Planning application
TA/2025/0742
Lincoln Cottage, Hodge Bower, Ironbridge, Telford, Telford And Wrekin, TF8 7QG
Proposal
Variation of condition 7 of planning application TWC/2024/0374 (Erection of a first floor side extension including extension of existing rear balcony, removal and replacement of 5no. doors and 1no. window to rear, and removal of 1no. window and creation of 1no. door to West elevation, renewal of existing stone dressed wall to North elevation, and replacement of existing glazed roofing to felted flat roof and the installation of 4no. rooflight windows to North elevation) to allow amendments to previously approved plans
As published by the council, reference TA/2025/0742
Timeline
Dates from the published record
-
2 Jun 2025
Received by Telford and Wrekin
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Telford and Wrekin for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
TA/2025/1177 Awaiting decision
Lincoln Cottage, Hodge Bower, Ironbridge, Telford, Shropshire, TF8 7QG
Felling of 2no. Lawson Cypress trees (T1 and T2)
-
TA/2025/0349 Awaiting decision
28 Church Hill, Ironbridge, Telford, TF8 7PZ
Tree Works
-
TA/2025/1238 Awaiting decision
27 Church Hill, Ironbridge, Telford, Shropshire, TF8 7PZ
Erection of summerhouse
-
TA/2025/1171 Awaiting decision
11 Hodge Bower, Ironbridge, Telford, Shropshire, TF8 7QG
Felling of 1no. Rowan Tree (T)
-
TA/2025/1141 Awaiting decision
Land Adjacent 9-11 Hodge Bower, Ironbridge, Telford, Shropshire
Felling of 1no. Rowan tree
-
TA/2021/1187 Awaiting decision
58 Hodge Bower, Ironbridge, Telford, Shropshire, TF8 7QE
Proposed first floor garage conversion to habitable space and installation of an external staircase
Other full applications applications
In Telford and Wrekin
-
TWC/2026/0487 Granted
Fielden House, 30 Chetwynd Aston, Newport, Shropshire, TF10 9LF
Change of use of residential care home (Use Class C2) to a dwellinghouse (Use Class C3)
-
TWC/2026/0474 Withdrawn
23 Deercote, Hollinswood, Telford, Shropshire, TF3 2BH
Change of use of dwelling (Use Class C3) to a Children's Care Home providing short breaks and overnight provision only for up to 2 children (Use Class C2)
-
TWC/2026/0382 Granted
Upperhill House, Pave Lane, Chetwynd Aston, Newport, Shropshire, TF10 9LG
Replacement and enlargement of 3no. dormer windows to side and rear
-
TWC/2026/0554 Awaiting decision
Meadow Barn, Hall Barns, Walton, Telford, Shropshire, TF6 6AR
Conversion of a former agricultural building to a single dwellinghouse, together with the change of use of adjoining land to residential curtilage (Retrospective)
-
TWC/2026/0458 Withdrawn
111 Haygate Road, Wellington, Telford, Shropshire, TF1 2BU
Erection of a single storey side and rear extension