Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Upper Swinesye Farm Woodford Stockport

Awaiting decision Stockport DC/098620 Outline Application

Works: New dwelling

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Outline planning application (with all matters reserved) for residential development with associated landscaping, sustainable urban drainage, and other infrastructure

As published by the council, reference DC/098620

Application record

Reference
DC/098620
Type
Outline Application
Status
Registered
Received
20 Mar 2026
Validated
13 May 2026
Ward
Brmhll Sth And Woodford (Bram)

Timeline

Dates from the published record

  1. 20 Mar 2026

    Received by Stockport

  2. 13 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stockport took a median of 51 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Savills (UK) Ltd Agent, registered in London

Active · incorporated 1991 · London

1,136 applications on PlanIndex · across 155 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

147 documents on file for this application

  • 17623_APPENDIX 11.1 METHODOLOGY Report · 26 Aug 2026
  • 17623_R03B_BNG_REPORT Report · 26 Aug 2026
  • 17623_APPENDIX 11.6 - ASSESSMENT OF VISUAL EFFECTS. Report · 26 Aug 2026
  • 17623_APPENDIX 11.5 - ASSESSMENT OF LANDSCAPE EFFECTS Report · 26 Aug 2026
  • 17623_SWINESEYE_BNG_V2 Report · 26 Aug 2026
  • 17623_SWINESEYE_CONDITION_ASSESSMENTS Report · 26 Aug 2026
  • 17623_POST-DEV CONDITION_ASSESSMENTS Report · 26 Aug 2026
  • ACCURATE VISUAL REPRESENTATIONS (AVR) PROPOSED DEVELOPMENT VISUALISATIONS Report · 26 Aug 2026
  • APPENDIX 11.2 Report · 26 Aug 2026
  • APPENDIX 11.3 Report · 26 Aug 2026
  • APPENDIX 11.4 Report · 26 Aug 2026
  • APPENDIX_9.1A_17623_HABITATSREPORT_AUGUST 2026 Report · 26 Aug 2026
  • ES CHAPTER 11 LANDSCAPE AND VISUAL TG 18.08.2026 Report · 26 Aug 2026
  • FIGURE 11.1 17623_P01B_ZTV_AB_JJ Report · 26 Aug 2026
  • FIGURE 11.3 17623_P06B_PUBLISHED LANDSCAPE CHARACTER CONTEXT Report · 26 Aug 2026
  • FIGURE 11.4 17623_P04_PHOTOSHEETS_IJ_JJ Report · 26 Aug 2026
  • FIGURE 11.5 - 17623_P07E_LANDSCAPE STRATEGY PLAN_JJ Report · 26 Aug 2026
  • FIGURE 11.7 - 17623_P10A_BOUNDARY ANALYSIS PLAN Report · 26 Aug 2026
  • FIGURE 11.6 - 17623_P09A_TOPOGRAPHY_IJ Report · 26 Aug 2026
  • FIGURE 11.8 - 17623_P11A_SITE CONTAINMENT PLAN Report · 26 Aug 2026
  • FIGURE 2 LANDSCAPE POLICY CONTEXT, DESIGNATIONS AND OTHER CONSIDERATIONS Report · 26 Aug 2026
  • 7417_04A_HERITAGE_NOTE Report · 26 Aug 2026
  • 7417_01E_DBA Report · 26 Aug 2026
  • RESPONSE TO LLFA Report · 20 Aug 2026
