Skip to content
PlanIndex Get alerts
Menu

Planning application

East Shore Enterprise Zone Port Of Sunderland East Of Graving Dock South Dock Barrack Street Sunderland SR1 2BU

Awaiting decision Sunderland 22/02696/HAZ Hazardous Substance Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application for Hazardous Substance Consent.

As published by the council, reference 22/02696/HAZ

Application record

Reference
22/02696/HAZ
Type
Hazardous Substance Consent
Status
Current
Received
12 Dec 2022
Validated
20 Dec 2022
Ward
Deptford And Hendon
Postcode
SR1 2BU

Site history

Applications at this address on the Sunderland register

This site has had 2 applications since 2022: 1 approved, 0 refused.

  • 22/01330/MW4 Granted

    East Shore Enterprise Zone Port Of Sunderland East Of Graving Dock South Dock Barrack Street Sunderland SR1 2BU

    Construction and operation of a waste management facility to process waste plastics to produce synthetic hydrocarbons, together with associated ancillary buildings, plant and machinery, roadways and hardstanding (additional drainage info received).

    Decided 8 Feb 2023 Other

Timeline

Dates from the published record

  1. 12 Dec 2022

    Received by Sunderland

  2. 20 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 February 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Sunderland took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Sunderland for determination, against a statutory target of eight weeks. Over the last year Sunderland's median decision took 57 days. More in our guide to how long planning decisions take.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Sunderland

  • 26/01803/MAW Awaiting decision

    Thompsons Of Prudhoe Quarry Springwell Road Springwell Gateshead NE9 7SQ

    Installation of concrete batching plant, including aggregate hoppers, mixing machine, storage silos and aggregate storage bays (part retrospective)

    Received 19 Aug, published by the council 1 Sep 2026 Other
  • 26/01784/MAW Awaiting decision

    Thompsons Of Prudhoe Quarry Springwell Road Springwell Gateshead NE9 7SQ

    Installation of area of concrete hardstanding

    Received 17 Aug, published by the council 1 Sep 2026 Other
  • 26/01687/MAW Awaiting decision

    Eppleton Quarry Downs Pit Lane/Lindsay Street Hetton-le-Hole Houghton-le-Spring DH5 9NH

    The extraction of sand and limestone from Eppleton Quarry up until 2048 (a time extension of 8 years) and the importation of 5.6 million tonnes of material over a 21-year period to infill the resulting void and to restore the quarry. Restoration as extension to Hetton Lyons Country Park. At Eppleton Quarry, Downs Pit Lane, Hetton le Hole

    Received 4 Aug, published by the council 19 Aug 2026 Other
  • 26/01691/HY4 Awaiting decision

    Land To The North Of A1290 Washington.

    Hybrid Application comprising 442 dwellings (C3 use) including details of the means of access served from the A1290, earthworks, landscaping, public open space and drainage attenuation (full application), and construction of employment floorspace (Use Class (B8) with ancillary (E(g)(i)) office associated servicing and infrastructure, including sub-station, car parking, service yards and circulation space, drainage attenuation, earthworks and landscaping (outline application all matters reserved).

    Received 4 Aug, published by the council 23 Aug 2026 Other
  • 26/01596/LP3 Awaiting decision

    Usworth Recreation Park Manor Road Concord Washington

    Repair of fire damaged building including amendments to the front elevations. Existing stepped access/doorway to the left side of the front elevation to be infilled with timber studs and new window opening installed. Existing external sand/cement render to be stripped off and new vented cavity system constructed and finished with silicone render system and replacement PVCu windows

    Received 21 Jul, published by the council 9 Sep 2026 Other