Skip to content
PlanIndex Get alerts
Menu

Planning application

S.26/0167/DISCON

Long View House Box Gloucestershire GL6 9HD

Decided Stroud Discharge of Condition

Proposal

Discharge of condition 4 (construction management plan) from S.25/2103/VAR.

As published by the council, reference S.26/0167/DISCON

Timeline

Dates from the published record

  1. 2 Feb 2026

    Received by Stroud

  2. 9 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 4 Mar 2026

    Decision issued: Permission

  4. 27 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • Long View House Box Gloucestershire GL6 9HD

    Discharge of condition 5 (materials) from S.25/0662/FUL.

    12 Mar 2026 1m away Conditions
  • S.25/2239/FUL Awaiting decision

    Land At Rose Cottage Box Gloucestershire

    Erection of open porch covering to front & rear entrance. Erection of two storey side extension to North East Elevation, relocation of external steps. Conversion of void under driveway to habitable space

    19 Nov 2025 39m away Full applications
  • 2014/0888/WIG Decided

    Tunnel House Box Stroud Gloucestershire GL6 9HB

    New dwelling.

    7 Apr 2014 70m away
  • S.26/1299/HHOLD Awaiting decision

    Hazel Cottage Box Stroud Gloucestershire GL6 9HD

    Erection of a two storey and single storey side extension

    27 Jul 2026 142m away Householder
  • S.21/1730/TCA Granted

    Daneshill House Box Stroud Gloucestershire GL6 9HD

    T1 - Reduce Portuguese Laurel by 1.5 metres all round.

    12 Jul 2021 207m away Trees
  • S.26/0344/HHOLD Decided

    The Studio Box Stroud Gloucestershire GL6 9HD

    Erection of front dormer windows and replacement rear dormer. Alterations to roof lights and replacement roof tiles.

    27 Feb 2026 275m away Householder

In Stroud

  • The White House Cam Dursley Gloucestershire GL11 5JA

    Discharge of condition 3 (roof light) from S.26/0203/LBC.

    5 Jun 2026 Conditions
  • Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT

    Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.

    30 Jun 2026 Conditions
  • S.26/0970/DISCON Split decision

    Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire

    Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.

    3 Jun 2026 Conditions
  • Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire

    Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only

    13 May 2026 Conditions
  • Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire

    Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.

    20 Aug 2025 Conditions