Skip to content
PlanIndex Get alerts
Menu

Planning application

13 Weech Road Dawlish Devon EX7 9BW

Granted Teignbridge 26/00578/LBC Listed Building Consent

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Restoration and conversion of existing buildings into six dwellings, construction of new build dwelling and associated demolition, landscaping, infrastructure and works

As published by the council, reference 26/00578/LBC

Application record

Reference
26/00578/LBC
Type
Listed Building Consent
Status
Approved
Decision
Granted As published: CONSERVATION/LBC/LBD APPROVAL
Received
31 Mar 2026
Validated
7 Apr 2026
Decided
3 Aug 2026
Ward
Dawlish South West
Parish
DAWLISH
Decision by
Delegated Decision
Postcode
EX7 9BW

Site history

Applications at this address on the Teignbridge register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/00577/FUL Granted

    13 Weech Road Dawlish Devon EX7 9BW

    Restoration and conversion of existing buildings into six dwellings, construction of new build dwelling and associated demolition, landscaping, infrastructure and works

    Decided 3 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 31 Mar 2026

    Received by Teignbridge

  2. 7 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. 3 Aug 2026

    Decision issued: CONSERVATION/LBC/LBD APPROVAL

Who's behind it

Company information only, from the register and Companies House

Bell Cornwell LLP Agent, registered in Hook

Active · incorporated 2008 · Hook

546 applications on PlanIndex · across 58 councils · 78% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

49 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Teignbridge granted permission on 3 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 13 Weech Road Dawlish Devon EX7 9BW

    26/00577/FUL Submitted 31 Mar 2026 50 yards away

    Restoration and conversion of existing buildings into six dwellings, construction of new build dwelling and associated demolition, landscaping, infrastructure and works

    Granted Full applications New dwelling Demolition 65 docs
    Several homes
  • Bridge House 2 Church Street Dawlish Devon EX7 9AU

    25/01537/FUL Submitted 17 Sep 2025 150 yards away

    79% historically approved · decision due ~18 Nov

    Removal of greenhouse and polytunnel, construction of two maintenance buildings with alterations to access

    Awaiting decision Full applications 31 docs
  • Aller Hill Allotments Dawlish

    25/01292/TPOE Submitted 4 Aug 2025 150 yards away

    Fell dead Oak tree

    Decided Trees 3 docs
  • 27A Badlake Hill Dawlish EX7 9BA

    23/00070/COND2 Submitted 21 Aug 2025 200 yards away

    Discharge of Condition 6 (external materials) on planning permission 23/00070/FUL - Dwelling with integral garage

    Decided Conditions 4 docs
    Domestic
  • 27 Badlake Hill Dawlish Devon EX7 9BA

    26/01269/CLDP Submitted 6 Aug 2026 200 yards away

    71% historically approved · decision due ~1 Oct

    Certificate of Lawfulness for proposed conversion and alteration of the existing detached garage to provide accommodation incidental to the enjoyment of the dwellinghouse

    Awaiting decision Lawful development 9 docs
    Domestic
  • Bridge House 2 Church Street Dawlish Devon EX7 9AU

    25/02135/CAN Submitted 22 Dec 2025 250 yards away

    T015 - Liquidamber styraciflua - Fell to ground level or monolith the stem to create habitat 3m, depending on site constraints and client preference. Monolithing to be carried out with staged reduction cuts to leave a stable standing trunk. T003 - Pine (Pinus sp.) - Carry out light end-weight reduction on the over-extended laterals. Install Cobra bracing on six scaffold limbs in a static fall-arrest configuration.

    Granted Heritage and listed buildings Trees 7 docs

In Teignbridge

  • 26/01524/LBC Awaiting decision

    1 Southey Lane Kingskerswell Devon TQ12 5JF

    Engineering works to stone retaining wall and replacement of asbestos cement roof tiles with natural slate tiles

    Received 28 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • 26/01511/LBC Awaiting decision

    7 Barton Terrace Dawlish Devon EX7 9QH

    Cap off two chimney stacks below roof level and slate over

    Received 25 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • 26/01512/CAN Awaiting decision

    9 Brook Close Holcombe Devon EX7 0JS

    T1 Ash - Pollard tree to approximately 8m from ground level.

    Received 25 Sep, published by the council 30 Sep 2026 Heritage and listed buildings
  • 26/01509/CAN Awaiting decision

    St Michaels Church Of England Primary School Church Street Kingsteignton Devon TQ12 3BQ

    Tree 1 - Pittosporum - Sectional Fell / Dismantle Tree 2 - Ash - Sectional Fell / Dismantle

    Received 25 Sep, published by the council 30 Sep 2026 Heritage and listed buildings
  • 26/01502/CAN Awaiting decision

    The Manor House Old Town Street Dawlish Devon EX7 9AP

    T1 - Norway spruce - Fell to ground level by sectional dismantling T2 - Conifer - Fell to ground level by sectional dismantling

    Received 24 Sep, published by the council 28 Sep 2026 Heritage and listed buildings