Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Moorside Lane Denton Tameside M34 3DE

Granted Tameside 21/00680/FUL Full Planning Permission

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey side extension, erection of single storey rear extension and external canopy, alterations to boundary treatments to east boundary, alterations to front dormer.

As published by the council, reference 21/00680/FUL

Application record

Reference
21/00680/FUL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approve
Received
24 May 2021
Validated
24 May 2021
Decided
17 Aug 2021
Ward
Denton North East
Parish
Denton/Audenshaw
Decision by
Delegated Decision
Postcode
M34 3DE

Timeline

Dates from the published record

  1. 24 May 2021

    Received by Tameside

  2. 17 Aug 2021

    Decision issued: Approve

  3. 15 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Buildingcontrol: 23/00911/INIT (Initial Notice Cancellation Received)
  • Buildingcontrol: 24/00707/INIT (Initial notice accepted)

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

  • DECISION NOTICE Decision · 17 Aug 2021
  • THE LOCATION PLAN Drawings · 24 May 2021
  • EXISTING SITE PLAN Drawings · 24 May 2021
  • EXISTING FLOOR PLAN Drawings · 24 May 2021
  • PROPOSED SITE PLAN Drawings · 24 May 2021
  • EXISTING ELEVATIONS Drawings · 24 May 2021
  • BOUNDARY TREATMENT DETAILS Drawings · 24 May 2021
  • PROPOSED FLOOR AND ROOF PLANS Drawings · 24 May 2021
  • PROPOSED ELEVATIONS Drawings · 24 May 2021
  • PROPOSED FRONT ELEVATION 3D VISUAL Drawings · 24 May 2021
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 24 May 2021

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Tameside granted permission on 17 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 3 Thomas Close Denton Tameside M34 3DF

    26/00336/FUL Submitted 17 Apr 2026 50 yards away

    loft conversion with front and rear dormers

    Granted Full applications Loft or dormer 7 docs
  • 31 Wood Street Denton Tameside M34 3DT

    21/00461/FUL Submitted 4 Apr 2021 100 yards away

    Single Storey Side extension with Rear dormer and attached garage.

    Granted Full applications Extension Loft or dormer 12 docs
    Small domestic
  • 39 Osborne Road Denton Tameside M34 3BE

    21/00448/FUL Submitted 1 Apr 2021 150 yards away

    Dormer extension

    Withdrawn Full applications Extension Loft or dormer 7 docs
  • 31 Wood Street Denton Tameside M34 3DT

    25/01005/FUL Submitted 9 Dec 2025 150 yards away

    Erection of timber fencing, electric gates, and brick pillars (retrospective)

    Granted Full applications 6 docs
  • 14 Wareing Close Denton Tameside M34 3FW

    23/00227/FUL Submitted 13 Mar 2023 150 yards away

    SINGLE STOREY SIDE EXTENSION

    Granted Full applications Extension 5 docs
    Small domestic
  • Nisa Local 186 Hyde Road Denton Tameside M34 3DN

    26/00107/PLCOND Submitted 12 Oct 2026 200 yards away

    90% historically approved · decision due ~7 Dec

    Full discharge of Condition 5 (Secured Cycle Storage) of planning reference 22/00680/FUL

    Awaiting decision

In Tameside

  • 26/00804/FUL Awaiting decision

    14 Chestnut Avenue Droylsden Tameside M43 7SA

    REAR FIRST FLOOR EXTENSION AND INTERNAL REMODELLING

    Received 19 Oct, published by the council 20 Oct 2026 Full applications
  • 26/00799/FUL Awaiting decision

    Droylsden Cricket Club Gardenfold Way Droylsden M43 7XU

    Proposed siting of ten modular cabin units and two replacement 40-foot storage containers and associated works

    Received 16 Oct, published by the council 20 Oct 2026 Full applications
  • 26/00800/FUL Awaiting decision

    Premier Inn Alphagate Drive Denton Tameside M34 3SH

    Change of use from restaurant (Use Class E) to Hotel (Use Class C1) and associated works.

    Received 16 Oct, published by the council 19 Oct 2026 Full applications
  • 26/00795/FUL Awaiting decision

    Telecommunications Sub Station Alt Hill Lane Ashton-under-lyne Tameside OL6 8AG

    Creation of a new vehicular access from Alt Hill Lane and erection of a telecommunications cable landing station comprising a cabin (approximately 10.5m x 3.3m and 3.35m in height), generator, meter cabinet, fibre chamber and a 20m x 12m compound enclosed by 1.8m high mesh fencing, together with associated engineering works, concrete bases, earthworks and ancillary infrastructure.

    Received 14 Oct, published by the council 19 Oct 2026 Full applications
  • 26/00790/FUL Awaiting decision

    9 Hazelwood Close Hyde Tameside SK14 3SP

    Demolition of existing conservatory and construction of new single storey rear extension

    Received 14 Oct, published by the council 16 Oct 2026 Full applications