Planning application
30 Westmorland Road Maidstone Kent ME15 8BQ
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Erection of a dropped kerb.
As published by the council, reference 26/501451/FULL
Application record
- Reference
- 26/501451/FULL
- Category
- Full applications
- Status
- Decided
- Validated
- 21 May 2026
- Postcode
- ME15 8BQ
Timeline
Dates from the published record
-
21 May 2026
Validated
Checked as complete and ready for consideration.
-
16 Aug 2026
Added to PlanIndex
After the decision
Swale has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
30 Westmorland Road Maidstone Kent ME15 8BQ
Decision due ~16 Jul
Erection of a dropped kerb.
Decided Full applications -
5 Spencer Way Maidstone Kent ME15 8AU
Decision due ~2 Oct
Section 73 Application for Minor Material Amendment to approved plans condition 2 and variation of condition 3 (to allow for amendment to the approved design including replacing the approved flat fibreglass roof with a pitched tile roof and altering the location and arrangement of the approved fenestration) pursuant to 25/500336/FULL for Replacing the existing garage with a single storey side extension.
Awaiting decision Full applications Extension Windows or glazingSmall domestic -
5 Spencer Way Maidstone Kent ME15 8AU
Decision due ~2 Oct
Section 73 Application for Minor Material Amendment to approved plans condition 2 and variation of condition 3 (to allow for amendment to the approved design including replacing the approved flat fibreglass roof with a pitched tile roof and altering the location and arrangement of the approved fenestration) pursuant to 25/500336/FULL for Replacing the existing garage with a single storey side extension.
Awaiting decision Full applications Extension Windows or glazingSmall domestic -
1 Freeman Way Maidstone Kent ME15 8AN
Decision due ~17 Jul
Submission of details pursuant to condition 4 - Method Statement, in relation to planning permission 26/500135/FULL.
Decided -
1 Freeman Way Maidstone Kent ME15 8AN
Decision due ~17 Jul
Submission of details pursuant to condition 4 - Method Statement, in relation to planning permission 26/500135/FULL.
Decided -
Bristol House Cambridge Crescent Maidstone Kent ME15 7NJ
Decision due ~25 Sep
Submission of details pursuant to condition 30 - SUDs Verification Report, Subject to 22/500638/HYBRID
Awaiting decision
Other full applications
In Swale
-
26/503439/FULL Awaiting decision
45 Millfield Sittingbourne Kent ME10 4TR
Conversion of single residential dwelling to a 7 bedroom HMO (Sui Generis), including erection of a single storey side extension and insertion of 1no. rooflight to rear.
-
26/503385/FULL Awaiting decision
478D Loose Road Maidstone Kent ME15 9UB
Section 73 - Application for minor material amendment to approved plans condition 2 (to allow enlargement of the side section of proposed building) pursuant to 24/504167/FULL for - Demolition of existing single storey dwelling and outbuilding, and erection of a self-build detached one bedroom bungalow with associated parking and access.
-
26/503351/FULL Awaiting decision
Macknade Manor Canterbury Road Faversham Kent ME13 8XE
Change of use from a commercial to a residential single dwelling including alterations to fenestration.
-
26/502930/FULL Awaiting decision
Pollehill Farm House Scragged Oak Road Detling Kent ME14 3HL
Erection of rear single storey extension. Repositioning of existing gazebo to accommodate this.
-
26/503210/FULL Awaiting decision
Pilgrims Garth Pilgrims Way Hollingbourne Kent ME17 1UT
Proposed loft conversion with alteration to the existing roof pitch and raising of the ridge height of parts. Installation of 6 no. dormer windows and 3 no. roof lights