Planning application
Unit 5 Royce Avenue Cowpen Lane Industrial Estate Billingham TS23 4BX
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Division of existing 1No. unit to 2No. units, including change of use of new unit from Storage and distribution (B8) to Martial Arts Gymnasium (E) including replacement of 2No. door/shutter openings with 1No. door/shutter (alterations to existing car park)
As published by the council, reference 26/1413/COU
Application record
- Reference
- 26/1413/COU
- Type
- Change of Use
- Status
- Awaiting decision
- Received
- 20 Jul 2026
- Validated
- 4 Aug 2026
- Ward
- Billingham South
- Parish
- Billingham Town Council
- Decision by
- Delegated
- Postcode
- TS23 4BX
Timeline
Dates from the published record
-
20 Jul 2026
Received by Stockton-on-Tees
-
4 Aug 2026
Validated
Checked as complete and ready for consideration.
-
13 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockton-on-Tees took a median of 59 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Stockton-on-Tees for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Geoffrey Robinson Limited Macklin Avenue Cowpen Lane Industrial Estate Billingham TS23 4ET
Section 73 application to remove condition no5 (Breeam) of planning approval 20/1608/FUL - Erection of two storey office extension to side of existing office building
Granted Conditions Extension 5 docs -
Unit 7B Daimler Drive Cowpen Lane Industrial Estate Billingham TS23 4JD
Prior notification application for the installation of roof mounted Solar Photovoltaics (PV) panels.
Granted Outline 5 docs -
Earls Nook Cottage Cowpen Bewley Billingham TS23 4HS
Non material amendment to planning approval 17/1021/REV - Revised application for the erection of a two storey extension to rear, replacement of roof over existing side extension and replacement windows.
Granted Amendments Extension Windows or glazing 1 doc
Other full applications applications
In Stockton-on-Tees
-
26/1391/FUL Refused
Land Adjacent To 50 Yarm Lane Stockton-on-tees
Installation of 1no Street Hub Unit
-
26/1669/FUL Awaiting decision
18 Rissington Walk Thornaby Stockton-On-Tees TS17 9QJ
Erection of single storey wrap around extension to the side and rear (demolition of existing conservatory)
-
26/1270/FUL Granted
6 Mount Grove Norton Stockton-On-Tees TS20 1JX
Erection of a single storey extension to rear/side
-
26/1187/FUL Granted
1 Benton Close Billingham TS23 3XL
Erection of single storey front extension (Window alterations to sides)
-
26/0594/FUL Granted
13 Eastbourne Avenue Egglescliffe Stockton-On-Tees TS16 9BZ
Erection of single storey rear extension (demolition of existing rear extension).