Skip to content
PlanIndex Get alerts
Menu

Planning application

S.23/0300/DISCON

Land Opposite Rose Inn Paganhill Lane Stroud Gloucestershire

Decided Stroud Discharge of Condition

Proposal

Discharge conditions 4 (CMP), 6 (Materials) & 9 (Landscaping) from the application S.22/1086/FUL.

As published by the council, reference S.23/0300/DISCON

Timeline

Dates from the published record

  1. 10 Feb 2023

    Received by Stroud

  2. 16 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 8 Mar 2023

    Decision issued: Permission

  4. 2 Aug 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • S.25/2164/FUL Awaiting decision

    Rose Inn Paganhill Lane Stroud Gloucestershire GL5 4AW

    Change of use of public house (Sui Generis) to 3 residential dwellings, demolition of existing extension & outbuilding, erection of a new dwelling on the car park, with associated hard & soft landscaping.

    7 Nov 2025 56m away Full applications
  • S.24/1661/HHOLD Withdrawn

    5 Mill Farm Drive Paganhill Stroud Gloucestershire GL5 4JZ

    Installation of an air source heat pump

    16 Sep 2024 68m away Householder
  • S.26/0140/FUL Decided

    A S Cooke & Co Ltd Park End Paganhill Stroud Gloucestershire GL5 4AS

    Change of use of Builders Workshop (Sui Generis) to Dwelling (C3). External alterations and installation of air source heat pump.

    28 Jan 2026 74m away Full applications
  • S.26/0229/LBC Granted

    2 Old Crown Cottages Park End Paganhill Stroud Gloucestershire GL5 4AZ

    Relocation of boiler flue.

    10 Feb 2026 171m away Heritage and listed buildings
  • S.24/1451/HHOLD Decided

    The Croft Downfield Stroud Gloucestershire GL5 4HJ

    Erection of a replacement single storey rear and side extension.

    12 Aug 2024 175m away Householder
  • S.21/1459/HHOLD Decided

    64 Mathews Way Stroud Gloucestershire GL5 4EB

    Removal of conservatory and erection of single storey rear extension.

    9 Jun 2021 229m away Householder

In Stroud

  • The White House Cam Dursley Gloucestershire GL11 5JA

    Discharge of condition 3 (roof light) from S.26/0203/LBC.

    5 Jun 2026 Conditions
  • Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT

    Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.

    30 Jun 2026 Conditions
  • S.26/0970/DISCON Split decision

    Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire

    Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.

    3 Jun 2026 Conditions
  • Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire

    Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only

    13 May 2026 Conditions
  • Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire

    Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.

    20 Aug 2025 Conditions