Planning application
Land At Upper Swinesye Farm Woodford Stockport
Works: New dwelling
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline planning application (with all matters reserved) for residential development with associated landscaping, sustainable urban drainage, and other infrastructure
As published by the council, reference DC/098620
Application record
- Reference
- DC/098620
- Type
- Outline Application
- Status
- Registered
- Received
- 20 Mar 2026
- Validated
- 13 May 2026
- Ward
- Brmhll Sth And Woodford (Bram)
Timeline
Dates from the published record
-
20 Mar 2026
Received by Stockport
-
13 May 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Savills (UK) Ltd Agent, registered in London
Active · incorporated 1991 · London
1,136 applications on PlanIndex · across 155 councils · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
147 documents on file for this application
- 17623_APPENDIX 11.1 METHODOLOGY
- 17623_R03B_BNG_REPORT
- 17623_APPENDIX 11.6 - ASSESSMENT OF VISUAL EFFECTS.
- 17623_APPENDIX 11.5 - ASSESSMENT OF LANDSCAPE EFFECTS
- 17623_SWINESEYE_BNG_V2
- 17623_SWINESEYE_CONDITION_ASSESSMENTS
- 17623_POST-DEV CONDITION_ASSESSMENTS
- ACCURATE VISUAL REPRESENTATIONS (AVR) PROPOSED DEVELOPMENT VISUALISATIONS
- APPENDIX 11.2
- APPENDIX 11.3
- APPENDIX 11.4
- APPENDIX_9.1A_17623_HABITATSREPORT_AUGUST 2026
- ES CHAPTER 11 LANDSCAPE AND VISUAL TG 18.08.2026
- FIGURE 11.1 17623_P01B_ZTV_AB_JJ
- FIGURE 11.3 17623_P06B_PUBLISHED LANDSCAPE CHARACTER CONTEXT
- FIGURE 11.4 17623_P04_PHOTOSHEETS_IJ_JJ
- FIGURE 11.5 - 17623_P07E_LANDSCAPE STRATEGY PLAN_JJ
- FIGURE 11.7 - 17623_P10A_BOUNDARY ANALYSIS PLAN
- FIGURE 11.6 - 17623_P09A_TOPOGRAPHY_IJ
- FIGURE 11.8 - 17623_P11A_SITE CONTAINMENT PLAN
- FIGURE 2 LANDSCAPE POLICY CONTEXT, DESIGNATIONS AND OTHER CONSIDERATIONS
- 7417_04A_HERITAGE_NOTE
- 7417_01E_DBA
- RESPONSE TO LLFA
- DESIGN AND ACCESS STATEMENT
- TFGM
- ADDITIONAL HIGHWAY REPORT (STOCKPORT)
- ADDITIONAL HIGHWAY REPORT (TFGM)
- ENVIRONMENTAL HEALTH - ENVIRONMENTAL QUALITY
- ECOLOGY
- ENVIRONMENTAL HEALTH - CONTAMINATION
- DRAINAGE
- PRESS NOTICE
- PROW
- ENVIRONMENT AGENCY
- CONSERVATION OFFICER
- MANCHESTER AIRPORT
- TFGM
- NATURAL ENGLAND
- UNITED UTILITIES
- WNF RESPONSE
- GMAAS
- PRESS NOTICE
- RECYCLING
- PROW
- ES APPENDIX 7.1 TRANSPORT ASSESSMENT
- STAGE 1 ROAD SAFETY AUDIT
- RSA - DESIGNERS RESPONSE
- 7417_103_B_SITE LOCATION PLAN
- 7417_105_E PARAMETERS PLAN.
- 7417_108_D ILLUSTRATIVE MASTERPLAN.
- 7417_107_E DENSITY PARAMETERS PLAN
- ES APPENDIX 7.2 FRAMEWORK TRAVEL PLAN
- 7417_106_E BUILDING HEIGHTS PARAMETERS PLAN.
