Planning application
Former Honda UK Manufacturing Highworth Road Swindon
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Conditions 76, Verification report 110 Invasive species &121 drainage from previous application S/OUT/22/0284 - Hybrid application for the development of car manufacturing plant including Outline details (all matters reserved) for employment development including flexible Class E (g)/B2 general industrial/B8 storage and distribution uses and a multipurpose hub building, including associated development, accesses, earthworks and infrastructure and, Full details for the demolition of all buildings, alterations to existing northern and southern accesses, construction of internal estate roads, strategic structural landscaping, drainage infrastructure, earthworks and erection of a Class B8 warehouse and associated development, accesses and infrastructure.
As published by the council, reference S/COND/26/0942
Application record
- Reference
- S/COND/26/0942
- Type
- Discharge of Condition Application
- Status
- Application Pending Decision
- Received
- 28 Jul 2026
- Validated
- 28 Jul 2026
- Ward
- Lower Stratton
- Parish
- Stratton St Margaret
Site history
Applications at this address on the Swindon register
This site has had 22 applications since 2023: 21 approved, 0 refused.
-
S/AMEND/26/0950 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Non Material Amendment from previous application S/OUT/22/0284 relating to amendment of the Development Parameters Plan to reference the minimum Finished Floor Levels.
-
S/COND/26/0826 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Discharge of Conditions 9 & 65 footway/cycleway from previous application S/AMEND/26/0326 - Non-material amendment following grant of planning permission ref. S/OUT/22/0284 to amend the Phasing Plan and revised alignment of the permanent footway/cycleway along the A361.
-
S/COND/26/0558 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Partial Discharge of Condition (46) (Unit 1) BREEAM design stage certificate from previous application S/OUT/22/0284.
-
S/COND/26/0346 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Partial Discharge of Condition (Unit 4) (38) Contamination Remediation Verification Scheme from previous application S/OUT/22/0284.
-
S/AMEND/26/0326 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Non-material amendment following grant of planning permission ref. S/OUT/22/0284 to amend the Phasing Plan and revised alignment of the permanent footway/cycleway along the A361.
-
S/COND/26/0257 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Partial Discharge of Condition of (48) Solar PV Layout from previous application S/OUT/22/0284.
-
S/AMEND/26/0232 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Non-Material Amendment to previous consent S/RES/24/0802 relating to an amendment to the description of development.
-
S/COND/26/0152 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Partial Discharge of Condition (13) Construction Environmental Management Plan from previous application S/OUT/22/0284.
-
S/COND/26/0120 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Partial Discharge (Primary Infrastructure Areas) of Condition (43) Surface Water Drainage Maintenance from previous application S/OUT/22/0284.
-
S/OC106/26/0074 Granted
Former Honda UK Manufacturing Highworth Road Swindon
Discharge of the non-financial s106 obligation (Clause 5.1) (Public Art Scheme) relating to Panattoni Park from outline permission S/OUT/22/0284.
