Barton Stacey Service Station Basingstoke Road Barton Stacey Winchester Hampshire SO21 3NF

Awaiting decision Test Valley 26/00829/FULLN FULL APPLICATION - NORTH

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Alterations to forecourt canopy, relocation of fuel pumps, installation of fuel pump, creation of charging zone, erection of EV chargers with canopy, sub-station enclosure, LV panel, meter cabinet and associated forecourt works including removal and replacement below-ground petrol interceptor, and vent pipe

As published by the council, reference 26/00829/FULLN

Application record

Reference
26/00829/FULLN
Type
FULL APPLICATION - NORTH
Status
Current
Received
22 Apr 2026
Validated
18 May 2026
Ward
HAREWOOD
Parish
BARTON STACEY
Postcode
SO21 3NF

Timeline

Dates from the published record

  1. 22 Apr 2026

    Received by Test Valley

  2. 18 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Test Valley took a median of 51 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

CarneySweeney Ltd Agent, registered in Farnham

Active · incorporated 2019 · Farnham

493 applications on PlanIndex · across 101 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Motor Fuel Group Limited Applicant, registered in Hertfordshire

Active · incorporated 2007 · Hertfordshire

69 applications on PlanIndex · across 52 councils · 88% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

  • AMENDED - EV CANOPY AND CHARGER Drawing · 01 Sep 2026
  • ADDITIONAL - EV CANOPY LIGHTING LAYOUT Drawing · 01 Sep 2026
  • ADDITIONAL - SURFACE WATER DRAINAGE STRATEGY Supporting Information · 17 Aug 2026
  • ADDITIONAL - NOISE SURVEY Supporting Information · 17 Aug 2026
  • HIGHWAYS (HCC) Consultation Responses · 17 Jun 2026
  • ECOLOGY (TVBC) Consultation Responses · 09 Jun 2026
  • MR TREVOR BULPIT(FULL) Public Comments · 05 Jun 2026
  • ENVIRONMENTAL PROTECTION TEAM (TVBC) Consultation Responses · 05 Jun 2026
  • ENVIRONMENT AGENCY Consultation Responses · 04 Jun 2026
  • ENVIRONMENT AGENCY Consultation Responses · 04 Jun 2026
  • NATIONAL HIGHWAYS Consultation Responses · 04 Jun 2026
  • TREES (TVBC) Consultation Responses · 29 May 2026
  • ADDITIONAL - VEHICLE TRACKING LAYOUT Drawing · 28 May 2026
  • DR SUSAN RICHARDS(FULL) Public Comments · 27 May 2026
  • MR GRAHAM STURGESS(FULL) Public Comments · 23 May 2026
  • HIGHWAYS (HCC) Consultation Responses · 21 May 2026
  • HEALTH AND SAFETY EXECUTIVE Consultation Responses · 19 May 2026
  • APPLICATION FORM Supporting Information · 18 May 2026
  • COVERING LETTER Supporting Information · 18 May 2026
  • EXISTING LAYOUT PLAN Drawing · 18 May 2026
  • PROPOSED LAYOUT PLAN Drawing · 18 May 2026
  • SUBSTATION ENCLOSURE DETAILS Drawing · 18 May 2026
  • LV ENCLOSURE DETAILS Drawing · 18 May 2026
  • METER CABINET DETAILS Drawing · 18 May 2026
  • BLOCK PLAN Drawing · 18 May 2026
  • LOCATION PLAN Drawing · 18 May 2026
  • EXISTING SITE ELEVATIONS Drawing · 18 May 2026
  • PROPOSED SITE ELEVATIONS Drawing · 18 May 2026
  • INTERCEPTOR DETAILS Drawing · 18 May 2026
  • BIODIVERSITY CHECKLIST Supporting Information · 18 May 2026
  • PLANNING STATEMENT Supporting Information · 18 May 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Test Valley for determination, against a statutory target of eight weeks. Over the last year Test Valley decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Test Valley

  • 25/02823/FULLS Refused

    Land Adjacent To Walnut Court Winchester Road Kings Somborne Stockbridge Hampshire SO20 6NZ

    Erect 2 detached dwellings and associated landscaping works

    27 Nov 2025 Full applications
  • 26/00987/FULLS Granted

    Meadowside Romsey Road East Wellow Romsey Hampshire SO51 6BG

    Increase in roof height to facilitate additional storey and installation of dormer windows

    12 May 2026 Full applications
  • 26/00400/FULLN Granted

    23 Hedge End Road Andover Hampshire SP10 2DH

    Single storey rear extension, removal of chimney, alterations to, and increase in height of roof to provide first floor accommodation, alterations to fenestration, erection of fence and construction of raised patio

    27 Feb 2026 Full applications
  • 25/02805/FULLS Granted

    Shorts Farm Scallows Lane West Wellow Romsey Hampshire SO51 6DX

    Demolition of stable, conversion and extension of stables to create two dwellings, bike and bin store together with associated operational development, parking and landscaping

    25 Nov 2025 Full applications
  • 26/00281/FULLS Granted

    Little Beeches Braishfield Road Crookhill Romsey Hampshire SO51 0QB

    Roof extensions to bungalow, erect garage, and front boundary fence (retrospective)

    11 Feb 2026 Full applications