Skip to content
PlanIndex Get alerts
Menu

Planning application

24/00311/CONSLT

Yarner Cottage Bovey Tracey TQ13 9LN

Awaiting decision Teignbridge Other General Consultation

Proposal

Re-siting of oil tank

As published by the council, reference 24/00311/CONSLT

Timeline

Dates from the published record

  1. 22 Feb 2024

    Received by Teignbridge

  2. 1 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Teignbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 0186/21 Decided

    Dwellinghouse known as Long Brake, Bovey Tracey, TQ13 9LN

    The installation of two clear glazed, unrestricted, first floor, side elevation windows

    9 Apr 2021 0m away Lawful development
  • 0259/24 Granted

    Yarner House, Bovey Tracey, Newton Abbot, Devon, TQ13 9LN

    Selected replacement of windows and door

    4 Jun 2024 0m away Heritage and listed buildings
  • 0243/24 Granted

    Yarner House, Bovey Tracey, Newton Abbot, Devon, TQ13 9LN

    Alterations and addition of draught stripping to selected windows within Yarner House (GVII)

    22 May 2024 0m away Heritage and listed buildings
  • 0244/24 Granted

    Yarner House, Bovey Tracey, Newton Abbot, Devon, TQ13 9LN

    Alterations and addition of draught stripping to selected windows within Yarner Cottage (curtilage listed)

    22 May 2024 0m away Heritage and listed buildings
  • 0228/24 Granted

    Yarner Cottage, Bovey Tracey, Newton Abbot, Devon, TQ13 9LN

    Remove dormers and replace with roof lights

    17 May 2024 0m away Heritage and listed buildings
  • 0227/24 Granted

    Yarner Cottage, Bovey Tracey, Newton Abbot, Devon, TQ13 9LN

    Remove dormers and replace with roof lights

    17 May 2024 0m away Householder

In Teignbridge

  • 26/01073/OUT Awaiting decision

    Crazy Acres Woodland Ashburton Devon TQ13 7LL

    Outline planning application for an agricultural managers dwelling (all matters reserved)

    1 Jul 2026 Outline
  • 26/00556/SO Decided

    Land At Langford Bridge Kingskerswell Road Newton Abbot Devon

    Request for a screening opinion for a new link road

    27 Mar 2026 Outline
  • 26/00711/PIP Refused

    Connybear Farm Shop St Marychurch Road Newton Abbot TQ12 4SE

    Permission in Principle for up to 9 dwellings

    23 Apr 2026 Outline
  • 26/00747/CONSLT Granted

    West Wheatley Farm Westwood Lane Longdown EX6 7RX

    Full planning application for the construction of a new waste processing building, together with the formation of skip storage and stockpiling areas, the installation of sustainable drainage (SuDS) features, landscaping, hardstanding and associated infrastructure works

    30 Apr 2026 Outline
  • 26/00747/DCC Granted

    West Wheatley Farm Westwood Lane Longdown EX6 7RX

    Full planning application for the construction of a new waste processing building, together with the formation of skip storage and stockpiling areas, the installation of sustainable drainage (SuDS) features, landscaping, hardstanding and associated infrastructure works

    30 Apr 2026 Outline