Planning application
S.26/0176/DISCON
Eastington Trading Estate Churchend Eastington Gloucestershire GL10 3RZ
Proposal
Discharge of condition 3 (contaminated land) parts 3, 4 and 5 from S.22/0273/FUL.
As published by the council, reference S.26/0176/DISCON
Timeline
Dates from the published record
-
3 Feb 2026
Received by Stroud
-
7 Apr 2026
Decision issued: Permission
-
27 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.26/0610/DISCON Awaiting decision
Eastington Trading Estate Churchend Eastington Gloucestershire GL10 3RZ
Discharge of condition 5 (lighting design strategy) and 6 (biodiversity enhancement) from S.22/0273/FUL.
-
S.26/0269/FUL Withdrawn
Oldbury Lock Churchend Eastington Gloucestershire
Installation of a new culvert on Oldbury Brook.
-
S.26/0526/TCA Granted
Oldbury Lock Churchend Eastington Gloucestershire
Ash tree - fell.
-
2021/0517/EIAS Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Request for a formal EIA Scoping Opinion for a proposed Eco-Park development comprising a 5,000 capacity football stadium, indoor and outdoor playing pitches, academy building, up to 40,000 sq. metres of Class E and 20,000 sq. metres of B2/B8 employment floorspace, a hotel with up to 100 beds, a Care Village including a 70 bed Care Home, as well as associated access, parking, landscaping and other ancillary works
-
S.24/1329/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 41 (ground contamination) from S.19/0291/FUL. (Site wide).
-
S.25/2466/DISCON Decided
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.