Skip to content
PlanIndex Get alerts
Menu

Planning application

Rose Cottage Laburnum Road Newton Abbot Devon TQ12 4LH

Awaiting decision Teignbridge 26/00530/HOU Householder applications

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Raising the roof of the existing bungalow to provide additional living accommodation and new single story extension to the rear

As published by the council, reference 26/00530/HOU

Application record

Reference
26/00530/HOU
Type
Householder applications
Status
Pending Consideration
Received
25 Mar 2026
Validated
2 Apr 2026
Ward
Buckland And Milber
Parish
NEWTON ABBOT
Postcode
TQ12 4LH

Timeline

Dates from the published record

  1. 25 Mar 2026

    Received by Teignbridge

  2. 2 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 28 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Teignbridge took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Co Create Architects Agent, an architecture practice

81 applications on PlanIndex · across 6 councils · 84% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Teignbridge for determination, against a statutory target of eight weeks. Over the last year Teignbridge decided householder applications in a median of 57 days. More in our guide to how long planning decisions take.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 21 Beechwood Avenue Newton Abbot Devon TQ12 4LJ

    26/01219/TPO Submitted 28 Jul 2026 50 yards away

    Reduce the overall height of the Monterey pine by approximately 20%. Reduce the branches overhanging

    Refused Trees 20 docs
  • 21 Beechwood Avenue Newton Abbot Devon TQ12 4LJ

    26/01508/TPO Submitted 25 Sep 2026 100 yards away

    93% historically approved · decision due ~20 Nov

    Monterey Pine: prune the tree in height by 10% and prune back branches by 40% which overhang.

    Awaiting decision Trees
  • 55 St Lukes Road Newton Abbot Devon TQ12 4ND

    25/02039/HOU Submitted 8 Dec 2025 100 yards away

    Extensions to form new living and dining accommodation, new porch and extension of existing garage forming link with dwelling and utility/WC area

    Granted Householder Extension 21 docs
    Small domestic
  • 4 Church Way Newton Abbot TQ12 4NB

    25/00468/AMD1 Submitted 28 Aug 2025 150 yards away

    Non-material amendment (change flat roof with glass rooflights to lean-to roof & 3 no. rooflights and door/windows changed to white upvc) on planning permission 25/00468/HOU - Single storey rear extension with raised terrace and conversion of garage to a domestic gym

    Granted Amendments Extension Loft or dormer +1 10 docs
    Small domestic
  • St Lukes Church Hall Laburnum Road Newton Abbot

    25/00835/COND1 Submitted 5 Mar 2026 150 yards away

    Discharge of Condition 4 - (Bin Collection Plan) in relation to application 25/00835/FUL - Change of use from Class F1 to mixed use Class E (Commercial, Business and Service) to enable the nursery to operate from the hall, and erection of a 1.2m fence

    Decided Conditions 4 docs
    Small domestic
  • 21 Rowantree Road Newton Abbot Devon TQ12 4LL

    26/00859/CLDP Submitted 21 May 2026 200 yards away

    71% historically approved · decision due ~24 Jul

    Certificate of Lawfulness for proposed renovation of the existing lean-to extension including replacing the lean-to roof

    Awaiting decision Lawful development Extension 6 docs

In Teignbridge

  • 26/01545/HOU Awaiting decision

    Cider Barn Whitestone Devon EX4 2JJ

    Single storey rear extension creating additonal living space

    Received 1 Oct, published by the council 5 Oct 2026 Householder
  • 26/01549/HOU Awaiting decision

    1 Elm Grove Teignmouth Devon TQ14 8SA

    Demolition of existing conservatory and construction of single storey rear/side extension with pitched gabled roofs, formation of a rear terrace with 1800mm high obscure glazed privacy screens to both side elevations, improved stepped garden access, fenestration and material upgrades and associated surface water drainage and biodiversity enhancements

    Received 1 Oct, published by the council 5 Oct 2026 Householder
  • 26/01543/HOU Awaiting decision

    29 Weavers Way Kingskerswell Devon TQ12 5HY

    Single storey side and rear extension and loft conversion including raising of roof and rear dormer

    Received 30 Sep, published by the council 5 Oct 2026 Householder
  • 26/01523/HOU Awaiting decision

    1 Southey Lane Kingskerswell Devon TQ12 5JF

    Engineering works to stone retaining wall and replacement of asbestos cement roof tiles with natural slate tiles

    Received 28 Sep, published by the council 5 Oct 2026 Householder
  • 26/01521/HOU Awaiting decision

    1 Winterbourne Road Teignmouth Devon TQ14 8JT

    Replacement of an existing single storey conservatory and flat roofed structure with a single storey living room extension, alongside external alterations including altered fenestration, updated render and timber cladding finishes, insertion of two second-floor sun tunnels and associated internal reorganisation across ground, first, and second floor levels

    Received 28 Sep, published by the council 30 Sep 2026 Householder