Skip to content
PlanIndex Get alerts
Menu

Planning application

Cornwood House Littlehempston Devon TQ9 6NG

Awaiting decision Teignbridge 25/01660/HOU Householder applications

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed extension to existing dwelling and construction of an annexe

As published by the council, reference 25/01660/HOU

Application record

Reference
25/01660/HOU
Type
Householder applications
Status
Pending Consideration
Received
7 Oct 2025
Validated
9 Oct 2025
Ward
Ipplepen
Parish
IPPLEPEN
Postcode
TQ9 6NG

Site history

Applications at this address on the Teignbridge register

This site has had 2 applications since 2025.

  • 26/00824/HOU Awaiting decision

    Cornwood House Littlehempston Devon TQ9 6NG

    Demolition of existing conservatory and extension to dwelling to create orangery and annexe (revised scheme)

    Submitted 14 May 2026 Householder

Timeline

Dates from the published record

  1. 7 Oct 2025

    Received by Teignbridge

  2. 9 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 4 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Teignbridge took a median of 52 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Teignbridge for determination, against a statutory target of eight weeks. Over the last year Teignbridge decided householder applications in a median of 57 days. More in our guide to how long planning decisions take.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Teignbridge

  • 26/01545/HOU Awaiting decision

    Cider Barn Whitestone Devon EX4 2JJ

    Single storey rear extension creating additonal living space

    Received 1 Oct, published by the council 5 Oct 2026 Householder
  • 26/01549/HOU Awaiting decision

    1 Elm Grove Teignmouth Devon TQ14 8SA

    Demolition of existing conservatory and construction of single storey rear/side extension with pitched gabled roofs, formation of a rear terrace with 1800mm high obscure glazed privacy screens to both side elevations, improved stepped garden access, fenestration and material upgrades and associated surface water drainage and biodiversity enhancements

    Received 1 Oct, published by the council 5 Oct 2026 Householder
  • 26/01543/HOU Awaiting decision

    29 Weavers Way Kingskerswell Devon TQ12 5HY

    Single storey side and rear extension and loft conversion including raising of roof and rear dormer

    Received 30 Sep, published by the council 5 Oct 2026 Householder
  • 26/01523/HOU Awaiting decision

    1 Southey Lane Kingskerswell Devon TQ12 5JF

    Engineering works to stone retaining wall and replacement of asbestos cement roof tiles with natural slate tiles

    Received 28 Sep, published by the council 5 Oct 2026 Householder
  • 26/01521/HOU Awaiting decision

    1 Winterbourne Road Teignmouth Devon TQ14 8JT

    Replacement of an existing single storey conservatory and flat roofed structure with a single storey living room extension, alongside external alterations including altered fenestration, updated render and timber cladding finishes, insertion of two second-floor sun tunnels and associated internal reorganisation across ground, first, and second floor levels

    Received 28 Sep, published by the council 30 Sep 2026 Householder