Planning application

48 High Street Dawlish Devon EX7 9HH

Granted Teignbridge 23/01948/FUL Full Planning Application

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing outbuilding/barn and construction of new single dwelling

As published by the council, reference 23/01948/FUL

Application record

Reference
23/01948/FUL
Type
Full Planning Application
Status
Approved
Decision
PERMISSION GRANTED
Received
30 Oct 2023
Validated
14 Feb 2024
Decided
23 May 2024
Ward
Dawlish South West
Parish
DAWLISH
Decision by
Delegated Decision
Postcode
EX7 9HH

Timeline

Dates from the published record

  1. 30 Oct 2023

    Received by Teignbridge

  2. 14 Feb 2024

    Validated

    Checked as complete and ready for consideration.

  3. 23 May 2024

    Decision issued: PERMISSION GRANTED

  4. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

20 applications on PlanIndex · across 7 councils · 60% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Oak Haven Priory Road Dawlish Devon EX7 9JG

    26/00054/TPO Submitted 15 Jan 2026 52m away

    T2- Holm Oak - Crown reduction to the existing crown by reducing the overall height and radial spread back to previous, suitable reduction points, where visible and appropriate.

    Granted Trees 7 docs
  • Oak Haven Priory Road Dawlish Devon EX7 9JG

    20/02234/FUL Submitted 29 Nov 2020 56m away

    Change of use from store to holiday let (use class C3)

    Granted Full applications 15 docs
  • Strand Community Trust Ltd 32 The Strand Dawlish Devon EX7 9PT

    26/01345/CLDP Submitted 23 Aug 2026 80m away

    72% historically approved · decision due ~23 Oct

    Certificate of Lawfulness for proposed installation of an 8.64 kWp roof-mounted solar photovoltaic system on the south-facing roof slope

    Awaiting decision Lawful development 11 docs
  • 15 The Strand Dawlish Devon EX7 9PS

    26/00517/LBC Submitted 23 Mar 2026 90m away

    Creation of rear roof dormer, railings to rear flat roof to form means of escape and internal alterations to first floor

    Refused Heritage and listed buildings Loft or dormer 19 docs
  • 15 The Strand Dawlish Devon EX7 9PS

    26/01288/LBC Submitted 11 Aug 2026 90m away

    97% historically approved · decision due ~6 Oct

    Creation of rear escape rooflight and smoke vent, railings to rear flat roof to form means of escape and internal alterations to first floor

    Awaiting decision Heritage and listed buildings Loft or dormer 14 docs
  • 15 The Strand Dawlish Devon EX7 9PS

    26/00516/FUL Submitted 23 Mar 2026 90m away

    Creation of rear roof dormer, railings to rear flat roof to form means of escape and internal alterations to first floor

    Refused Full applications Loft or dormer 19 docs

In Teignbridge

  • 26/01079/FUL Refused

    15 The Strand Dawlish Devon EX7 9PS

    Creation of rear escape rooflight and smoke vent, railings to rear flat roof to form means of escape and internal alterations to first floor

    2 Jul 2026 Full applications
  • 26/01041/FUL Refused

    Meadow Farm Stokeinteignhead Devon TQ12 4QL

    Retrospective application for the erection of an outbuilding for storage purposes and the laying of associated concrete hardstanding for access

    26 Jun 2026 Full applications
  • 26/01058/FUL Refused

    Greydawn Ideford Combe Sandygate Devon TQ12 3GS

    Conversion of garage to form self contained annexe ancillary to the main dwelling

    30 Jun 2026 Full applications
  • 26/00732/FUL Granted

    9 Devon Square Newton Abbot Devon TQ12 2HN

    Replacement extension to create an internal connection between Great Western House and Brunel House, new door on south elevation of Brunel House, new roof on Brunel House with external and internal alterations to both properties

    28 Apr 2026 Full applications
  • 26/01010/FUL Granted

    1 Richmond Court Richmond Place Dawlish Devon EX7 9PL

    Replace 2 windows to first floor flat

    22 Jun 2026 Full applications