Skip to content
PlanIndex Get alerts
Menu

Planning application

0175/2025

Land North of Coton Lane Tamworth

Awaiting decision Tamworth Full

Proposal

Demolition of all existing buildings, construction of 334 new dwellings with means of access via A513, Coton Lane, Hewett Close, and Bellingham Grove with associated highway works, landscaping, open space, drainage features and associated infrastructure and enabling earthworks (cross boundary)

As published by the council, reference 0175/2025

Timeline

Dates from the published record

  1. 14 Aug 2025

    Received by Tamworth

  2. 24 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Tamworth for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 0122/2026 Granted

    174 Comberford Road Tamworth Staffordshire B79 9AA

    Single storey side and rear extension and a garage conversion

    19 May 2026 30m away Householder
  • 0105/2026 Granted

    135 Comberford Road Tamworth Staffordshire B79 8PQ

    Two first floor side extensions and single storey rear extensions

    27 Apr 2026 132m away Householder
  • 0141/2026 Awaiting decision

    24 Gillway Lane Tamworth Staffordshire B79 8PL

    Prior Notification for larger single storey rear extension: Depth: 5m eaves height: 3.30m and a maximum height of 3.30m

    16 Jun 2026 173m away Prior approval
  • 0034/2025 Granted

    108 Claremont Road Tamworth Staffordshire B79 8ES

    Erection of a two storey side extension, single storey rear extension and single storey front extension with re-cladding of front elevation

    19 Feb 2025 326m away Householder
  • 0088/2026 Withdrawn

    106 Claremont Road Tamworth Staffordshire B79 8ES

    Change of use of dwelling (Use Class C3) to a children's home (Use Class C2) for 2 Children

    10 Apr 2026 326m away Full applications
  • 0262/2021 Granted

    117 Comberford Road Tamworth B79 8PQ

    Demolition of existing side garage and rear conservatory and the erection of a single storey side return extension.

    24 May 2021 348m away Householder

In Tamworth

  • 0095/2025 Granted

    Land North of Tamworth Shooting Ground Wigford Road Dosthill Tamworth Staffordshire B77 1LZ

    Change of use from an agricultural building (Sui Generis Class) to residential (C3 Class)

    28 Apr 2025 Full applications
  • 0186/2026 Awaiting decision

    6 Hodge Lane Amington Tamworth Staffordshire B77 4AN

    Demolition of existing two storey dwelling and erection of single-storey dwelling and detached garage with associated access and landscaping works

    24 Jul 2026 Full applications
  • 0177/2026 Awaiting decision

    12 - 13 Market Street Tamworth B79 7LU

    Installation of a combined defibrillator and bleed kit cabinet to external front elevation wall

    21 Jul 2026 Full applications
  • 0173/2026 Awaiting decision

    Unit 2 Irwin Lichfield Road Industrial Estate Tamworth Tamworth B79 7FU

    Change of use of an existing commercial building (Classes B2, B8 and E(g)(ii), and E(g)(iii) to a class E(d) use, to be used as a Pilates studio.

    20 Jul 2026 Full applications
  • 0161/2026 Awaiting decision

    Amington Hall Ashby Road Tamworth B79 0BX

    Erection of 2 no. detached dwellings including the repair and reinstatement of the surrounding listed garden walls (in association with LBC 0165/2026 )

    9 Jul 2026 Full applications