Skip to content
PlanIndex Get alerts
Menu

Planning application

Ham Mills London Road Thrupp Stroud Gloucestershire

Awaiting decision Stroud S.25/0406/LBC Listed Building Application

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Redevelopment of site to deliver 105 new dwellings through conversion of existing buildings and new build. Provision of commercial space (use class E), construction of pedestrian crossing on London Road and associated works

As published by the council, reference S.25/0406/LBC

Application record

Reference
S.25/0406/LBC
Type
Listed Building Application
Status
Awaiting decision
Received
28 Feb 2025
Validated
1 Apr 2025
Ward
Thrupp Ward
Parish
Brimscombe And Thrupp Parish Council
Decision by
DELEGATED

Site history

Applications at this address on the Stroud register

This site has had 2 applications since 2025.

  • S.25/0405/FUL Awaiting decision

    Ham Mills London Road Thrupp Stroud Gloucestershire

    Redevelopment of site to deliver 105 new dwellings through conversion of existing buildings and new build. Provision of commercial space (use class E), construction of pedestrian crossing on London Road and associated works

    Submitted 28 Feb 2025 Full applications

Timeline

Dates from the published record

  1. 28 Feb 2025

    Received by Stroud

  2. 1 Apr 2025

    Validated

    Checked as complete and ready for consideration.

  3. 2 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stroud took a median of 56 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: S.25/0405/FUL (Awaiting decision)

