Planning application
31 East Cliff Pennard Swansea SA3 2AS
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Variation of condition 6 of Planning Permission 2021/1903/FUL granted 14th January 2022 to replace electromagnetic smart glazing with anti glare glazing film
As published by the council, reference 2023/1100/S73
Application record
- Reference
- 2023/1100/S73
- Type
- Variation of Condition
- Status
- Awaiting decision
- Received
- 17 May 2023
- Validated
- 17 May 2023
- Ward
- Pennard - Area 2
- Postcode
- SA3 2AS
Timeline
Dates from the published record
-
17 May 2023
Received by Swansea
-
3 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 July 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Swansea took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Swansea
81 applications on PlanIndex · across 5 councils · 84% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Swansea for determination, against a statutory target of eight weeks. Over the last year Swansea decided amendment applications in a median of 52 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
31 East Cliff Southgate Swansea SA3 2AS
Pre-application enquiry - Replacement detached dwelling
Decided Other New dwelling 18 docsDomestic -
34 East Cliff Pennard Swansea SA3 2AS
Replacement detached dwelling and detached garage (amendment to planning permission 2019/1800/FUL granted 15th October 2019)
Granted Full applications New dwelling 24 docsDomestic -
34 East Cliff Southgate Swansea SA3 2AS
Pre-Application - Replacement detached dwelling
Decided Other New dwelling 4 docsDomestic -
34 East Cliff Pennard Swansea SA3 2AS
Replacement detached dwelling and double garage
Granted Full applications New dwelling 33 docsDomestic -
23 East Cliff Pennard Swansea SA3 2AS
Detached dwelling and outbuilding - Removal of condition 6 (scheme for the eradication of the three-cornered garlic) of planning permission 2022/1033/FUL granted 24th June 2022
Granted Amendments New dwelling 7 docsSmall domestic -
14 Bosco Lane Pennard Swansea SA3 2AW
Demolition of ex defective premises and construction of replacement dwelling and attached garage
Granted Full applications Demolition 26 docsDomestic
Other amendment applications
In Swansea
-
2026/1073/S73 Refused
553 Gower Road Killay Swansea SA2 7DS
Variation of condition 3 of Planning Permission 2021/2283/FUL granted 3rd September 2021 to supply local pubs and annual beer festivals/events with our beer.
-
2026/1436/NMA Awaiting decision
30 Whitestone Road Bishopston Swansea SA3 3DB
Non-Material Amendment to Planning Permission 2026/1048/FUL granted 17th August 2026 to increase the height of the dormer to allow for an internal head height of 2.3m
-
2026/1159/NMA Granted
79 Southgate Road Southgate Swansea SA3 2DH
Part rebuild of side and front walls to existing house, front inset balcony, replacement front bay windows, two side dormer extensions and fenestration alterations - Non Material Amendment to planning permission 2026/0227/FUL granted 15th May 2026 to amend the internal layout to make the dwelling accessible, en-suite added to bedroom 3 with a rear obscure glazed dormer window added, glazed side lights and a feature apex window added to the front elevation balcony opening and the external roof finish and dormer wall finishes amended to riven fibre cement slates.
-
2026/1143/NMA Granted
36 Woodville Road Mumbles Swansea SA3 4AD
Replacement roof structure with roof lights and fenestration alterations to existing single storey rear extensions - Non Material Amendment to planning permission 2023/2287/FUL granted 18th January 2024 to allow for the use of aluminium sliding doors and windows to the rear ground floor extension (in lieu of the approved uPVC door and window) and a change of window material to first floor rear windows to timber.
-
2026/1424/NMA Awaiting decision
Plot D5b Land South Of Fabian Way And East Of River Tawe Swansea
Construction of 35 no. apartments and 8 no. townhouses and associated works - Non Material Amendment to Planning application 2022/1109/RES granted 11th July 2024 to allow a change to the roofing material, cappings, trims and edge details