Planning application
Land At Abergelli Farm Felindre Swansea SA5 7NN
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Details to be agreed re Section 106 Supply Chain Initiative
As published by the council, reference 2020/0621/DCO
Application record
- Reference
- 2020/0621/DCO
- Type
- Development Consent Order
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 27 Mar 2020
- Validated
- 27 Mar 2020
- Decided
- 28 Apr 2020
- Ward
- Mawr - Area 1
- Parish
- Mawr Community Council
- Decision by
- Delegated Decision
- Postcode
- SA5 7NN
Site history
Applications at this address on the Swansea register
This site has had 8 applications since 2018: 7 approved, 0 refused.
-
2025/1580/FUL Awaiting decision
Land At Abergelli Farm Felindre Swansea SA5 7NN
Erection of battery energy storage system (BESS), associated infrastructure and vehicular access
-
2020/0622/DOC Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2020/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
-
2020/0623/DOC Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2021/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
-
2020/0619/DCO Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Details to be agreed for Requirement 12 Reptile Method Statement
-
2018/2021/FUL Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Installation of an electrical connection in the form of a new 400kV underground cable to export power from the Abergelli Power Station to the National Grid Electricity Transmission System at the Swansea North Substation, including associated engineering operations and landscaping
-
2018/2020/FUL Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Installation of a gas connection in the form of a new above ground installation and underground gas pipeline to bring natural gas from the National Gas Transmission system to the Abergelli Power Station, including access, associated engineering operations and landscaping
-
2018/1289/DCO Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Gas fired power station
Timeline
Dates from the published record
-
27 Mar 2020
Received by Swansea
-
28 Apr 2020
Decision issued: Approve
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
AECOM Limited Agent, registered in London
Active · incorporated 1984 · London
304 applications on PlanIndex · across 77 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 28 April 2020, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Swansea's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2020/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
Granted Conditions 9 docs -
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2021/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
Granted Conditions 9 docs -
Land At Abergelli Farm Felindre Swansea SA5 7NN
Details to be agreed for Requirement 12 Reptile Method Statement
Granted 9 docs -
-
Land West Of Rhydypandy Road Morriston Swansea
Request for a screening Opinion for a Battery Storage/Energy Management Facility
Decided Outline 8 docs -
Land West Rhydypandy Road Felindre Swansea
PRE APP for battery storage and energy management facility
Decided Other 12 docs