Planning application
Heaton House 16 Shaw Road Heaton Moor Stockport SK4 4AE
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
It is proposed to remove glass panes from a window on the ground floor northwest elevation of the exchange. An aluminium ventilation louvre will be fixed to the window frame in mill finish to match existing,
As published by the council, reference DC/099704
Application record
- Reference
- DC/099704
- Type
- Full Application
- Status
- Registered
- Received
- 20 Jul 2026
- Validated
- 20 Jul 2026
- Ward
- Heatons North (Here)
- Postcode
- SK4 4AE
Comment by 13 September 2026
The council is taking comments on this application until then. Have your say on Stockport's portal.
Timeline
Dates from the published record
-
20 Jul 2026
Received by Stockport
-
29 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 14 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 49 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
26 applications on PlanIndex · across 24 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file, a telecoms contractor
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Stockport for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
14 Derby Range Heaton Moor Stockport SK4 4AB
95% historically approved · decision due ~13 Feb
Discharge of conditions 2, 3, 5 and 6 of DC094843
Awaiting decision Conditions 13 docs -
25 Shaw Road Heaton Moor Stockport SK4 4AG
Application for Variation of Condition 4 (Opening Hours) attached to planning permission DC/078927 to allow opening hours of Monday 9am-6pm, Tuesday and Wednesday 9am-9.30pm, Thursday to Saturday 9am-11pm and Sunday 9am-6pm
Granted Amendments 4 docs -
15 Shaw Road Heaton Moor Stockport SK4 4AG
Discharge of condition 3 (Acoustic Report) of planning permission DC/069380
Decided Conditions 1 doc -
44 Shaw Road Heaton Moor Stockport SK4 4AE
Loft extension with rear facing dormer window
Refused Householder Extension Loft or dormer +1 9 docsDomestic -
1A Portland Grove Heaton Moor Stockport SK4 4AA
Proposed installation of 3 no. non-illuminated building signs; 1 no. to front above first floor window, 1 no. to side above first floor window and 1 no. to the rear next to access door
Split decision Advertising Windows or glazing 6 docs -
7 Flat Peel Moat Road Heaton Moor Stockport SK4 4PL
T1 - Large Ash Sectional dismantle using rigging equipment the large Ash located at the rear right hand corner of the property. Leave stump at 5 metres. REASON : EXTENSIVE ASH DIEBACK T2 - Twin stemmed leaning Cherry rear right of the back garden Strip Ivy from the trunks of the trees. Reduce in height by 2.5 metres and prune lateral limbs on the property side by 1-1.25 metres. REASON: To reduce overhang over the garden and control the size of the tree T3 - Large Cherry - centre of the rear boundary Tidy the upper sections of the crown by approximately 2 metres. Reduce the crown spread on the garden side of the tree by 1.5-2 metres and prune lateral limbs to shape. REASON:To reduce overhang over the garden and control the size of the tree. HAR/CA15, TPO 16N.
Granted Trees 3 docs
Other full applications applications
In Stockport
-
DC/097015 Granted
Northumberland Arms 64 Compstall Road Marple Bridge Stockport SK6 5HD
Change of use of first floor from flat to Sui Generis comprising Public House kitchen and function room, to include formation of new fire escape door, balustrade and staircase from first floor, demolition of existing derelict outbuildings and formation of new bin store within existing yard area
-
DC/097610 Granted
Brabyns Park, Brabyns Lawn Tennis Club Brabyns Brow Marple Bridge Stockport SK6 7DA
Reposition 1no. Tennis court and construct 2no. Padel tennis courts. Installation of 14no. Floodlights.
-
DC/099497 Granted
238 Finney Lane Heald Green Cheadle Stockport SK8 3QD
Retrospective application for siting an InPost Parcel Locker
-
DC/099485 Granted
Morrisons Supermarket Edgeley Road Cheadle Heath Stockport SK3 0RJ
Retrospective application for siting an InPost Parcel Locker.
-
DC/099498 Granted
Morrisons 196-198 Wellington Road North Heaton Norris Stockport SK4 2QN
Retrospective application for siting an InPost Parcel Locker