Planning application
Land At The End Of Fern Lodge Drive Ashton-under-Lyne Tameside
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Full Discharge of Condition 4 (Remediation of Contamination), Condition 7 (Highway Condition Survey) and Condition 8 (Scheme of Highway Construction) of planning reference 22/00818/FUL
As published by the council, reference 26/00097/PLCOND
Application record
- Reference
- 26/00097/PLCOND
- Status
- Awaiting decision
- Received
- 23 Sep 2026
- Validated
- 23 Sep 2026
- Ward
- Ashton-under-Lyne St Michaels
- Parish
- Ashton-under-lyne
Site history
Applications at this address on the Tameside register
This site has had 2 applications since 2025.
-
25/00044/PLCOND Awaiting decision
Land At The End Of Fern Lodge Drive Ashton-under-lyne Tameside
Discharge of condition 4 (verification / completion report) of planning permission 22/00818/FUL.
Timeline
Dates from the published record
-
23 Sep 2026
Received by Tameside
-
24 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Tameside took a median of 55 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 22/00818/FUL (Decided)
Who's behind it
Company information only, from the register and Companies House
Walker Architectural Design Ltd Agent, an architecture practice registered in Manchester
Active · incorporated 2012 · Manchester
9 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- VERIFICATION COMPLETION REPORT FOR GROUND GAS PROTECTION
- SOIL VERIFICATION REPORT
- SOIL VERIFICATION REPORT TOPSOIL SUITABILITY
- SOIL VERIFICATION REPORT TOPSOIL SUITABILITY
- SOIL VERIFICATION REPORT TOPSOIL SUITABILITY
- APPLICATION FORM - WITHOUT PERSONAL DATA
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
- VERIFICATION REPORT - ENVIRONMENTAL COVER SYSTEM VALIDATION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Tameside for determination, against a statutory target of eight weeks. Over the last year Tameside's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Tameside's portal will say. Our guide explains the common types.