Skip to content
PlanIndex Get alerts
Menu

Planning application

25/01594/FUL

Unit 21 Dawlish Business Park Dawlish Devon EX7 0NH

Granted Teignbridge Full Planning Application

Proposal

Insertion of first floor and additional windows

As published by the council, reference 25/01594/FUL

Timeline

Dates from the published record

  1. 24 Sep 2025

    Received by Teignbridge

  2. 19 Nov 2025

    Decision issued: PERMISSION GRANTED

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 22/00819/COND1 Awaiting decision

    Commerce House Dawlish Business Park Dawlish EX7 0NH

    Discharge of condition 7 (Construction Management Plan (CMP)) on planning permission 22/00819/FUL - Creation of 11 additional business units through the demolition of one building, construction of four new units and subdivision, extension and reconfiguration of existing buildings. Block one existing vehicle access, makes changes to second access, and alterations to parking

    3 Nov 2025 231m away Conditions
  • 26/00644/CLDP Granted

    35 Kestrel Way Dawlish Devon EX7 0FY

    Certificate of Lawfulness for proposed single storey extension and loft conversion

    13 Apr 2026 334m away Lawful development
  • 26/00435/CLDP Refused

    35 Kestrel Way Dawlish Devon EX7 0FY

    Certificate of Lawfulness for proposed single storey extension and loft conversion

    16 Mar 2026 334m away Lawful development
  • 25/00843/COND2 Decided

    Larkshome Sherwells Close Dawlish Warren EX7 0PL

    Discharge of Condition 6 (Surface Water Drainage) in relation to the application 25/00843/FUL - Proposed replacement dwelling

    2 May 2026 474m away Conditions
  • 25/00843/COND1 Awaiting decision

    Larkshome Sherwells Close Dawlish Warren EX7 0PL

    Discharge of condition 6 (surface water drainage) on planning permission 25/00843/FUL - Proposed replacement dwelling

    20 Oct 2025 474m away Conditions

In Teignbridge

  • 26/01210/FUL Awaiting decision

    Cross Park Farm Heath Cross Whitestone Devon EX4 2HN

    Part retention for the erection of 3 light industrial buildings and associated infrastructure

    27 Jul 2026 Full applications
  • 26/00715/FUL Refused

    Oakcliff Park Mount Pleasant Road Dawlish Warren Devon EX7 0LX

    Proposed solar boundary fence (approx. 13 kW renewable energy installation)

    24 Apr 2026 Full applications
  • 26/01176/FUL Awaiting decision

    Marine Hotel And Tavern 2 Marine Parade Dawlish Devon EX7 9DJ

    Retention of air source heat pump and two condensing units to flat roof

    21 Jul 2026 Full applications
  • 26/01168/FUL Awaiting decision

    Red Lion Inn Tedburn St Mary Devon EX6 6EQ

    Extension and alterations to existing public house and associated works

    20 Jul 2026 Full applications
  • 26/01133/FUL Awaiting decision

    Bradley Manor Weir Totnes Road Newton Abbot Devon TQ12 6BN

    Removal of the existing weir including site grading where the weir was and bank protection

    16 Jul 2026 Full applications