Who's behind it

Company information only, from the register and Companies House

Stonewood Homes Ltd And Stroud Corporation NV Applicant, a developer

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

263 documents on file for this application

  • HAM HOUSE Public Comment · 11 May 2026
  • CONSERVATION & DESIGN Consultee Comment · 20 Apr 2026
  • HAM HOUSE Public Comment · 15 Jan 2026
  • THE COTTAGE Public Comment · 15 Dec 2025
  • 2 GREENHILL PLACE Public Comment · 03 Dec 2025
  • BUILDINGS M & D - EXISTING GROUND FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING FIRST FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING SECOND FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING THIRD FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING FOURTH FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING ROOF PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED GROUND FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED FIRST FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED SECOND FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED THIRD FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED FOURTH FLOOR PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED ROOF PLAN Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED SECTION C-C + PARTIAL NW ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING NORTH WEST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING NORTH EAST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING SOUTH WEST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - EXISTING SOUTH EAST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED NORTH WEST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED SOUTH WEST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED SOUTH EAST ELEVATION Revised Drawing · 21 Nov 2025
  • BUILDINGS M & D - PROPOSED NORTH EAST ELEVATION Revised Drawing · 21 Nov 2025
  • THE GEORGIAN GROUP Consultee Comment · 05 Nov 2025
  • PROPOSED SITE PLAN HARD LANDSCAPE LAYOUT Drawing · 15 Oct 2025
  • STREET ELEVATIONS - SHEET 2 Drawing · 15 Oct 2025
  • APT BUILDING A ? PROPOSED GROUND & FIRST FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING A - PROPOSED SECOND & THIRD FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING A - PROPOSED ROOF PLAN Drawing · 15 Oct 2025
  • APT BUILDING A - PROPOSED SOUTH EAST & NORTH EAST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING A - PROPOSED NORTH WEST & SOUTH WEST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING B - PROPOSED GROUND & FIRST FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING B - PROPOSED SECOND & THIRD FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING B - PROPOSED ROOF PLAN Drawing · 15 Oct 2025
  • APT BUILDING B - PROPOSED SOUTH EAST & NORTH EAST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING B - PROPOSED NORTH WEST & SOUTH WEST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING C - PROPOSED GROUND & FIRST FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING C - PROPOSED SECOND & THIRD FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING C - PROPOSED ROOF PLAN Drawing · 15 Oct 2025
  • APT BUILDING C - PROPOSED SOUTH EAST & NORTH EAST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING C - PROPOSED NORTH WEST & SOUTH WEST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING D - PROPOSED GROUND & FIRST FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING D - PROPOSED SECOND & THIRD FLOOR PLANS Drawing · 15 Oct 2025
  • APT BUILDING D - PROPOSED ROOF PLAN Drawing · 15 Oct 2025
  • APT BUILDING D - PROPOSED SOUTH EAST & NORTH EAST ELEVATIONS Drawing · 15 Oct 2025
  • APT BUILDING D - PROPOSED NORTH WEST & SOUTH WEST ELEVATIONS Drawing · 15 Oct 2025
  • PROPOSED SITE PLAN & HARD LANDSCAPE LAYOUT Drawing · 15 Oct 2025
  • BOUNDARY TREATMENTS Drawing · 15 Oct 2025
  • PARKING PLAN WITH SCHEDULE OF ACCOMMODATION Drawing · 15 Oct 2025
  • ECOLOGY LAYOUT Drawing · 15 Oct 2025
  • FLOOD RISK ASSESSMENT & DEVELOPMENT DRAINAGE STRATEGY Report · 01 Oct 2025
  • BIODIVERSITY NET GAIN STATEMENT AND ASSESSMENT Report · 01 Oct 2025
  • FINANCIAL VIABILITY ASSESSMENT Report · 01 Oct 2025
  • FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY Report · 01 Oct 2025
  • FLOOD RISK ASSESSMENT & DEVELOPMENT DRAINAGE STRATEGY Report · 01 Oct 2025
  • COMPENSATORY STORAGE ASSESSMENT & POST-DEVELOPMENT MODELLING Report · 01 Oct 2025
  • CULVERT CONDITION SURVEY Report · 01 Oct 2025
  • BIODIVERSITY NET GAIN STATEMENT AND ASSESSMENT Report · 01 Oct 2025
  • ECOLOGICAL IMPACT ASSESSMENT Report · 01 Oct 2025
  • GCC HIGHWAYS Consultee Comment · 09 Sep 2025
  • HSE Consultee Comment · 30 Jun 2025
  • WATER RESOURCES COMMENT Consultee Comment · 16 Jun 2025
  • BRIMSCOMBE AND THRUPP PARISH COUNCIL Consultee Comment · 06 Jun 2025
  • CREST HOUSE Public Comment · 01 Jun 2025
  • SITE NOTICE NOV 17 Correspondence · 22 May 2025
  • ASSOCIATION FOR INDUSTRIAL ARCHAEOLOGY IRONBRIDGE GORGE MUSEUM Public Comment · 21 May 2025
  • THE GEORGIAN GROUP COMMENT Consultee Comment · 16 May 2025
  • 2 GLYN TERRACE Public Comment · 15 May 2025
  • 3 GREENHILL PLACE Public Comment · 14 May 2025
  • LYNCROFT Public Comment · 14 May 2025
