Planning application
The Fairground Site Romsey By-Pass Romsey Hampshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of up to one hundred and nine residential dwellings with associated vehicular and pedestrian access, parking and landscaping
As published by the council, reference 26/00157/FULLS
Application record
- Reference
- 26/00157/FULLS
- Type
- FULL APPLICATION - SOUTH
- Status
- Current
- Received
- 27 Jan 2026
- Validated
- 27 Jan 2026
- Ward
- ROMSEY ABBEY
- Parish
- ROMSEY TOWN
Timeline
Dates from the published record
-
27 Jan 2026
Received by Test Valley
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Test Valley took a median of 52 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
172 documents on file for this application
- YOUNG
- NATURAL ENGLAND
- AMENDED NUTRIENT CALCULATION
- ADDITIONAL - HABITAT REGULATIONS ASSESSMENT
- CONSERVATION (TVBC)
- ADDITIONAL - VIABILITY ASSESSMENT
- ECOLOGY (TVBC)
- ADDITIONAL - TECHNICAL NOTE
- REFUSE - ENVIRONMENTAL SERVICES (TVBC)
- MS SUSAN LAWES(FULL)
- SOUTHERN WATER
- MINERALS & WASTE (HCC)
- ROMSEY & DISTRICT SOCIETY (NATURAL ENVIRONMENT COMMITTEE)
- ADDITIONAL - MINERAL RESOURCE ASSESSMENT 12154OR01
- HIGHWAYS
- POLICY (TVBC)
- ROMSEY & DISTRICT SOCIETY (PLANNING COMMITTEE)
- ADDITIONAL - FURTHER CONSERVATION COMMENTS
- ROMSEY TOWN COUNCIL
- TREES (TVBC)
- SEALEY
- CHILDREN'S SERVICES (HCC)
- NATURESPACE
- NATURE SPACE
- FLOOD WATER MANAGEMENT (HCC)
- CONSERVATION (TVBC)
- ENVIRIONMENT AGENCY
- LANDSCAPE (TVBC)
- ECOLOGY (TVBC)
- HISTORIC ENGLAND
- HEALTH PROMOTION (COMMUNITY AND LEISURE) TVBC
- CHILDREN SERVICES (HCC)
- NHS LOCAL PLANNING AUTHORITY
- MS SOPHIE AYLING(FULL)
- COUGHLIN
- HOUSING (TVBC)
- HOUSING (TVBC)
- COUGHLIN
- BLENCOWE
- ADDITIONAL - PROPOSED SURFACE WATER STRATEGY
- ADDITIONAL - SURFACE WATER CATCHMENT PLAN
- ADDITIONAL - SURFACE WATER EXCEEDANCE PLAN
- ADDITIONAL - PROPOSED FOUL WATER STRATEGY
- ADDITIONAL - PROPOSED PRELIMINARY LEVELS STRATEGY
- ADDITIONAL - TYPICAL HIGHWAY CONSTRUCTION DETAILS
- ADDITIONAL - FLOOD RISK ASSESSMENT AND DEVELOPMENT DRAINAGE STRATEGY (1/2)
- ADDITIONAL - FLOOD RISK ASSESSMENT AND DEVELOPMENT DRAINAGE STRATEGY (2/2)
- ECONOMIC DEVELOPMENT TVBC
- CHILDRENS SERVICES (HCC)
- ENVIRONMENT AGENCY
- MINERALS WASTE (HCC)
- ARCHAEOLOGY (HCC)
- APPLICATION FORM
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- ENVIRONMENTAL NOISE ASSESSMENT
- BIODIVERSITY NET GAIN ASSESSMENT
- ECOLOGICAL ASSESSMENT
- BIODIVERSITY METRIC CALCULATION TOOL
- BIODIVERSITY METRIC CALCULATION TOOL
- LANDSCAPE & VISUAL IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT AND METHOD STATEMENT
- TREE PROTECTION PLAN
- TREE PROTECTION PLAN
- TREE PROTECTION PLAN
- TREE PROTECTION PLAN
- HERITAGE STATEMENT
- BIODIVERSITY CHECKLIST
- WALKING, CYCLING, HORSE-RIDING ASSESSMENT
- TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT
- TRAVEL PLAN
- HARD SURFACE PLAN
- HARD SURFACE PLAN
- HARD SURFACE PLAN
- PLANTING PLAN OVERVIEW
- PLANTING PLAN
- PLANTING PLAN
- PLANTING PLAN
- PLANTING PLAN
- AFFORDABLE HOUSING STATEMENT
- PLANNING STATEMENT
- BLOCK A - SECOND FLOOR PLAN
- BLOCK A - ROOF PLAN
- BLOCK B - ROOF PLAN
- BLOCK A - FIRST FLOOR PLAN
- BLOCK A - GROUND FLOOR PLAN
- BLOCK B - SECOND FLOOR PLAN
- BLOCK B - GROUND FLOOR PLAN
- BLOCK B - FIRST FLOOR PLAN
- BLOCK A - ELEVATIONS
- BLOCK A - ELEVATIONS
- BLOCK B - ELEVATIONS
- BLOCK C - GROUND FLOOR PLAN
- BLOCK D - GROUND FLOOR PLAN
- BLOCK B - ELEVATIONS
- BLOCK B - ELEVATIONS
- BLOCK C - ELEVATIONS
- BLOCK C - ROOF PLAN
- BLOCK C - ELEVATIONS
- BLOCK C - FIRST FLOOR PLAN
- BLOCK C - SECOND FLOOR PLAN
- BLOCK D - ROOF PLAN
- BLOCK D - ELEVATIONS
- HT-02 - PLANS
