Planning application
Land South Of Mill Lane Hazel Grove Stockport
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline planning application with all matters reserved for up to 31 dwellings (Use Class C3), public open space and associated infrastructure.
As published by the council, reference DC/099220
Application record
- Reference
- DC/099220
- Type
- Outline Application
- Status
- Registered
- Received
- 2 Jun 2026
- Validated
- 9 Jul 2026
- Ward
- Marple South & High Lane(Marp)
Timeline
Dates from the published record
-
2 Jun 2026
Received by Stockport
-
9 Jul 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 3 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
SATPLAN Ltd Agent, registered in Bootle
Active · incorporated 2012 · Bootle
32 applications on PlanIndex · across 11 councils · 87% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
48 documents on file for this application
- UNITED UTILITIES COMMENTS
- ENVIRONMENTAL HEALTH OFFICER (AIR QUALITY) COMMENTS
- HIGH LANE VILLAGE NEIGHBOURHOOD FORUM COMMENTS
- MANCHESTER AIRPORT COMMENTS
- COAL AUTHORITY COMMENTS
- PRESS NOTICE
- DRAINAGE ENGINEER/LEAD LOCAL FLOOD AUTHORITY COMMENTS
- ENVIRONMENT AGENCY COMMENTS
- NETWORK RAIL COMMENTS
- GREATER MANCHESTER ARCHAEOLOGICAL ADVISORY SERVICE COMMENTS
- PUBLIC RIGHTS OF WAY OFFICER COMMENTS
- EMPLOYMENT WORKS AND SKILLS MANAGER COMMENTS
- ACCESS PLAN
- STAGE 1 ROAD SAFETY AUDIT
- ROAD SAFETY AUDIT - DESIGNERS RESPONSE
- EMPLOYMENT AND SKILLS PLAN
- PARAMETERS PLAN
- DESIGN AND ACCESS STATEMENT
- DRAINAGE MANAGEMENT STRATEGY
- BIODIVERSITY NET GAIN METRIC - MILL LANE
- BIODIVERSITY NET GAIN ASSESSMENT - MILL LANE
- PRELIMINARY ECOLOGICAL APPRAISAL REPORT
- FLOOD RISK ASSESSMENT
- LANDSCAPE AND VISUAL APPRAISAL
- ILLUSTRATIVE MASTERPLAN
- SITE LOCATION PLAN
- TRANSPORT STATEMENT
- CRIME IMPACT STATEMENT
- AIR QUALITY ASSESSMENT
- APPLICATION FORM MILL LANE.
- ARBORICULTURAL REPORT AND IMPACT ASSESSMENT
- COAL MINING RISK ASSESSMENT
- ENERGY AND CARBON STATEMENT OF INTENT
- TOPOGRAHICAL LAND SURVEY
- PLANNING STATEMENT
- HERITAGE DESK BASED ASSESSMENT AND PRELIMINARY HERITAGE STATEMENT
- DESKTOP UTILITY INFRASTRUCTURE RECORD SHEET
- NOISE AND VIBRATION IMPACT ASSESSMENT
- PHASE 1 GEO-ENVIRONMENTAL ASSESSMENT REPORT
- STATEMENT OF COMMUNITY INVOLVEMENT
- APPLICATION FORMS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided outline applications in a median of 70 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Outside 82 Cherry Tree Drive Hazel Grove Stockport SK7 6AS
Brsk Limited intends to install wooden telegraph poles in the Torkington area of the Stockport MBC area. ST-TOK-AG1 WP10
Granted Telecoms 3 docs -
158 Buxton Road Hazel Grove Stockport SK7 6AN
Brsk Limited intends to install wooden telegraph poles in the Torkington area NP:18-ST-TOK-AG1 WP18
Granted Telecoms 3 docs -
11A Capesthorne Road Hazel GroveStockport SK7 6BP
Single Storey side extension and front porch extension. New vehicle crossing onto Capesthorne Road.
Granted Householder Extension 8 docsSmall domestic -
Outside 70 Cherry Tree Drive Hazel Grove Stockport SK7 6AS
Brsk Limited intends to install wooden telegraph poles in the Torkington area of the Stockport MBC area. ST-TOK-AG1 WP09
Granted Telecoms 3 docs -
Land At Simpson Business Centre Buxton Road Hazel Grove Stockport SK7 6NA
95% historically approved · decision due ~26 May
Erection of up to 9 no. dwellinghouses (Permission in Principle Application).
Awaiting decision Outline 11 docsSeveral homes -
150 Buxton Road Hazel Grove Stockport SK7 6AN
Brsk Limited intends to install wooden telegraph poles in the Torkington area NP:17-ST-TOK-AG1 WP17
Granted Telecoms 3 docs
Other outline applications
In Stockport
-
DC/100057 Granted
Ajax Works Whitehill Street South Reddish Stockport SK4 1NT
PV solar installation 220x 'Hengdian group DMEG Magnetic Co Ltd' DM450M10RT-54HBB modules
-
DC/099921 Decided
65 - 83 St Petersgate Stockport SK1 1DS
EIA Screening Opinion - To determine whether the proposed redevelopment of the site at 65-83 St Petersgate, Stockport constitutes Environmental Impact Assessment (EIA) development.
-
DC/098795 Decided
Land At Hyde Bank Meadows Romiley Stockport
Request for Screening Opinion under the Town and Country Planning Environmental Impact Assessment Regulations 2017 (as amended) for an outline planning application with all matters reserved, except access for the development of up to 250 dwellings (Use Class C3) with associated access roads and provision of open spaces.
-
DC/099773 Decided
Vitality House 217 Wellington Road South Heaviley Stockport SK2 6NG
EIA Screening Opinion - The proposed development will seek permission for the demolition of the existing building and structures on site and redevelopment of the site with a residential apartment scheme comprising of up to a maximum of 290 dwellings, together with 45sqm of commercial space at ground floor.
-
DC/100207 Awaiting decision
Land At Crescent Road Crescent Road Cheadle
Stage 1 Permission in Principle (PIP) application for up to 7 no. dwellings