  • DESIGN AND ACCESS STATEMENT Report · 20 Aug 2026
  • TFGM Consultee Comment · 11 Aug 2026
  • ADDITIONAL HIGHWAY REPORT (STOCKPORT) Report · 03 Aug 2026
  • ADDITIONAL HIGHWAY REPORT (TFGM) Report · 03 Aug 2026
  • ENVIRONMENTAL HEALTH - ENVIRONMENTAL QUALITY Consultee Comment · 17 Jul 2026
  • ECOLOGY Consultee Comment · 03 Jul 2026
  • ENVIRONMENTAL HEALTH - CONTAMINATION Consultee Comment · 23 Jun 2026
  • DRAINAGE Consultee Comment · 18 Jun 2026
  • PRESS NOTICE Notice · 17 Jun 2026
  • PROW Consultee Comment · 15 Jun 2026
  • ENVIRONMENT AGENCY Consultee Comment · 15 Jun 2026
  • CONSERVATION OFFICER Consultee Comment · 15 Jun 2026
  • MANCHESTER AIRPORT Consultee Comment · 12 Jun 2026
  • TFGM Consultee Comment · 12 Jun 2026
  • NATURAL ENGLAND Consultee Comment · 09 Jun 2026
  • UNITED UTILITIES Consultee Comment · 09 Jun 2026
  • WNF RESPONSE Consultee Comment · 05 Jun 2026
  • GMAAS Consultee Comment · 03 Jun 2026
  • PRESS NOTICE Notice · 03 Jun 2026
  • RECYCLING Consultee Comment · 22 May 2026
  • PROW Consultee Comment · 22 May 2026
  • ES APPENDIX 7.1 TRANSPORT ASSESSMENT Report · 15 May 2026
  • STAGE 1 ROAD SAFETY AUDIT Report · 13 May 2026
  • RSA - DESIGNERS RESPONSE Report · 13 May 2026
  • 7417_103_B_SITE LOCATION PLAN 1250 Plan · 22 Apr 2026
  • 7417_105_E PARAMETERS PLAN. Plan · 22 Apr 2026
  • 7417_108_D ILLUSTRATIVE MASTERPLAN. Plan · 22 Apr 2026
  • 7417_107_E DENSITY PARAMETERS PLAN Plan · 22 Apr 2026
  • ES APPENDIX 7.2 FRAMEWORK TRAVEL PLAN Report · 22 Apr 2026
  • 7417_106_E BUILDING HEIGHTS PARAMETERS PLAN. Plan · 22 Apr 2026
  • 7417_104_H DEVELOPMENT FRAMEWORK PLAN Plan · 22 Apr 2026
  • ES APPENDIX 7.1 TRANSPORT ASSESSMENT Superseded Document · 22 Apr 2026
  • 7417_02_F_DESIGN AND ACCESS STATEMENT Report · 22 Apr 2026
  • BNG REPORT BNG Statement · 08 Apr 2026
  • BNG STATEMENT FORM BNG Statement · 08 Apr 2026
  • BNG METRIC BNG Stat Bio Metric (COMPLETE) · 01 Apr 2026
  • BNG CONDITIONS ASSESSMENT BNG Statement · 01 Apr 2026
  • BNG POST DEVELOPMENT CONDITIONS ASSESSMENT BNG Statement · 01 Apr 2026
  • APPLICATIONFORMREDACTED ApplicationNoPersonalData · 20 Mar 2026
  • ES CHAPTER 10 FLOOD RISK AND DRAINAGE Report · 20 Mar 2026
  • ES CHAPTER 11 LANDSCAPE AND VISUAL Report · 20 Mar 2026
  • ES CHAPTER 12 SOCIOECONOMICS AND HEALTH Report · 20 Mar 2026
  • ES CHAPTER 13 GROUND CONDITIONS AND SOILS Report · 20 Mar 2026
  • ES CHAPTER 14 NOISE AND VIBRATION Report · 20 Mar 2026
  • ES CHAPTER 15 SUMMARY OF MITIGATION RESIDUAL AND INTERACTION EFFECTS Report · 20 Mar 2026
