Proposal
Partial discharge of condition 4 (bat licence) from S.25/1587/HHOLD.
As published by the council, reference S.26/1077/DISCON
Timeline
Dates from the published record
-
18 Jun 2026
Received by Stroud
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Stroud for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.26/0613/DISCON Decided
The Wreaton Burleigh Lane Burleigh Stroud Gloucestershire GL5 2PQ
Partial discharge of condition 7 for dwellinghouse excluding garage (materials) from S.25/1587/HHOLD.
-
S.26/0147/HHOLD Withdrawn
Paddock Green Burleigh Lane Burleigh Stroud Gloucestershire GL5 2PQ
Erection of first floor and single storey extension. Installation of render and alterations to fenestration. Erection of a summer room and replacement garage. Alterations to access.
-
S.26/0160/HHOLD Decided
31 Sheppard Way Minchinhampton Stroud Gloucestershire GL6 9BZ
Erection of a single storey rear extension, porch canopy, installation of render and alterations to fenestration.
-
S.23/0071/HHOLD Decided
26 Dr Browns Road Minchinhampton Stroud Gloucestershire GL6 9BT
Two-storey extension to the north and west elevation, new dormer window and alterations to pitch of garage roof.
-
S.26/0444/MINAM Granted
Beechwood Park Burleigh Stroud Gloucestershire GL5 2PH
Non-material amendment to S.25/0590/HHOLD - alterations to fenestration.
-
S.26/1035/MINAM Granted
Beechwood Park Burleigh Stroud Gloucestershire GL5 2PH
Non-material amendment to S.25/0590/HHOLD - addition of one window
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.