Planning application

26/00577/FUL

13 Weech Road Dawlish Devon EX7 9BW

Awaiting decision Teignbridge Full Planning Application

Proposal

Restoration and conversion of existing buildings into six dwellings, construction of new build dwelling and associated demolition, landscaping, infrastructure and works

As published by the council, reference 26/00577/FUL

Timeline

Dates from the published record

  1. 31 Mar 2026

    Received by Teignbridge

  2. 7 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Teignbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00578/LBC Awaiting decision

    13 Weech Road Dawlish Devon EX7 9BW

    Restoration and conversion of existing buildings into six dwellings, construction of new build dwelling and associated demolition, landscaping, infrastructure and works

    31 Mar 2026 0m away Heritage and listed buildings
  • 25/01537/FUL Awaiting decision

    Bridge House 2 Church Street Dawlish Devon EX7 9AU

    Removal of greenhouse and polytunnel, construction of two maintenance buildings with alterations to access

    17 Sep 2025 118m away Full applications
  • 25/01292/TPOE Decided

    Aller Hill Allotments Dawlish

    Fell dead Oak tree

    4 Aug 2025 125m away Trees
  • 23/00070/COND2 Decided

    27A Badlake Hill Dawlish EX7 9BA

    Discharge of Condition 6 (external materials) on planning permission 23/00070/FUL - Dwelling with integral garage

    21 Aug 2025 171m away Conditions
  • 25/02135/CAN Granted

    Bridge House 2 Church Street Dawlish Devon EX7 9AU

    T015 - Liquidamber styraciflua - Fell to ground level or monolith the stem to create habitat 3m, depending on site constraints and client preference. Monolithing to be carried out with staged reduction cuts to leave a stable standing trunk. T003 - Pine (Pinus sp.) - Carry out light end-weight reduction on the over-extended laterals. Install Cobra bracing on six scaffold limbs in a static fall-arrest configuration.

    22 Dec 2025 212m away Heritage and listed buildings
  • 26/00927/CAN Awaiting decision

    Bridge House 2 Church Street Dawlish Devon EX7 9AU

    G1 - Group of Mature Sycamore Trees (5) Growing From Dawlish Recreation Ground -Prune back side/lateral branch growth edge by removing approximately 3.0 metres from branch tips. T2 - 1x Ash Tree - Remove the over-extended lateral limb by removing 3.0 metres from branch tips, pruning back to a suitable growth point T3 - 1x Alder Tree - Remove the small lowest limb pruning back to the parent stem/appropriate growth point to maintain a balanced crown form by removing 2.0 metres from the branch tip.

    9 Jun 2026 212m away Heritage and listed buildings

In Teignbridge

  • 26/01210/FUL Awaiting decision

    Cross Park Farm Heath Cross Whitestone Devon EX4 2HN

    Part retention for the erection of 3 light industrial buildings and associated infrastructure

    27 Jul 2026 Full applications
  • 26/00715/FUL Refused

    Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX

    Proposed solar boundary fence (approx. 13 kW renewable energy installation)

    24 Apr 2026 Full applications
  • 26/01176/FUL Awaiting decision

    Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ

    Retention of air source heat pump and two condensing units to flat roof

    21 Jul 2026 Full applications
  • 26/01168/FUL Awaiting decision

    Red Lion Inn Tedburn St Mary Devon EX6 6EQ

    Extension and alterations to existing public house and associated works

    20 Jul 2026 Full applications
  • 26/01133/FUL Awaiting decision

    Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN

    Removal of the existing weir including site grading where the weir was and bank protection

    16 Jul 2026 Full applications