Planning application
S.26/0413/DISCON
War Memorial Recreation Ground Kingshill Road Dursley Gloucestershire
Proposal
Discharge of condition 3 (contaminated land) from S.24/0043/FUL.
As published by the council, reference S.26/0413/DISCON
Timeline
Dates from the published record
-
5 Mar 2026
Received by Stroud
-
13 Apr 2026
Validated
Checked as complete and ready for consideration.
-
2 Jun 2026
Decision issued: Refusal
-
27 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.26/0773/FUL Decided
The Vibe Youth Centre 3 Parsonage Street Dursley Gloucestershire GL11 4BW
Replacement of the main entrance door
-
S.26/0367/LBC Withdrawn
The Vibe Youth Centre 3 Parsonage Street Dursley Gloucestershire GL11 4BW
Replacement of The Vibe Youth Centre main entrance door.
-
S.26/0462/FUL Awaiting decision
Land Off Prospect Place May Lane Dursley Gloucestershire
Demolition of the derelict property at 11/11A May Lane, together with a single garage and a warehouse building off Prospect Place. Redevelopment of the site to provide 17 No residential dwellings, including associated car parking, landscaping, private and communal amenity space, cycle parking, and refuse & recycling storage.
-
S.26/1135/FUL Awaiting decision
43 Parsonage Street Dursley Gloucestershire GL11 4BP
Change of use of ground floor from sui generis (Bar) to cafe (Class E), conversion of upper floors into a residential flat (C3) and new Shopfront.
-
S.26/0453/P3E Granted
52/56 Parsonage Street Dursley Gloucestershire GL11 4AA
Change of use from office (Class E) to two flats (Class C3).
-
S.26/0226/TCA Granted
Treehouse Castle Street Dursley Gloucestershire GL11 4BS
T1 & T2 Ash Tree - re-pollard by approx 3m.
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.