Planning application
The Cottage Bates Lane Tanworth-In-Arden B94 5AR
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement and new single storey extensions
As published by the council, reference 21/03062/FUL
Application record
- Reference
- 21/03062/FUL
- Type
- Full Application
- Status
- Permission with Conditions
- Decision
- Granted As published: Permission with Conditions
- Received
- 24 Sep 2021
- Validated
- 24 Sep 2021
- Decided
- 15 Nov 2021
- Ward
- Tanworth-in-Arden
- Parish
- Tanworth-in-Arden
- Postcode
- B94 5AR
Timeline
Dates from the published record
-
24 Sep 2021
Received by Stratford-on-Avon
-
15 Nov 2021
Decision issued: Permission with Conditions
-
16 Nov 2026
Added to PlanIndex
Documents
13 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Stratford-on-Avon granted permission on 15 November 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Stoneleigh Bates Lane Tanworth-in-Arden Solihull B94 5AR
Ash tree- Fell tree to ground level. Ash tree has die back. Remove all green waste from site.
Granted Trees 5 docs -
Stoneleigh Bates Lane Tanworth-in-Arden Solihull B94 5AR
Ash tree- Fell tree to ground level. Ash tree has die back. Remove all green waste from site.
Granted Trees 5 docs -
Newburn Bates Lane Tanworth-in-Arden Solihull B94 5AR
Construction of timber garden room for use as gym/office to include a bathroom. Creation of pad foundations. Connecting to existing mains drains, rainwater and power.
Granted Lawful development 11 docs -
Shenstone Bates Lane Tanworth-in-Arden Solihull B94 5AP
-T1-T11 mixed conifers: Fell.
Granted Trees 4 docs -
Shenstone Bates Lane Tanworth-in-Arden Solihull B94 5AP
99% historically approved · decision due ~14 Dec
T1 - oak - Crown reduction of primary branches, by up to 6m, with retained secondary branches pruned to balance canopy. Remove deadwood throughout.
Awaiting decision Trees 2 docs -
1 Whitehead Almshouses Bates Lane Tanworth-in-Arden Solihull B94 5AP
Extension to existing car parking area for x3 spaces
Granted Full applications Extension 30 docs
Other full applications
In Stratford-on-Avon
-
25/02918/FUL Granted
The Malt House Malthouse Lane Long Compton Shipston-on-Stour CV36 5JL
Partial conversion of barn to form holiday accommodation including re-roofing, installation of a new dormer window and rooflights to the rear, and repairs to and replacement of doors and windows, plus erection of car-port
-
26/01328/FUL Granted
The Hollies Church Street Fenny Compton Southam CV47 2YE
Replacement doors and window to kitchen at rear of property
-
26/01935/FUL Granted
River Reach Ferry Lane Alveston Stratford-upon-Avon CV37 7QX
Proposed self-build dwelling on existing foundations of demolished dwelling and alteration to existing ancillary Boat House annexe
-
26/02385/FUL Granted
Halls Croft Old Town Stratford-upon-Avon CV37 6BG
Removal of an existing door and installation of frame and panels.
-
26/02296/FUL Granted
Haye House Haye Lane Mappleborough Green Studley B80 7BX
Conversion of a domestic outbuilding into an independent C3 dwelling, as a sub-division of the existing site of dwelling Haye House and associated operational development