  • ARCHAEOLOGY UK Consultee Comment · 13 May 2025
  • HISTORIC ENGLAND Consultee Comment · 13 May 2025
  • CONTAMINATED LAND OFFICER Consultee Comment · 12 May 2025
  • THE COTTAGE Public Comment · 09 May 2025
  • 4 GREENHILL TERRACE Public Comment · 08 May 2025
  • CAPTAINS Public Comment · 07 May 2025
  • CAPTAINS Public Comment · 07 May 2025
  • HAM HOUSE Public Comment · 07 May 2025
  • FRA ANALYSIS BY CORYLUS Public Comment · 07 May 2025
  • SOUCHEZ Public Comment · 02 May 2025
  • SOUCHEZ Public Comment · 02 May 2025
  • NATURAL ENGLAND Consultee Comment · 02 May 2025
  • HAM HOUSE Public Comment · 01 May 2025
  • PUBLIC RIGHTS OF WAY Consultee Comment · 30 Apr 2025
  • 6 SOUTH VIEW COTTAGES Public Comment · 25 Apr 2025
  • THREEWAYS Public Comment · 24 Apr 2025
  • BNG OFFICER Consultee Comment · 24 Apr 2025
  • PARISH CONSULTATION LETTER WEB Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • STANDARD CONSULTATION VIA EMAIL Correspondence · 23 Apr 2025
  • GLOUCESTERSHIRE RAMBLERS Consultee Comment · 23 Apr 2025
  • HARMONY Public Comment · 22 Apr 2025
  • HAM HOUSE Public Comment · 22 Apr 2025
  • BROOKVILLE Public Comment · 22 Apr 2025
  • 1 LARKSFIELD ROAD Public Comment · 20 Apr 2025
  • 4 ALBION TERRACE Public Comment · 19 Apr 2025
  • PEPONI Public Comment · 18 Apr 2025
  • 1 ALBION TERRACE Public Comment · 17 Apr 2025
  • 118 THRUPP LANE Public Comment · 16 Apr 2025
  • 3 ALBION TERRACE Public Comment · 16 Apr 2025
  • 2 GREENHILL PLACE Public Comment · 10 Apr 2025
  • EXISTING GROUND FLOOR PLAN Drawing · 08 Apr 2025
  • EXISTING ROOF PLAN Drawing · 08 Apr 2025
  • BUILDING A GROUND FLOOR PLAN Drawing · 08 Apr 2025
  • BUILDING B GROUND FLOOR PLAN Drawing · 08 Apr 2025
  • BUILDING F EXISTING PLANS & ELEVATIONS Drawing · 08 Apr 2025
  • BUILDING G EXISTING PLANS & ELEVATIONS Drawing · 08 Apr 2025
  • EXISTING SITE ELEVATIONS Drawing · 08 Apr 2025
  • BUILDING A EXISTING ELEVATIONS Drawing · 08 Apr 2025
  • BUILDING B EXISTING ELEVATIONS Drawing · 08 Apr 2025
  • APT BUILDING A PROPOSED ROOF PLANROOF PLAN Drawing · 01 Apr 2025
  • HOUSE TYPE B (3B/6P) FLOOR PLANS Drawing · 01 Apr 2025
  • APT BUILDING B PROPOSED ROOF PLAN Drawing · 01 Apr 2025
  • HOUSE TYPE C (3B/6P) FLOOR PLANS Drawing · 01 Apr 2025
  • APT BUILDING C PROPOSED ROOF PLANS Drawing · 01 Apr 2025
  • BUILDING C PROPOSED FLOOR PLANS Drawing · 01 Apr 2025
  • HOUSE TYPE D (2B/4P) FLOOR PLANS Drawing · 01 Apr 2025
  • APT BUILDING D PROPOSED ROOF PLAN Drawing · 01 Apr 2025
  • HOUSE TYPE E (3B/6P) FLOOR PLANS Drawing · 01 Apr 2025
  • HOUSE TYPE F (2B/4P) FLOOR PLANS Drawing · 01 Apr 2025
  • BUILDING F EXISTING ROOF PLAN Drawing · 01 Apr 2025
  • BUILDING F PROPOSED FLOOR PLANS Drawing · 01 Apr 2025
  • BUILDING G EXISTING PLANS & ELEVATIONS Drawing · 01 Apr 2025
  • BUILDING G PROPOSED PLANS & ELEVATIONS Drawing · 01 Apr 2025
  • HOUSE TYPE H (3B/5P) FLOOR PLANS Drawing · 01 Apr 2025
  • HOUSE TYPE I (3B/5P) FLOOR PLANS Drawing · 01 Apr 2025
  • HOUSE TYPE A (2B/4P) FLOOR PLANS Drawing · 01 Apr 2025
  • FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY PART 1 Report · 27 Mar 2025
  • FRA APPENDIX A, B, C, D Report · 27 Mar 2025
  • FRA APPENDIX E Report · 27 Mar 2025
  • FRA APPENDIX H, I, J Report · 27 Mar 2025
  • TRANSPORT ASSESSMENT Report · 05 Mar 2025
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING D Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE D (2B/4P) Drawing · 28 Feb 2025
  • PROPOSED SOUTH EAST AND NORTH EAST ELEVATIONS - APPARTMENT BUILDING D Drawing · 28 Feb 2025
  • PROPOSED NORTH WEST AND SOUTH WEST ELEVATIONS - APPARTMENT BUILDING D Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE E (3B/6P) Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE E (3B/6P) - ELEVATIONS Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE F (2B/4P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - BUILDING F Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - BUILDING F Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE F (2B/4P) Drawing · 28 Feb 2025
  • EXISTING ELEVATIONS - BUILDING F Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - BUILDING F Drawing · 28 Feb 2025
  • DRAWING ISSUE REGISTER Correspondence · 28 Feb 2025
  • ILLUSTRATIVE MASTERPLAN Drawing · 28 Feb 2025
  • STREET ELEVATIONS - SHEET 2 Drawing · 28 Feb 2025
  • SUN SHADING STUDY Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE A (2B/4P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING A Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING A Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE A (2B/4P) Drawing · 28 Feb 2025
  • PROPOSED SOUTH EAST AND NORTH EAST ELEVATIONS - APARTMENT BUILDING A Drawing · 28 Feb 2025
  • PROPOSED NORTH WEST AND SOUTH WEST ELEVATIONS - APPARTMENT BUILDING A Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE B (3B/6P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING B Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING B Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE B (3B/6P) Drawing · 28 Feb 2025
  • PROPOSED SOUTH EAST AND NORTH EAST ELEVATIONS - APARTMENT BUILDING B Drawing · 28 Feb 2025
