Planning application
S.24/1882/DISCON
Land North Of Cirencester Road Minchinhampton Gloucestershire
Proposal
Discharge Condition 7 (Ground Contamination) from permitted application S.21/0484/FUL
As published by the council, reference S.24/1882/DISCON
Timeline
Dates from the published record
-
17 Oct 2024
Received by Stroud
-
21 Oct 2024
Validated
Checked as complete and ready for consideration.
-
8 Nov 2024
Decision issued: Permission
-
2 Aug 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.26/0213/TPO Granted
27 Besbury Park Minchinhampton Stroud Gloucestershire GL6 9EN
TPO/0469 - Beech Tree- Reduce the radial crown spread over the garden from approximately 9.0m to approximately 6.0m and shape into either side and top. Crown raise over the garden to approximately 6.0m above ground level.
-
S.26/0451/FUL Awaiting decision
Land South Of Cirencester Road Minchinhampton Gloucestershire
Erection of 30 dwellings (including affordable housing) with associated highway access, landscaping, external works & infrastructure, including installation of sewage pumping station.
-
S.26/0653/HHOLD Decided
9 Besbury Park Minchinhampton Stroud Gloucestershire GL6 9EN
Erection of a single storey rear and side extension.
-
S.26/0342/HHOLD Decided
3 Summersfield Close Minchinhampton Stroud Gloucestershire GL6 9LJ
Erection of a single storey side and rear extension. Installation of cladding.
-
S.21/1343/FUL Decided
18, 24, 25 & 33 The Tynings Minchinhampton Stroud Gloucestershire GL6 9EW
External insulated render system
-
S.23/0368/MINAM Granted
5 The Tynings Minchinhampton Stroud Gloucestershire GL6 9EJ
Minor amendment to application S.22/1978/HHOLD -change material on the porch from render to reconstructed stone.
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.