Planning application
Land At Abergelli Farm Felindre Swansea SA5 7NN
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Gas fired power station
As published by the council, reference 2018/1289/DCO
Application record
- Reference
- 2018/1289/DCO
- Type
- Development Consent Order
- Status
- Decided
- Decision
- Approve
- Received
- 25 May 2018
- Validated
- 21 Jun 2018
- Decided
- 19 Sep 2019
- Ward
- Mawr - Area 1
- Parish
- Mawr Community Council
- Postcode
- SA5 7NN
Site history
Applications at this address on the Swansea register
This site has had 8 applications since 2018: 7 approved, 0 refused.
-
2025/1580/FUL Awaiting decision
Land At Abergelli Farm Felindre Swansea SA5 7NN
Erection of battery energy storage system (BESS), associated infrastructure and vehicular access
-
2020/0621/DCO Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Details to be agreed re Section 106 Supply Chain Initiative
-
2020/0622/DOC Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2020/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
-
2020/0623/DOC Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2021/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
-
2020/0619/DCO Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Details to be agreed for Requirement 12 Reptile Method Statement
-
2018/2021/FUL Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Installation of an electrical connection in the form of a new 400kV underground cable to export power from the Abergelli Power Station to the National Grid Electricity Transmission System at the Swansea North Substation, including associated engineering operations and landscaping
-
2018/2020/FUL Granted
Land At Abergelli Farm Felindre Swansea SA5 7NN
Installation of a gas connection in the form of a new above ground installation and underground gas pipeline to bring natural gas from the National Gas Transmission system to the Abergelli Power Station, including access, associated engineering operations and landscaping
Timeline
Dates from the published record
-
25 May 2018
Received by Swansea
-
21 Jun 2018
Validated
Checked as complete and ready for consideration.
-
19 Sep 2019
Decision issued: Approve
-
17 Aug 2026
Added to PlanIndex
What this grant of permission means
Swansea granted permission on 19 September 2019, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Swansea's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Land At Abergelli Farm Felindre Swansea SA5 7NN
Details to be agreed re Section 106 Supply Chain Initiative
Granted 9 docs -
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2020/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
Granted Conditions 9 docs -
Land At Abergelli Farm Felindre Swansea SA5 7NN
Discharge of condition 8 of planning permission 2018/2021/FUL granted 6th December 2018 (implementation of a programme of archaeological work)
Granted Conditions 9 docs -
Land At Abergelli Farm Felindre Swansea SA5 7NN
Details to be agreed for Requirement 12 Reptile Method Statement
Granted 9 docs -
Land At Abergelli Farm Felindre Swansea SA5 7NN
Installation of an electrical connection in the form of a new 400kV underground cable to export power from the Abergelli Power Station to the National Grid Electricity Transmission System at the Swansea North Substation, including associated engineering operations and landscaping
Granted Full applications 45 docs -
Felindre Compressor Station Felindre Swansea SA5 7DU
Pre-application enquiry - Replacement of existing 20.5m vent stack with 25m vent stack, and temporary use of adjacent land as a construction compound including the establishment of contractor parking, offices/welfare facilities, materials/equipment storage areas, lighting and perimeter fencing at Felindre Compressor Station
Decided Other 9 docs