  • PROPOSED NORTH WEST AND SOUTH WEST ELEVATIONS - APARTMENT BUILDING B Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE C (3B/6P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING C Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APPARTMENT BUILDING C Drawing · 28 Feb 2025
  • EXISTING FLOOR PLANS - BUILDING C Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - BUILDING C Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE C (3B/6P) Drawing · 28 Feb 2025
  • PROPOSED SOUTH EAST AND NORTH EAST ELEVATIONS - APARTMENT BUILDING C Drawing · 28 Feb 2025
  • PROPOSED NORTH WEST AND SOUTH WEST ELEVATIONS - APARTMENT BUILDING C Drawing · 28 Feb 2025
  • EXISTING ELEVATIONS - BUILDING C Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - BUILDING C Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE D (2B/4P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - APARTMENT BUILDING D Drawing · 28 Feb 2025
  • EXISTING SOUTH EAST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED NORTH WEST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED SOUTH WEST ELEVATION - BUILDING D Drawing · 28 Feb 2025
  • PROPOSED SOUTH EAST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED NORTH EAST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • THE LOCATION PLAN Drawing · 28 Feb 2025
  • EXISTING SITE PLAN AND DEMOLITIONS Drawing · 28 Feb 2025
  • SOFT LANDSCAPE PLAN 1 Drawing · 28 Feb 2025
  • SOFT LANDSCAPE PLAN 2 Drawing · 28 Feb 2025
  • PROPOSED SITE PLAN AND HARD LANDSCAPE LAYOUT Drawing · 28 Feb 2025
  • BOUNDARY TREATMENTS Drawing · 28 Feb 2025
  • PARKING PLAN WITH SCHEDULE OF ACCOMMODATION Drawing · 28 Feb 2025
  • ECOLOGY LAYOUT Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE G (3B/5P) Drawing · 28 Feb 2025
  • EXISTING PLANS AND ELEVATIONS - BUILDING G Drawing · 28 Feb 2025
  • PROPOSED PLANS AND ELEVATIONS - BUILDING G Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE G (3B/5P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE H (3B/5P) Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE H (3B/5P) Drawing · 28 Feb 2025
  • PROPOSED FLOOR PLANS - HOUSE TYPE I (3B/5P) Drawing · 28 Feb 2025
  • PROPOSED ELEVATIONS - HOUSE TYPE I (3B/5P) Drawing · 28 Feb 2025
  • EXISTING GF PLAN - BUILDING M Drawing · 28 Feb 2025
  • EXISTING FF PLAN - BUILDING M Drawing · 28 Feb 2025
  • EXISTING SF PLAN - BUILDING M Drawing · 28 Feb 2025
  • EXISTING 3F PLAN - BUILDING M Drawing · 28 Feb 2025
  • EXISTING 4F PLAN - BUILDING M Drawing · 28 Feb 2025
  • EXISTING ROOF PLAN - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED GF PLAN - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED FF PLAN - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED SF PLAN - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED 3F PLAN Drawing · 28 Feb 2025
  • PROPOSED 4F PLAN Drawing · 28 Feb 2025
  • PROPOSED ROOF PLAN - BUILDING M Drawing · 28 Feb 2025
  • PROPOSED SECTION C-C + PARTIAL NW ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • EXISTING NORTH WEST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • EXISTING SOUTH WEST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • EXISTING NORTH EAST ELEVATION - BUILDING M Drawing · 28 Feb 2025
  • ENGINEERING LAYOUT Drawing · 28 Feb 2025
  • ROAD LONGITUDINAL SECTIONS Drawing · 28 Feb 2025
  • TECHNICAL NOTE Report · 28 Feb 2025
  • ECOLOGICAL IMPACT ASSESSMENT Report · 28 Feb 2025
  • BIODIVERSITY NET GAIN STATEMENT AND ASSESSMENT Report · 28 Feb 2025
  • ARCHAEOLOGICAL ASSESSMENT Report · 28 Feb 2025
  • HORIZONTAL ILLUMINANCE (LUX) Drawing · 28 Feb 2025
  • OUTDOOR LIGHTING REPORT Report · 28 Feb 2025
  • LIGHTING STRATEGY Report · 28 Feb 2025
  • BASELINE SURVEY Report · 28 Feb 2025
  • STREET ELEVATIONS - SHEET 1 Drawing · 28 Feb 2025
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 28 Feb 2025
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 28 Feb 2025
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 28 Feb 2025
  • DESIGN AND ACCESS STATEMENT Design and Access Statement · 28 Feb 2025
  • VISUALISATIONS Photo · 28 Feb 2025
  • VISUALISATIONS Photo · 28 Feb 2025
  • SUPPLEMENTARY PLANNING DOCUMENT Report · 28 Feb 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 28 Feb 2025
  • FINANCIAL VIABILITY ASSESSMENT Report · 28 Feb 2025
  • PLANNING STATEMENT Report · 28 Feb 2025
  • SOFT LANDSCAPE PLAN 1 Drawing · 28 Feb 2025
  • SOFT LANDSCAPE PLAN 2 Drawing · 28 Feb 2025
  • TRAVEL PLAN Report · 28 Feb 2025
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 28 Feb 2025
  • TREE CONSTRAINTS REPORT Report · 28 Feb 2025
  • TREE CONSTRAINTS PLAN Drawing · 28 Feb 2025
  • TREE SURVEY SCHEDULE Report · 28 Feb 2025
  • HERITAGE STATEMENT Report · 28 Feb 2025
  • HERITAGE STATEMENT Report · 28 Feb 2025
  • HERITAGE STATEMENT Report · 28 Feb 2025
  • FLOOD RISK ASSESSMENT Report · 28 Feb 2025
  • FOUL AND SURFACE WATER DRAINAGE STRATEGY Report · 28 Feb 2025
  • FLOOD RISK ASSESSMENT & DRAINAGE STRATEGY Report · 28 Feb 2025
  • FRA APPENDIX F & G Report · 27 Feb 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Stroud for determination, against a statutory target of eight weeks. Over the last year Stroud decided heritage and listed building applications in a median of 79 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Stroud

