Planning application
331 - 333 Norton Road Norton Stockton-on-Tees TS20 2PT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Information to discharge condition no6 (Highway Works) of planning approval 13/1721/REV - Revised application for the replacement of existing buildings with 3 retail units.
As published by the council, reference 26/0066/VARY
Application record
- Reference
- 26/0066/VARY
- Type
- Variation of a condition
- Status
- Awaiting decision
- Received
- 12 Jan 2026
- Validated
- 14 Jan 2026
- Ward
- Norton South
- Decision by
- Delegated
- Postcode
- TS20 2PT
Timeline
Dates from the published record
-
12 Jan 2026
Received by Stockton-on-Tees
-
14 Jan 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockton-on-Tees took a median of 60 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockton-on-Tees for determination, against a statutory target of eight weeks. Over the last year Stockton-on-Tees decided condition discharge and variation applications in a median of 56 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
319 Norton Road Norton Stockton-on-Tees TS20 2PT
Conversion of existing 2 bedroom first floor flat into 2no self contained flats
Granted Full applications New dwelling 6 docs -
304-308 Norton Road Norton TS20 2PU
Retrospective application for the change of use from residential care home to 20 bedroom serviced accommodation
Withdrawn Amendments 9 docs -
Norton Road Mount Pleasant Stockton-On-Tees Portrack TS20 2PT
Prior approval application for proposed 18m Phase 8 Monopole C/W wrapround cabinet at base and associated ancillary works.
Refused Telecoms 12 docs -
351 Norton Road Norton Stockton-on-Tees TS20 2PH
Listed building consent for erection of a 2 storey double garage to rear. (Demolition of existing storage and garage to rear)
Granted Heritage and listed buildings Demolition 7 docs -
351 Norton Road Norton Stockton-on-Tees TS20 2PH
Erection of a 2 storey double garage to rear. (Demolition of existing storage and garage to rear)
Granted Full applications Demolition 9 docs -
355 Norton Road Norton TS20 2PH
Single storey extension to the rear
Granted Full applications Extension 9 docsSmall domestic
Other condition discharge and variation applications
In Stockton-on-Tees
-
26/1862/DCH Awaiting decision
519 Yarm Road Eaglescliffe Stockton-On-Tees TS16 9BG
Information to discharge condition no5 (Nitrate Mitigation) of planning approval 24/1132/COU - Application for the conversion of 1no dwelling into 3no dwellings to include associated landscaping, boundary treatments, parking provisions and any other external works.
-
26/1863/DCH Awaiting decision
Land East Of 433 To 439 Thornaby Road Thornaby TS17 0AB
Information to discharge Condition No.10 (Contaminated Land Risk Assessment) and No.13 (Nitrate Mitigation) of planning approval 22/2394/REV - Revised application for the erection of 2no detached bungalows to include associated external works including alterations to public right of way
-
26/1485/VARY Granted
15A West Street Yarm TS15 9BU
Section 73 application to vary condition No.2 (Approved Plans) of planning approval 25/1894/FUL - Erection of single storey rear extension, detached garage/office to rear and porch to front, including demolition of existing detached garage/outbuildings to rear.
-
25/1739/DCH Granted
Land Off Welwyn Road Ingleby Barwick Stockton On Tees
Information to discharge conditions no14 (Discharge of Surface Water) and no15 (Discharge of Surface Water) of planning approval 23/2292/FUL - Erection of 345no dwellings (Use Class C3), vehicle access from Welwyn Road, landscaping, SUDS, and associated infrastructure works
-
26/1501/VARY Granted
Land At The Vale (Plot 7) Low Lane High Leven Yarm TS15 9JT
Section 73 application to vary condition no1 (Approved Plans) of planning approval 20/2351/REM (Plot 7)