Planning application
The Priors School School Lane Priors Marston Southam CV47 7RR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 50 solar panels
As published by the council, reference 24/02895/LDP
Application record
- Reference
- 24/02895/LDP
- Type
- Certificate Lawful Development-Proposed
- Status
- Proposed Lawful Development - Permitted
- Decision
- Granted As published: Lawful Dev. Cert. Proposed Permitted
- Received
- 13 Nov 2024
- Validated
- 13 Nov 2024
- Decided
- 7 Jan 2025
- Ward
- Bishops Itchington, Fenny Comp & Napton
- Parish
- Priors Marston
- Postcode
- CV47 7RR
Timeline
Dates from the published record
-
13 Nov 2024
Received by Stratford-on-Avon
-
7 Jan 2025
Decision issued: Lawful Dev. Cert. Proposed Permitted
-
19 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stratford-on-Avon granted permission on 7 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Magnolia House School Lane Priors Marston Southam CV47 7RR
T1 - goat willow - Fell T2 - apple - Crown reduction of lateral spread from 4metres to 3metres T3 - apple - Crown reduction of lateral spread from 6metres to 4.5metres to clear adjacent garage T4 - apple - Fell T5 - holly - Reduce height from 10metres to 7metres T6 - lilac - Crown reduction from 6metres to 2metres T7 and T8 - magnolia - Crown lift to give 2.5metres clearance above ground level and reduce lateral spread by 1.5metre
Granted Trees 9 docs -
Craig Cottage School Lane Priors Marston Southam CV47 7RR
Group of 8 no. ash trees - reduce the height of the trees to 1.5 metres due to extensive dead wood and ash dieback disease.
Granted Trees 5 docs -
Ambercote School Lane Priors Marston Southam CV47 7RR
Variation of condition three (approved plans) of outline permission 21/00058/OUT (determined 09.12.2021) to allow for new design. Original description of development: construction of a new, two-storey, three-bedroom house on land to rear
Granted Conditions 48 docs -
Ambercote School Lane Priors Marston Southam CV47 7RR
Reserved matters (landscaping) pursuant to outline permission 22/02120/VARY for a dwelling
Granted Reserved matters 23 docsDomestic -
Ambercote School Lane Priors Marston CV47 7RR
Demolish the existing dilapidated Kitchen extension and construct a new extension in its place.
Granted Full applications Extension Demolition 12 docs -
Land Adjacent To Hollybush Cottage Holly Bush Lane Priors Marston
Vary condition 2 and 5 of planning permission 18/03215/VARY (date of decision: 22.03.2019) to amend the approved landscaping scheme.
Granted Conditions 13 docs
Other lawful development applications
In Stratford-on-Avon
-
26/01970/LDP Refused
Gannaway House Gannaway Norton Lindsey Warwick CV35 8JT
Proposed pitched roof side extension and side dormer window.
-
26/01745/FUL Granted
17 Greville Road Alcester B49 5QN
Single storey rear extension
-
26/02238/LDP Granted
17 Greville Road Alcester B49 5QN
Single storey rear extension
-
26/02250/LDP Granted
17 Foster Avenue Studley B80 7QJ
Construction of Garden Room
-
26/01967/LDE Granted
1 The Poplars Poplar Road Napton-on-the-Hill Southam CV47 8NS
Planning permission was granted under application reference 10/02293/FUL for a two-storey side extension with single-storey rear extension. The permission was subject to a condition requiring the submission and approval of bat mitigation measures prior to commencement. This condition was not discharged before the development was undertaken.