Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Rear Of Sarre House Canterbury Road Sarre Kent

Awaiting decision Thanet F/TH/26/0363 Full Planning Permission

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 1no two storey 5 bed detached dwelling together with associated access, landscaping and parking (self-build)

As published by the council, reference F/TH/26/0363

Application record

Reference
F/TH/26/0363
Type
Full Planning Permission
Status
Awaiting decision
Received
8 Apr 2026
Validated
16 Apr 2026
Ward
Thanet Villages
Parish
Sarre Parish Council

Timeline

Dates from the published record

  1. 8 Apr 2026

    Received by Thanet

  2. 16 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Thanet took a median of 63 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Herne Bay

98 applications on PlanIndex · across 7 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Thanet for determination, against a statutory target of eight weeks. Over the last year Thanet decided full applications in a median of 84 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Thanet

  • F/TH/26/0505 Granted

    Land East And West Of Ebbsfleet Lane North Ramsgate Kent

    Delivery of archaeological mitigation works comprising soil stripping, excavation and archaeological recording, with subsequent reinstatement of the land and associated temporary works

    14 May 2026 Full applications
  • F/TH/26/0328 Refused

    15 Waldron Road Broadstairs Kent CT10 1TB

    Erection of 2no. 6-bed dwellings and associated parking, following demolition of existing dwelling (self-build)

    31 Mar 2026 Full applications
  • F/TH/26/0038 Granted

    69 Godwin Road And 57 Sweyn Road Margate Kent CT9 2HE

    Change of use from MOT testing station (Use class sui generis) to Commercial, Business, and Service use (Use Class E), together with erection of a single storey side extension and alterations to fenestration following partial demolition of existing building.

    15 Jan 2026 Full applications
  • F/TH/25/0905 Granted

    15 - 16 Hawley Square Margate Kent CT9 1PF

    Variation of condition 2 of planning permission F/TH/23/1658 for the "Change of use from office space (Class E) and 2No 2 bed flats to 5No 2-bed self-contained flats together with erection of balconies to rear elevation, installation of ground floor bay windows and provision of railings at ground and first floor on the front elevation and alterations to roof to facilitate rear roof terrace, installation of windows to replace existing with internal alterations" to allow extension to roof terrace and associated alterations to location of railings (part retrospective)

    18 Aug 2025 Full applications
  • F/TH/26/0371 Granted

    Hair Inspirations 13 High Street Garlinge Margate Kent CT9 5LN

    Change of use from hairdressers (Use class E) and 1no one bedroom flat, to 1no one bedroom flat and 1no two bedroom flat and replacement of shopfront with a window and door.

    9 Apr 2026 Full applications