decision
Swandrift Trout Rise Loudwater Rickmansworth Hertfordshire WD3 4JZ
Demolition of existing conservatory and construction of part single, part two storey rear extension, single storey side extension, extension to double garage to create first floor above with front/rear dormer windows; loft conversion including front/rear dormer windows and side/rear rooflights; construction of basement, rear balcony, new window to side elevation, patio extension and landscaping alterations including ramp.
-
26/1380/FUL Awaiting decision
Crossley Wylde Loudwater Lane Loudwater Rickmansworth Hertfordshire WD3 3JD
Installation of rooflights
-
26/1372/FUL Awaiting decision
108 Winton Drive Croxley Green Rickmansworth Hertfordshire WD3 3QT
Demolition of existing conservatory and side extension; construction of a single storey front, side and rear extension with rooflights
-
26/1365/FUL Awaiting decision
Morningside Bridle Lane Loudwater Rickmansworth Hertfordshire WD3 4JB
Construction of a single storey rear extension; conversion of garage into habitable accommodation; alterations to the fenestration
-
26/1358/FUL Awaiting decision
251 Baldwins Lane Croxley Green Rickmansworth Hertfordshire WD3 3LH
Variation of Condition 3 (Materials) Pursuant to planning permission 25/1526/RSP to allow alterations to materials.