Planning application
Oak Haven Priory Road Dawlish Devon EX7 9JG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from store to holiday let (use class C3)
As published by the council, reference 20/02234/FUL
Application record
- Reference
- 20/02234/FUL
- Type
- Full Planning Application
- Status
- Approved
- Decision
- PERMISSION GRANTED
- Received
- 29 Nov 2020
- Validated
- 9 Dec 2020
- Decided
- 2 Feb 2021
- Ward
- Dawlish South West
- Parish
- DAWLISH
- Decision by
- Delegated Decision
- Postcode
- EX7 9JG
Timeline
Dates from the published record
-
29 Nov 2020
Received by Teignbridge
-
9 Dec 2020
Validated
Checked as complete and ready for consideration.
-
2 Feb 2021
Decision issued: PERMISSION GRANTED
-
28 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Devon
57 applications on PlanIndex · across 4 councils · 79% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Oak Haven Priory Road Dawlish Devon EX7 9JG
T2- Holm Oak - Crown reduction to the existing crown by reducing the overall height and radial spread back to previous, suitable reduction points, where visible and appropriate.
Granted Trees 7 docs -
Oak Haven Priory Road Dawlish Devon EX7 9JG
97% historically approved · decision due ~2 Jan
T2- Holm Oak- Make new Pollard to line approximately 30 feet back to appropriate pruning points around 30 feet From ground level.
Awaiting decision Heritage and listed buildings Trees 4 docs -
12 Meldrum Close Dawlish Devon EX7 9JL
Single storey building to link existing garage with existing first floor of main dwelling, conversion of garage to a bedroom and some storage retained with garage roof changing to pitched roof, single storey extension to rear of garage conversion to accommodate a shower room and erection of carport on drive
Granted Householder Extension 19 docsSmall domestic -
48 High Street Dawlish Devon EX7 9HH
Demolition of existing outbuilding/barn and construction of new single dwelling
Granted Full applications Demolition 30 docsSmall domestic -
Lammas Park House 3 Priory Road Dawlish EX7 9JF
Certificate of Lawfulness for existing use of land as garden in association with hotel
Granted Lawful development 22 docs -
15 The Strand Dawlish Devon EX7 9PS
Creation of rear roof dormer, railings to rear flat roof to form means of escape and internal alterations to first floor
Refused Heritage and listed buildings Loft or dormer 19 docs
Other full applications applications
In Teignbridge
-
26/01079/FUL Refused
15 The Strand Dawlish Devon EX7 9PS
Creation of rear escape rooflight and smoke vent, railings to rear flat roof to form means of escape and internal alterations to first floor
-
26/01041/FUL Refused
Meadow Farm Stokeinteignhead Devon TQ12 4QL
Retrospective application for the erection of an outbuilding for storage purposes and the laying of associated concrete hardstanding for access
-
26/01058/FUL Refused
Greydawn Ideford Combe Sandygate Devon TQ12 3GS
Conversion of garage to form self contained annexe ancillary to the main dwelling
-
26/00732/FUL Granted
9 Devon Square Newton Abbot Devon TQ12 2HN
Replacement extension to create an internal connection between Great Western House and Brunel House, new door on south elevation of Brunel House, new roof on Brunel House with external and internal alterations to both properties
-
26/01010/FUL Granted
1 Richmond Court Richmond Place Dawlish Devon EX7 9PL
Replace 2 windows to first floor flat