  • ES CHAPTER 2 SITE AND LOCAL CONTEXT Report · 20 Mar 2026
  • ES CHAPTER 3 PROPOSED DEVELOPMENT Report · 20 Mar 2026
  • ES CHAPTER 4 CONSULTATION ALTERNATIVES AND DESIGN EVOLUTION Report · 20 Mar 2026
  • ES CHAPTER 5 APPROACH TO ASSESSMENT Report · 20 Mar 2026
  • ES CHAPTER 6 PLANNING POLICY CONTEXT Report · 20 Mar 2026
  • ES CHAPTER 7 TRANSPORT AND ACCESS Report · 20 Mar 2026
  • ES CHAPTER 8 AIR QUALITY Report · 20 Mar 2026
  • ES CHAPTER 9 ECOLOGY Report · 20 Mar 2026
  • ES COVER AND CONTENTS AND CHAPTER 1 INTRODUCTION Report · 20 Mar 2026
  • ES FIGURE 14.3 ROTARY BORING ZONES Plan · 20 Mar 2026
  • ES FIGURE 14.2 BASELINE NOISE SURVEY LOCATIONS Plan · 20 Mar 2026
  • ES FIGURE 14.1 EXISTING SENSITIVE RECEPTOR LOCATIONS Plan · 20 Mar 2026
  • ES FIGURE 12.5 POPULATION PROJECTIONS 2041 Plan · 20 Mar 2026
  • ES FIGURE 12.4 POPULATION PROJECTIONS 2032 Plan · 20 Mar 2026
  • ES FIGURE 12.3 SMBC SECONDARY SCHOOL PLANNING AREAS Plan · 20 Mar 2026
  • ES FIGURE 12.2 SMBC PRIMARY SCHOOL PLANNING AREAS Plan · 20 Mar 2026
  • ES FIGURE 11.8 SITE CONTAINMENT PLAN Plan · 20 Mar 2026
  • ES FIGURE 11.7 BOUNDARY ANALYSIS PLAN Plan · 20 Mar 2026
  • ES FIGURE 11.6 TOPOGRAPHY Plan · 20 Mar 2026
  • ES FIGURE 11.3 PUBLISHED LANDSCAPE CHARACTER CONTEXT Plan · 20 Mar 2026
  • ES FIGURE 11.2 LANDSCAPE POLICY CONTEXT DESIGNATIONS AND OTHER CONSIDERATIONS Plan · 20 Mar 2026
  • ES FIGURE 11.1 ZTV Plan · 20 Mar 2026
  • ES FIGURE 9.4 GCN SURVEY RESULTS Plan · 20 Mar 2026
  • ES FIGURE 9.3 BREEDING BIRD SURVEY RESULTS Plan · 20 Mar 2026
  • ES FIGURE 9.2 BAT SURVEY RESULTS Plan · 20 Mar 2026
  • ES FIGURE 9.1 HABITAT FEATURES PLAN Plan · 20 Mar 2026
  • ES FIGURE 3.4 DENSITY PLAN Plan · 20 Mar 2026
  • ES FIGURE 3.3 BUILDING HEIGHTS Plan · 20 Mar 2026
  • ES FIGURE 3.2 PARAMETERS PLAN Plan · 20 Mar 2026
  • ES FIGURE 1.1 SITE LOCATION PLAN Plan · 20 Mar 2026
  • ES APPENDIX 1.1 ASSESSOR INFORMATION Report · 20 Mar 2026
  • ES APPENDIX 1.2 GLOSSARY OF TERMS Report · 20 Mar 2026
  • ES APPENDIX 5.1 HERITAGE AND ARCHAEOLOGY DESK BASED ASSESSMENT Report · 20 Mar 2026
  • ES APPENDIX 7.2 FRAMEWORK TRAVEL PLAN Superseded Document · 20 Mar 2026
  • ES APPENDIX 8.1 LEGISLATION POLICY AND GUIDANCE Report · 20 Mar 2026
  • ES APPENDIX 8.2 METHODOLOGY Report · 20 Mar 2026
  • ES APPENDIX 8.3 AIR QUALITY ASSESSMENT RESULTS Report · 20 Mar 2026
  • ES APPENDIX 8.4 CORRESPONDENCE Report · 20 Mar 2026
  • ES APPENDIX 9.1 HABITATS REPORT Report · 20 Mar 2026
  • ES APPENDIX 9.2 BAT REPORT Report · 20 Mar 2026
  • ES APPENDIX 9.3 BREEDING BIRDS REPORT Report · 20 Mar 2026