- 7417_104_H DEVELOPMENT FRAMEWORK PLAN
- ES APPENDIX 7.1 TRANSPORT ASSESSMENT
- 7417_02_F_DESIGN AND ACCESS STATEMENT
- BNG REPORT
- BNG STATEMENT FORM
- BNG METRIC
- BNG CONDITIONS ASSESSMENT
- BNG POST DEVELOPMENT CONDITIONS ASSESSMENT
- APPLICATIONFORMREDACTED
- ES CHAPTER 10 FLOOD RISK AND DRAINAGE
- ES CHAPTER 11 LANDSCAPE AND VISUAL
- ES CHAPTER 12 SOCIOECONOMICS AND HEALTH
- ES CHAPTER 13 GROUND CONDITIONS AND SOILS
- ES CHAPTER 14 NOISE AND VIBRATION
- ES CHAPTER 15 SUMMARY OF MITIGATION RESIDUAL AND INTERACTION EFFECTS
- ES CHAPTER 2 SITE AND LOCAL CONTEXT
- ES CHAPTER 3 PROPOSED DEVELOPMENT
- ES CHAPTER 4 CONSULTATION ALTERNATIVES AND DESIGN EVOLUTION
- ES CHAPTER 5 APPROACH TO ASSESSMENT
- ES CHAPTER 6 PLANNING POLICY CONTEXT
- ES CHAPTER 7 TRANSPORT AND ACCESS
- ES CHAPTER 8 AIR QUALITY
- ES CHAPTER 9 ECOLOGY
- ES COVER AND CONTENTS AND CHAPTER 1 INTRODUCTION
- ES FIGURE 14.3 ROTARY BORING ZONES
- ES FIGURE 14.2 BASELINE NOISE SURVEY LOCATIONS
- ES FIGURE 14.1 EXISTING SENSITIVE RECEPTOR LOCATIONS
- ES FIGURE 12.5 POPULATION PROJECTIONS 2041
- ES FIGURE 12.4 POPULATION PROJECTIONS 2032
- ES FIGURE 12.3 SMBC SECONDARY SCHOOL PLANNING AREAS
- ES FIGURE 12.2 SMBC PRIMARY SCHOOL PLANNING AREAS
- ES FIGURE 11.8 SITE CONTAINMENT PLAN
- ES FIGURE 11.7 BOUNDARY ANALYSIS PLAN
- ES FIGURE 11.6 TOPOGRAPHY
- ES FIGURE 11.3 PUBLISHED LANDSCAPE CHARACTER CONTEXT
- ES FIGURE 11.2 LANDSCAPE POLICY CONTEXT DESIGNATIONS AND OTHER CONSIDERATIONS
- ES FIGURE 11.1 ZTV
- ES FIGURE 9.4 GCN SURVEY RESULTS
- ES FIGURE 9.3 BREEDING BIRD SURVEY RESULTS
- ES FIGURE 9.2 BAT SURVEY RESULTS
- ES FIGURE 9.1 HABITAT FEATURES PLAN
- ES FIGURE 3.4 DENSITY PLAN
- ES FIGURE 3.3 BUILDING HEIGHTS
- ES FIGURE 3.2 PARAMETERS PLAN
- ES FIGURE 1.1 SITE LOCATION PLAN
- ES APPENDIX 1.1 ASSESSOR INFORMATION
- ES APPENDIX 1.2 GLOSSARY OF TERMS
- ES APPENDIX 5.1 HERITAGE AND ARCHAEOLOGY DESK BASED ASSESSMENT
- ES APPENDIX 7.2 FRAMEWORK TRAVEL PLAN
- ES APPENDIX 8.1 LEGISLATION POLICY AND GUIDANCE
- ES APPENDIX 8.2 METHODOLOGY
- ES APPENDIX 8.3 AIR QUALITY ASSESSMENT RESULTS
- ES APPENDIX 8.4 CORRESPONDENCE
- ES APPENDIX 9.1 HABITATS REPORT
- ES APPENDIX 9.2 BAT REPORT
- ES APPENDIX 9.3 BREEDING BIRDS REPORT
- ES APPENDIX 9.4 GCN REPORT
- ES APPENDIX 11.1 METHODOLOGY
- ES APPENDIX 11.2 EXTRACT FROM THE GMLCS
- ES APPENDIX 11.3 PUBLISHED LANDSCAPE CHARACTER CONTEXT
- ES APPENDIX 11.5 ASSESSMENT OF LANDSCAPE EFFECTS
- ES APPENDIX 11.6 ASSESSMENT OF VISUAL EFFECTS
- ES APPENDIX 14.2 CONSTRUCTION NOISE PLANT LIST
- ES APPENDIX 14.3 AAWT NOISE TRAFFIC FLOWS
- ES APPENDIX 7.1 TRANSPORT ASSESSMENT
- ES APPENDIX 10.2 DRAINAGE MANAGEMENT STRATEGY_COMPRESSED
- ES APPENDIX 10.1 FLOOD RISK ASSESSMENT_COMPRESSED
- BUILDING HEIGHTS PARAMETERS PLAN
- DENSITY PARAMETERS PLAN
- PARAMETERS PLAN
- TOPO OVERALL
- TOPO PART 1
- TOPO PART 2
- TOPO PART 3
- STATEMENT OF COMMUNITY INVOLVEMENT
- CRIME IMPACT STATEMENT
- AGRICULTURAL LAND REPORT
- ARCHAEOLOGY AND HERITAGE DBA
- ES APPENDIX 11.4 EXTRACT FROM THE CHESHIRE EAST LANDSCAPE CHARACTER ASSESSMENT H
- BNG STATEMENT FORM
- ENERGY AND SUSTAINABILITY REPORT (3)
- 7417_02_E_DESIGN AND ACCESS STATEMENT_REDUCED_PART1 1