Timeline
Dates from the published record
-
28 Jul 2026
Received by Swindon
-
1 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 22 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Swindon took a median of 49 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: S/OUT/22/0284 (Application Granted)
Who's behind it
Company information only, from the register and Companies House
Stantec PLC Agent, registered in Warrington
Active · incorporated 2024 · Warrington
340 applications on PlanIndex · across 107 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
50 documents on file for this application
- INFRASTRUCTURE TOPSOIL REMEDIATION VERIFICATION REPORT
- TOPSOIL VALIDATION
- COVERING LETTER
- TOPSOIL VALIDATION
- TOPSOIL VALIDATION
- TOPSOIL VALIDATION
- TOPSOIL VALIDATION
- TOPSOIL VALIDATION
- TOPSOIL VALIDATION
- TOPSOIL VALIDATION
- BRISTOL & AVON TRANSPORT & RECYCLING
- MECHANICAL SVF
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT INDEX PLAN
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 1
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 2
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 3
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 4
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 5
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 6
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 7
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 8
- DRAINAGE PHASE 1 GENERAL ARRANGEMENT SHEET 9
- DRAINAGE - RISING MAIN CONSTRUCTION DETAILS SHEET 1
- DRAINAGE - RISING MAIN CONSTRUCTION DETAILS SHEET 2
- FOUL DIVERSION DOWNSTREAM CONNECTION PHASING
- FOUL DIVERSION UPSTREAM CONNECTION PHASING
- PUMP STATION COMPOUND
- PUMP STATION INDICATIVE SECTIONS SHEET 1
- PUMP STATION INDICATIVE SECTIONS SHEET 2
- PUMP STATION INDICATIVE SECTIONS SHEET 3
- VALVE CHAMBER GENERAL ARRANGEMENT AND REINFORCEMENT DETAILS
- FLOW CONTROL CHAMBER GENERAL ARRANGEMENT AND REINFORCEMENT DETAIL
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 1
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 2
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 3
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 4
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 5
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 6
- HIGHWAYS PHASE 1 DRAINAGE STANDARD DETAILS SHEET 7
- DRAINAGE PHASE 1 SW NORTH MANHOLE SCHEDULE
- DRAINAGE PHASE 1 SW HUB & SOUTH MANHOLE SCHEDULES
- DRAINAGE PHASE 1 FW SITE WIDE MANHOLE SCHEDULE
- FOUL WATER - RISING MAIN DIVERSION
- FOUL WATER - RISING MAIN NEW LONG SECTION
- FOUL WATER - RISING MAIN DIVERSIONLEGAL EASEMENT
- RISING MAIN DIVERSION MANHOLE SCHEDULE
- FW RISING MAIN PRIVATE MANHOLE SCHEDULE
- RAIN GARDEN MANHOLE SCHEDULE
- LOCATION PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Swindon for determination, against a statutory target of eight weeks. Over the last year Swindon decided condition discharge and variation applications in a median of 50 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Swindon
-
S/COND/26/0977 Granted
Units 8A, 11 & 12 Panattoni Park Highworth Road Swindon SN3 4AL
Discharge of Conditions (14) Piling Method Statement (15) Piling Construction from previous application S/OUT/22/0284 - Hybrid application for the development of car manufacturing plant including Outline details (all matters reserved) for employment development including flexible Class E (g)/B2 general industrial/B8 storage and distribution uses and a multipurpose hub building, including associated development, accesses, earthworks and infrastructure and, Full details for the demolition of all buildings, alterations to existing northern and southern accesses, construction of internal estate roads, strategic structural landscaping, drainage infrastructure, earthworks and erection of a Class B8 warehouse and associated development, accesses and infrastructure.
-
S/COND/26/1121 Withdrawn
Spectrum Building Mead Way Swindon SN15 7UT
Discharge of Condition 12 - Relocation of black framed partitions, from previous application S/26/0036.
-
S/COND/26/0891 Granted
Land North Of Blackworth Blackworth Industrial Estate Highworth Swindon SN6 7NA
Discharge of condition 4 (Biodiversity Gain Plan) from previous application S/OUT/26/0009 - Hybrid Planning Application for a mixed used development including detailed planning permission for the provision of access from Blackworth to the site, erection of 90. no dwellings (Use Class C3) public open space, highways and drainage infrastructure and other ancillary works and outline planning permission for a 75 no. bed care home (C2) and a 0.25ha of Employment Space (Use Class E).
-
S/COND/26/0894 Granted
Land North Of Blackworth Blackworth Industrial Estate Highworth Swindon SN6 7NA
Discharge of Condition 30 (Bird/Swift nesting boxes) from Planning Application S/OUT/26/0009 - Hybrid Planning Application for a mixed used development including detailed planning permission for the provision of access from Blackworth to the site, erection of 90. no dwellings (Use Class C3) public open space, highways and drainage infrastructure and other ancillary works and outline planning permission for a 75 no. bed care home (C2) and a 0.25ha of Employment Space (Use Class E).
-
S/COND/26/1124 Awaiting decision
Spectrum Building Mead Way Swindon SN15 7UT
Discharge of Condition 3 - Level 3 Recording of Northern Elevation from previous application S/LBC/26/0037.