  • ES APPENDIX 9.4 GCN REPORT Report · 20 Mar 2026
  • ES APPENDIX 11.1 METHODOLOGY Report · 20 Mar 2026
  • ES APPENDIX 11.2 EXTRACT FROM THE GMLCS Report · 20 Mar 2026
  • ES APPENDIX 11.3 PUBLISHED LANDSCAPE CHARACTER CONTEXT Report · 20 Mar 2026
  • ES APPENDIX 11.5 ASSESSMENT OF LANDSCAPE EFFECTS Report · 20 Mar 2026
  • ES APPENDIX 11.6 ASSESSMENT OF VISUAL EFFECTS Report · 20 Mar 2026
  • ES APPENDIX 14.2 CONSTRUCTION NOISE PLANT LIST Report · 20 Mar 2026
  • ES APPENDIX 14.3 AAWT NOISE TRAFFIC FLOWS Report · 20 Mar 2026
  • ES APPENDIX 7.1 TRANSPORT ASSESSMENT Superseded Document · 20 Mar 2026
  • ES APPENDIX 10.2 DRAINAGE MANAGEMENT STRATEGY_COMPRESSED Report · 20 Mar 2026
  • ES APPENDIX 10.1 FLOOD RISK ASSESSMENT_COMPRESSED Report · 20 Mar 2026
  • BUILDING HEIGHTS PARAMETERS PLAN Superseded Document · 20 Mar 2026
  • DENSITY PARAMETERS PLAN Superseded Document · 20 Mar 2026
  • PARAMETERS PLAN Superseded Document · 20 Mar 2026
  • TOPO OVERALL Plan · 20 Mar 2026
  • TOPO PART 1 Plan · 20 Mar 2026
  • TOPO PART 2 Plan · 20 Mar 2026
  • TOPO PART 3 Plan · 20 Mar 2026
  • STATEMENT OF COMMUNITY INVOLVEMENT Report · 20 Mar 2026
  • CRIME IMPACT STATEMENT Report · 20 Mar 2026
  • AGRICULTURAL LAND REPORT Report · 20 Mar 2026
  • ARCHAEOLOGY AND HERITAGE DBA Report · 20 Mar 2026
  • ES APPENDIX 11.4 EXTRACT FROM THE CHESHIRE EAST LANDSCAPE CHARACTER ASSESSMENT H Report · 20 Mar 2026
  • BNG STATEMENT FORM Report · 20 Mar 2026
  • ENERGY AND SUSTAINABILITY REPORT (3) Report · 20 Mar 2026
  • 7417_02_E_DESIGN AND ACCESS STATEMENT_REDUCED_PART1 1 Report · 20 Mar 2026
  • 7417_02_E_DESIGN AND ACCESS STATEMENT_REDUCED_PART2 Report · 20 Mar 2026
  • 7417_02_E_DESIGN AND ACCESS STATEMENT_REDUCED_PART3 Report · 20 Mar 2026
  • 7417_103_A_SITE LOCATION PLAN Superseded Document · 20 Mar 2026
  • 7417_104_G-DEVELOPMENT FRAMEWORK PLAN Superseded Document · 20 Mar 2026
  • ES FIGURE 3.1 ILLUSTRATIVE MASTERPLAN (1) Plan · 20 Mar 2026
  • ILLUSTRATIVE MASTERPLAN Superseded Document · 20 Mar 2026
  • 17623_R02C_PRELIMINARY ARBORICULTURAL IMPACT ASSESSMENT_02032026_TC_BV Report · 20 Mar 2026
  • ARBORICULTURAL IMPACT ASSESSMENT (1) Report · 20 Mar 2026
  • 17623_R03A_BNG_REPORT_BP_MARCH 2026_COMPRESSED Report · 20 Mar 2026
  • PLANNING STATEMENT V4 FINAL Report · 20 Mar 2026
  • UPPER SWINESEYE - COVER LETTER Report · 20 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided outline applications in a median of 70 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Rose Cottage 3 Bridle Way Woodford Stockport SK7 1QL