  • S.26/1908/LBC Awaiting decision

    Manor Farm Portway Upton St Leonards Gloucester Gloucestershire GL4 8DP

    Erection of a replacement single storey extension, link extension to Coach House, porch, installation of solar panels, internal alterations and refurbishment.

    Heritage and listed buildings
  • S.26/1901/LBC Awaiting decision

    44 Middle Street Stroud Gloucestershire GL5 1DZ

    Alterations to provide an en-suite shower room to the second floor bedroom.

    Heritage and listed buildings
  • S.26/1926/LBC Awaiting decision

    81B Bowbridge Lane Stroud Gloucestershire GL5 2JH

    Essential remedial works to ground floor (retrospective).

    Received 28 Oct, published by the council 30 Oct 2026 Heritage and listed buildings
  • S.26/1922/LBC Awaiting decision

    14 The Street Uley Dursley Gloucestershire GL11 5TE

    Alterations to two approved French doors and insertion of new French door to rear elevation. Removal of single window to rear elevation. Removal of stud partitioning to former w/c and formation of new ensuite (retrospective).

    Heritage and listed buildings
  • S.26/1920/LBC Awaiting decision

    Dunkirk Manor Cottages Theescombe Amberley Gloucestershire GL5 5AU

    Replacement of the existing uPVC casement windows and entrance door on the west elevation.

    Received 28 Oct, published by the council 2 Nov 2026 Heritage and listed buildings