Planning application
26/01376/FULLS
High Pines Heatherlands Road Chilworth Southampton Hampshire SO16 7JB
Proposal
Part retrospective application for the relocation and revised design of detached garage approved under planning permission 22/01499/FULLS
As published by the council, reference 26/01376/FULLS
Timeline
Dates from the published record
-
26 Jun 2026
Received by Test Valley
-
30 Jun 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Test Valley for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/03055/TPOS Refused
Kynance Heatherlands Road Chilworth Hampshire SO16 7JD
T1 - Oak - Fell, T2 - Cherry - fell
-
26/00101/TPOS Withdrawn
Birchwood Heatherlands Road Chilworth Southampton Hampshire SO16 7JD
Works as per submitted schedule
-
22/02603/FULLS Withdrawn
Kunjur House Pinelands Road Chilworth Hampshire SO16 7HH
First floor side extension, single storey side and rear extension
-
25/00275/TPO Granted
Rodeo Roman Road Southampton SO16 7HE
T1 Oak - Remove lowest secondary branch on over extended primary back to point of origin and reduce remaining branch tips back by 2m to suitable growth points. T2 Oak - Remove over extended tertiary branch growing towards property back to point of origin. Remove over extended secondary branch over property back to point of origin. Reduce remaining primary branch over the property back by 2m to suitable growth points. T3 Oak - (info only) Remove large hanging branch.
-
26/01564/TPOS Awaiting decision
Kingfishers 2 Chilworth Grange Chilworth Southampton Hampshire SO16 7QH
(T1) Pine - Removal of 2 lowest branches overhanging driveway and dead, dying material removed from tree (T2) Copper Beech - Crown raise by up to 3m (T3) Oak - Crown raise by up to 3m and 1 branch removed growing towards dovecote (T4) Yew tree - Removal of 4 lowest branches in their entirety (T5) Chestnut - Removal of epicormic growth
-
26/00788/TPOS Refused
Knightswood 8 Hadrian Way Chilworth Southampton Hampshire SO16 7HY
T1 - Silver Fir (Abies alba) - Fell, G1 - Scots Pine Group (Pinus sylvestris) x 5 - Crown lift by removing the lowest limb from each tree
Other full applications applications
In Test Valley
-
26/01224/FULLS Decided
4 Rectory Hill West Dean Salisbury Wiltshire SP5 1JL
Replacement porch, two storey side extension, single storey rear extension, replacement garage and construction of vehicular access
-
26/01634/FULLN Awaiting decision
8 Cheavley Close Andover Hampshire SP10 3NH
Single storey rear extension
-
26/01623/FULLS Awaiting decision
85 Upton Crescent Nursling Southampton Hampshire SO16 8AA
Replacement outbuilding for use as home office/games room
-
26/01628/FULLN Awaiting decision
142 Weyhill Road Andover Hampshire SP10 3BG
Two storey and part single storey rear extensions and single storey side extension with replacement flat roof over garage
-
26/01626/FULLS Awaiting decision
Hazeldene Sandy Lane Abbotswood Romsey Hampshire SO51 0PD
Single storey rear, and first floor front extensions, new dormer windows at second floor, and alterations to windows and doors