    DC/080620 Submitted 8 Apr 2021 200 yards away

    A Single Storey Side & Rear Extension

    Refused Householder Extension 8 docs
    Small domestic
  • Windyridge 65 Bridle Road Woodford Stockport SK7 1QN

    DC/080345 Submitted 22 Mar 2021 300 yards away

    Discharge of Condition 11 (Electric Vehicle Charging Point) of planning permission DC073788 Plans - detailing proposed location of charging points Electric charging point specification sheets

    Granted Conditions 2 docs
  • Rosanne 72 Bridle Road Woodford Stockport SK7 1QN

    DC/078094 Submitted 17 Sep 2020 300 yards away

    Discharge of Conditions 2 (materials), 5 (landscaping), 7 (enclosures), 8 (SUDS), 9 (CMS), 11 (access) and 13 (driveway) of DC/072337

    Granted Conditions 3 docs
  • Bridle Road Woodford Stockport

    DC/084618 Submitted 14 Mar 2022 300 yards away

    Erection of two detached dwellings with associated access and landscaping (amended plans)

    Refused Full applications 34 docs
  • 21 Bridle Road Woodford Stockport SK7 1QH

    DC/080608 Submitted 8 Apr 2021 350 yards away

    Provision of an additional storey above the original roof increasing the height by 3m.

    Withdrawn 5 docs
  • 21 Bridle Road Woodford Stockport SK7 1QH

    DC/079242 Submitted 24 Dec 2020 350 yards away

    Single storey extension to rear bedroom forming rear dormers and increasing ridge height.

    Granted Householder Extension Loft or dormer +1 8 docs
    Small domestic

In Stockport

  • DC/100057 Granted

    Ajax Works Whitehill Street South Reddish Stockport SK4 1NT

    PV solar installation 220x 'Hengdian group DMEG Magnetic Co Ltd' DM450M10RT-54HBB modules

    Received 27 Aug, published by the council 9 Sep 2026 Outline
  • DC/099921 Decided

    65 - 83 St Petersgate Stockport SK1 1DS

    EIA Screening Opinion - To determine whether the proposed redevelopment of the site at 65-83 St Petersgate, Stockport constitutes Environmental Impact Assessment (EIA) development.

    Received 14 Aug, published by the council 24 Aug 2026 Outline
  • DC/098795 Decided

    Land At Hyde Bank Meadows Romiley Stockport

    Request for Screening Opinion under the Town and Country Planning Environmental Impact Assessment Regulations 2017 (as amended) for an outline planning application with all matters reserved, except access for the development of up to 250 dwellings (Use Class C3) with associated access roads and provision of open spaces.

    Received 2 Apr, published by the council 21 Jul 2026 Outline
  • DC/099773 Decided

    Vitality House 217 Wellington Road South Heaviley Stockport SK2 6NG

    EIA Screening Opinion - The proposed development will seek permission for the demolition of the existing building and structures on site and redevelopment of the site with a residential apartment scheme comprising of up to a maximum of 290 dwellings, together with 45sqm of commercial space at ground floor.

    Received 17 Jul, published by the council 13 Aug 2026 Outline
  • DC/100207 Awaiting decision

    Land At Crescent Road Crescent Road Cheadle

    Stage 1 Permission in Principle (PIP) application for up to 7 no. dwellings

    Received 15 Sep, published by the council 6 Oct 2026 Outline