- 7417_02_E_DESIGN AND ACCESS STATEMENT_REDUCED_PART2
- 7417_02_E_DESIGN AND ACCESS STATEMENT_REDUCED_PART3
- 7417_103_A_SITE LOCATION PLAN
- 7417_104_G-DEVELOPMENT FRAMEWORK PLAN
- ES FIGURE 3.1 ILLUSTRATIVE MASTERPLAN (1)
- ILLUSTRATIVE MASTERPLAN
- 17623_R02C_PRELIMINARY ARBORICULTURAL IMPACT ASSESSMENT_02032026_TC_BV
- ARBORICULTURAL IMPACT ASSESSMENT (1)
- 17623_R03A_BNG_REPORT_BP_MARCH 2026_COMPRESSED
- PLANNING STATEMENT V4 FINAL
- UPPER SWINESEYE - COVER LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided outline applications in a median of 70 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Rose Cottage 3 Bridle Way Woodford Stockport SK7 1QL
A Single Storey Side & Rear Extension
Refused Householder Extension 8 docsSmall domestic -
Windyridge 65 Bridle Road Woodford Stockport SK7 1QN
Discharge of Condition 11 (Electric Vehicle Charging Point) of planning permission DC073788 Plans - detailing proposed location of charging points Electric charging point specification sheets
Granted Conditions 2 docs -
Rosanne 72 Bridle Road Woodford Stockport SK7 1QN
Discharge of Conditions 2 (materials), 5 (landscaping), 7 (enclosures), 8 (SUDS), 9 (CMS), 11 (access) and 13 (driveway) of DC/072337
Granted Conditions 3 docs -
Bridle Road Woodford Stockport
Erection of two detached dwellings with associated access and landscaping (amended plans)
Refused Full applications 34 docs -
21 Bridle Road Woodford Stockport SK7 1QH
Provision of an additional storey above the original roof increasing the height by 3m.
Withdrawn 5 docs -
21 Bridle Road Woodford Stockport SK7 1QH
Single storey extension to rear bedroom forming rear dormers and increasing ridge height.
Granted Householder Extension Loft or dormer +1 8 docsSmall domestic
Other outline applications
In Stockport
-
DC/100057 Granted
Ajax Works Whitehill Street South Reddish Stockport SK4 1NT
PV solar installation 220x 'Hengdian group DMEG Magnetic Co Ltd' DM450M10RT-54HBB modules
-
DC/099921 Decided
65 - 83 St Petersgate Stockport SK1 1DS
EIA Screening Opinion - To determine whether the proposed redevelopment of the site at 65-83 St Petersgate, Stockport constitutes Environmental Impact Assessment (EIA) development.
-
DC/098795 Decided
Land At Hyde Bank Meadows Romiley Stockport
Request for Screening Opinion under the Town and Country Planning Environmental Impact Assessment Regulations 2017 (as amended) for an outline planning application with all matters reserved, except access for the development of up to 250 dwellings (Use Class C3) with associated access roads and provision of open spaces.
-
DC/099773 Decided
Vitality House 217 Wellington Road South Heaviley Stockport SK2 6NG
EIA Screening Opinion - The proposed development will seek permission for the demolition of the existing building and structures on site and redevelopment of the site with a residential apartment scheme comprising of up to a maximum of 290 dwellings, together with 45sqm of commercial space at ground floor.
-
DC/100207 Awaiting decision
Land At Crescent Road Crescent Road Cheadle
Stage 1 Permission in Principle (PIP) application for up to 7 no. dwellings