Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00149/MAJ

Land At Langdon Dawlish EX7 0NS

Awaiting decision Teignbridge Major Application

Proposal

Variation of Condition 1 (approved plans) on planning permission 19/01767/MAJ (Reserved Matters approval for 190 dwellings and associated works (approval sought for appearance, landscaping, layout and scale) pursuant to Outline Planning Permission 18/02404/MAJ (Variation of Outline application for phased development of up to 200 dwellings, 3 hectares of employment land, including a 64 bed care home, highway works, demolition works to ancillary healthcare buildings, incidental and equipped open space, internal vehicular, pedestrian and cycle links, drainage attenuation works (approval sought for access) ) to regularise differences between the as built and approved scheme and submission of information to satisfy conditions 2 (Surface Water Management Plan), 3(Surface Water Drainage Systems), 7 (Play Space and Green Infrastructure) and 8 (Hard and soft landscaping)

As published by the council, reference 26/00149/MAJ

Timeline

Dates from the published record

  1. 29 Jan 2026

    Received by Teignbridge

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Teignbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00532/TPO Granted

    Devon Partnership NHS Trust Langdon Hospital Dawlish EX7 0NR

    Fell one sycamore (T34). Crownlift trees within G11 adjacent to proposed footpath to achieve 3m ground clearance. Works to G11 and T34 are required to install a footpath as part of a consented planning application. Remove three branches overhanging road on poplar (T13), as shown in attached photo. Works are required for to reduce leverage on branch unions to allow the safe retention of the tree. Crownlift trees T23, G24, and T25 to achieve 5m ground clearance to allow the installation of a retaining wall.

    25 Mar 2026 247m away Trees
  • 25/01996/CLDE Granted

    Secmaton Farm Secmaton Lane Dawlish Devon EX7 0LW

    Certificate of lawfulness to establish implementation of Planning Permission 21/02674/MAJ (Erection of 201 dwellings, open space, landscaping, allotments and associated infrastructure) in compliance with condition 1

    2 Dec 2025 282m away Lawful development
  • 22/00819/COND1 Awaiting decision

    Commerce House Dawlish Business Park Dawlish EX7 0NH

    Discharge of condition 7 (Construction Management Plan (CMP)) on planning permission 22/00819/FUL - Creation of 11 additional business units through the demolition of one building, construction of four new units and subdivision, extension and reconfiguration of existing buildings. Block one existing vehicle access, makes changes to second access, and alterations to parking

    3 Nov 2025 414m away Conditions
  • 26/00644/CLDP Granted

    35 Kestrel Way Dawlish Devon EX7 0FY

    Certificate of Lawfulness for proposed single storey extension and loft conversion

    13 Apr 2026 418m away Lawful development
  • 26/00435/CLDP Refused

    35 Kestrel Way Dawlish Devon EX7 0FY

    Certificate of Lawfulness for proposed single storey extension and loft conversion

    16 Mar 2026 418m away Lawful development

In Teignbridge

  • 26/01210/FUL Awaiting decision

    Cross Park Farm Heath Cross Whitestone Devon EX4 2HN

    Part retention for the erection of 3 light industrial buildings and associated infrastructure

    27 Jul 2026 Full applications
  • 26/00715/FUL Refused

    Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX

    Proposed solar boundary fence (approx. 13 kW renewable energy installation)

    24 Apr 2026 Full applications
  • 26/01176/FUL Awaiting decision

    Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ

    Retention of air source heat pump and two condensing units to flat roof

    21 Jul 2026 Full applications
  • 26/01168/FUL Awaiting decision

    Red Lion Inn Tedburn St Mary Devon EX6 6EQ

    Extension and alterations to existing public house and associated works

    20 Jul 2026 Full applications
  • 26/01133/FUL Awaiting decision

    Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN

    Removal of the existing weir including site grading where the weir was and bank protection

    16 Jul 2026 Full applications