8 Dec 2025
Received by Stroud
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Stroud for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.26/0097/MINAM Granted
Parcel H3, H4 & H5 Box Road Cam Gloucestershire
Non-material amendment to S.25/0392/REM - removal of garages to plots 136, 137, 145, 165, 186, 191, 200, 204, 221, 229, 288, 308, 309. Erection of cycle sheds. Substitutions of boundary treatments.
-
S.26/0939/MINAM Granted
Parcels H3, H4 & H5 Box Road Cam Gloucestershire
Non-material amendment to S.25/0392/REM - Removal of tudor boarding with render detail to Plots 213, 223, 224, 225, 226, 228 and 233 (7 plots).
-
S.26/0648/MINAM Granted
Parcels H3, H4 & H5 Box Road Cam Gloucestershire
Non-material amendment to S.25/0392/REM - alterations to front door colour, brick type and block paving.
-
S.25/2089/DISCON Awaiting decision
Parcel H3 - H5 Box Road Cam Gloucestershire
Partial discharge of condition 19 (cycle path) from S.15/2804/OUT for parcels H3 - H5.
-
S.26/0330/DISCON Decided
Parcel H3 & H5 Box Road Cam Gloucestershire
Discharge condition 27 (Biodiversity Management Plan) from S.15/2804/OUT for parcels H3 to H5.
-
S.26/0699/VAR Awaiting decision
Land North East Of Draycott Cam Gloucestershire
Removal of condition 37(self-build development) from the application S.15/2804/OUT.
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.