Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Thomas Close Denton Tameside M34 3DF

Granted Tameside 26/00336/FUL Full Planning Permission

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

loft conversion with front and rear dormers

As published by the council, reference 26/00336/FUL

Application record

Reference
26/00336/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
17 Apr 2026
Validated
20 Apr 2026
Decided
11 Jun 2026
Ward
Denton North East
Parish
Denton/Audenshaw
Decision by
Delegated Decision
Postcode
M34 3DF

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Tameside

  2. 20 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Jun 2026

    Decision issued: Approve

  4. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

11 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Moorside Lane Denton Tameside M34 3DE

    21/00680/FUL Submitted 24 May 2021 50m away

    Erection of single storey side extension, erection of single storey rear extension and external canopy, alterations to boundary treatments to east boundary, alterations to front dormer.

    Granted Full applications Extension Loft or dormer 11 docs
    Small domestic
  • 39 Osborne Road Denton Tameside M34 3BE

    21/00448/FUL Submitted 1 Apr 2021 69m away

    Dormer extension

    Withdrawn Full applications Extension Loft or dormer 7 docs
  • 31 Wood Street Denton Tameside M34 3DT

    25/01005/FUL Submitted 9 Dec 2025 122m away

    Erection of timber fencing, electric gates, and brick pillars (retrospective)

    Granted Full applications 6 docs
  • 5 Nield Road Denton Tameside M34 3BF

    21/00467/FUL Submitted 6 Apr 2021 150m away

    DEMOLISH EXISTING CONSERVATORY & BUILD NEW EXTENSION TO REAR OF THE PROPERTY

    Granted Full applications Extension Demolition 6 docs
  • 87 Hyde Road Denton Tameside M34 3BB

    26/00032/PLCOND Submitted 13 Apr 2026 160m away

    Full discharge of Condition 4 (Traffic Noise), Condition 5 (Waste) of planning reference 25/00832/FUL

    Granted Conditions 9 docs
  • 14 Wareing Close Denton Tameside M34 3FW

    23/00227/FUL Submitted 13 Mar 2023 171m away

    SINGLE STOREY SIDE EXTENSION

    Granted Full applications Extension 5 docs
    Small domestic

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications