Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00284/FUL

Land Adjacent To No 2 Dawlish Lawn The Strand Dawlish EX7 9PW

Awaiting decision Teignbridge Full Planning Application

Proposal

Installation of security fencing around a new substation

As published by the council, reference 26/00284/FUL

Timeline

Dates from the published record

  1. 20 Feb 2026

    Received by Teignbridge

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Teignbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00522/FUL Granted

    The Lawn Tourist Information Centre The Strand Dawlish Devon EX7 9PW

    2.0m high metal fencing and gates to the front and rear

    24 Mar 2026 42m away Full applications
  • 26/00587/FUL Refused

    The Lawn Tourist Information Centre The Strand Dawlish Devon EX7 9PW

    Pergola and seating

    31 Mar 2026 44m away Full applications
  • 26/00923/CAN Awaiting decision

    16A The Strand Dawlish Devon EX7 9PS

    T1- Ash - coppices back to ground level. Trees approximately 8inchs at base growing out of the top of a wall over hanging property and T2- Ash/hazel - re coppice back to ground level.

    7 Jun 2026 76m away Heritage and listed buildings
  • 26/00517/LBC Refused

    15 The Strand Dawlish Devon EX7 9PS

    Creation of rear roof dormer, railings to rear flat roof to form means of escape and internal alterations to first floor

    23 Mar 2026 85m away Heritage and listed buildings
  • 26/00516/FUL Refused

    15 The Strand Dawlish Devon EX7 9PS

    Creation of rear roof dormer, railings to rear flat roof to form means of escape and internal alterations to first floor

    23 Mar 2026 85m away Full applications
  • 26/01079/FUL Awaiting decision

    15 The Strand Dawlish Devon EX7 9PS

    Creation of rear escape rooflight and smoke vent, railings to rear flat roof to form means of escape and internal alterations to first floor

    2 Jul 2026 85m away Full applications

In Teignbridge

  • 26/01210/FUL Awaiting decision

    Cross Park Farm Heath Cross Whitestone Devon EX4 2HN

    Part retention for the erection of 3 light industrial buildings and associated infrastructure

    27 Jul 2026 Full applications
  • 26/00715/FUL Refused

    Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX

    Proposed solar boundary fence (approx. 13 kW renewable energy installation)

    24 Apr 2026 Full applications
  • 26/01176/FUL Awaiting decision

    Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ

    Retention of air source heat pump and two condensing units to flat roof

    21 Jul 2026 Full applications
  • 26/01168/FUL Awaiting decision

    Red Lion Inn Tedburn St Mary Devon EX6 6EQ

    Extension and alterations to existing public house and associated works

    20 Jul 2026 Full applications
  • 26/01133/FUL Awaiting decision

    Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN

    Removal of the existing weir including site grading where the weir was and bank protection

    16 Jul 2026 Full applications