Planning application

Ashton Bus Interchange Albion Way Ashton-Under-Lyne Tameside

Decided Tameside 19/00164/PLCOND Formal Discharge Of Planning Conditions

Works: Demolition

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Approval of details reserved by condition 9 (surface water drainage) of planning permission ref. 19/00133/FUL - Demolition of existing bus station and probation building and construction of a new Tameside Interchange

As published by the council, reference 19/00164/PLCOND

Application record

Reference
19/00164/PLCOND
Type
Formal Discharge Of Planning Conditions
Status
Awaiting decision
Decision
Pending
Received
17 Dec 2019
Validated
20 Dec 2019
Ward
Ashton-under-Lyne St Peters
Parish
Ashton-under-Lyne

Timeline

Dates from the published record

  1. 17 Dec 2019

    Received by Tameside

  2. 20 Dec 2019

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Rochester

27 applications on PlanIndex · across 14 councils · 82% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

In Tameside

  • 25/00031/PLCOND Granted

    Highbank Amphorea Packaging Ltd Halton Street Hyde Tameside SK14 2NY

    Full discharge of Condition 5 (Remediation Strategy), Condition 6 (Verification/Completion Report), Condition 9 (Surface Water Drainage Scheme) and Condition 10 (Biodiversity Enhancement Measures) of planning reference 24/00226/FUL

    3 Apr 2025 Conditions
  • 26/00040/PLCOND Granted

    Former Abc Waxworks Clarendon Road Hyde Tameside SK14 2JX

    Full discharge of Condition 3 (Materials), Condition 16 (Full Phasing Plan), Condition 19 (Lighting Strategy), Condition 23 (EV Charging Strategy), Condition 25 (Landscape and Ecological Management Plan), Condition 33 (Solar Panels) and Condition 37 (Single Date Stone Details) of planning reference 22/01112/FUL

    6 May 2026 Conditions
  • 26/00063/PLCOND Granted

    Land At Ashworth Lane And Stockport Road Mottram Tameside SK14 6QH

    Full discharge of Condition 16 (Soft Landscaping Scheme) of planning reference 23/01063/FUL

    6 Jul 2026 Conditions
  • 26/00045/PLCOND Granted

    Russell Scott Primary School Clare Street Denton Tameside M34 3LQ

    Full Discharge of Condition 10 (Dilapidation Survey), Condition 16 (CEMP), Condition 17 (Protected Species Survey), Condition 19 (HMMP), Condition 23 (Site Investigation and Remediation Strategy) of planning reference 25/01008/FUL

    15 May 2026 Conditions
  • 26/00055/PLCOND Granted

    Spring Bank Lane Overbridge MVL3/9 Spring Bank Lane Stalybridge Tameside SK15 3BD

    Part discharge of Condition 3 (Materials) and Condition 6 (Method Statement) and full discharge of Condition 4 (Scoping Plan), Condition 5 (Lime Mortar), and Condition 7 (Toolbox Talks) of planning reference 26/00021/LBC.

    17 Jun 2026 Conditions