- BLOCK D - SECOND FLOOR PLAN
- BLOCK D - FIRST FLOOR PLAN
- HT-01 - ELEVATIONS
- HT-01 ELEVATIONS
- HT-01 - FLOOR PLANS
- BLOCK D - ELEVATIONS
- HT-01 FLOOR PLANS
- HT-03 - ELEVATIONS
- HT-04 - FLOOR PLANS
- HT-06 - FLOOR PLANS
- HT-03 PLANS
- HT-02 ELEVATIONS
- HT-05 - ELEVATIONS
- HT-04 - ELEVATIONS
- HT-05 - FLOOR PLANS
- HT-04 ELEVATIONS
- HT-04 - FLOOR PLANS
- HT-07 - ELEVATIONS
- HT-09 - FLOOR PLANS
- HT-11 - SPECIAL ELEVATIONS
- HT-07 - FLOOR PLANS
- HT-06 - ELEVATIONS
- HT-11 SPECIAL C FLOOR PLANS
- HT-10 ELEVATIONS
- HT-10 - ELEVATIONS
- HT-09 - ELEVATIONS
- HT-10 - FLOOR PLANS
- HT-12 - SPECIAL D ELEVATIONS
- HT-12 - SPECIAL D ELEVATIONS
- HT-16 - FLOOR PLANS
- HT-12 - SPECIAL D ELEVATIONS
- HT-12 - SPECIAL D FLOOR PLANS
- HT-15 - ELEVATIONS
- HT-13 - ELEVATIONS
- HT-15 - FLOOR PLANS
- HT-12 - SPECIAL D ELEVATIONS
- HT-13 - FLOOR PLANS
- HT-17 - ELEVATIONS
- HT-18 - FLOOR PLANS
- HT-21 - FLOOR PLANS
- HT-17 - FLOOR PLANS
- HT-16 - ELEVATIONS
- HT-20 - ELEVATIONS
- HT-19 - ELEVATIONS
- HT-20 - FLOOR PLANS
- HT-18 - ELEVATIONS
- HT-19 - FLOOR PLANS
- SINGLE GARAGE
- DOUBLE GARAGES
- HT-22 - FLOOR PLANS
- HT-22 - ELEVATIONS
- HT-21 - ELEVATIONS
- PERGOLA OVER PARKING BAYS
- BIN AND CYCLE STORE
- CARPORT
- DEVELOPMENT MIX
- BUILDING HEIGHTS
- DETAILED MASTERPLAN
- ROOF PLAN
- SITE LOCATION PLAN
- CAR PARKING
- DESIGN MATRIX
- TENURE AND AFFORDABLE MIX
- WALL MATERIALS
- CONTEXT STREET ELEVATIONS
- CONTEXT STREET SCENE
- DESIGN AND ACCESS STATEMENT - LANDSCAPE
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Test Valley for determination, against a statutory target of eight weeks. Over the last year Test Valley decided full applications in a median of 59 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Romsey Town Football Club Southampton Road Romsey Hampshire SO51 8AF
Retention of 2 keep nets
Granted Full applications 16 docs -
53 The Harrage Romsey Hampshire SO51 8AE
T1 - Yew - Prune back to previous and established pruning points
Granted Trees 7 docs -
54 Palmerston Street Romsey Hampshire SO51 8GG
T1 - London Plane - Remove deadwood, hanging branches, basal growth and epicormic growth, T2 - London Plane - Remove deadwood and remains of infected massaria branch, and remove epicormic growth, T3 - London Plane - Remove deadwood, and epicormic growth, T4 - London Plane - Remove deadwood, basal growth and epicormic growth
Granted Trees 5 docs -
-
Brook House 3 The Harrage Romsey Hampshire SO51 8AE
T1 Yew - Shorten sides by up to 2m, reduce size by up to 2m, crown raise by up to 0.5m, remove crossing and weak branches
Refused Trees 5 docs -
Romsey Town Football Club South Front Romsey Hampshire SO51 8AF
Retention of food kiosk and merchandise outlet
Granted Full applications 11 docs
Other full applications
In Test Valley
-
26/01910/FULLS Awaiting decision
Drove Farm Cottage Dean Road West Dean Salisbury Hampshire SP5 1JW
Erect oak framed garage
-
26/01901/FULLS Awaiting decision
Squirrels Gate Romsey Road East Wellow Romsey Hampshire SO51 6BG
Proposed roof extension to form front gable
-
26/01876/FULLN Awaiting decision
42 Greensey Ragged Appleshaw Andover Hampshire SP11 9HY
Creation of raised rear patio area with associated retaining structure, steps and planters
-
26/01857/FULLS Awaiting decision
Site Of Tin Tabernacle Salisbury Road Sherfield English Romsey Hampshire SO51 6FL
Renovation, extension and change of use of Tin Tabernacle building to be used as a single dwelling, with associated engineering, access and landscape works
-
25/02823/FULLS Refused
Land Adjacent To Walnut Court Winchester Road Kings Somborne Stockbridge Hampshire SO20 6NZ
Erect 2 detached dwellings and associated landscaping works