Planning application
Land Northeast Of Bredbury Industrial Estate Off Bredbury Park Way / Ashton Road (A6017), Bredbury, Stockport SK6 2SB; Referred To As Bredbury Gateway
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Part A: Detailed planning permission for construction, engineering and change of use including; realignment of Bredbury Park Way and relocation of its junction with Ashton Road, means of access and related transportation infrastructure; remodelling/regrading of land, related engineering and infrastructure works; landscaping, tree planting and related works; green components of wider SUDS drainage strategy; main means of enclosure/security; general enabling works and ancillary development; and change of use Finland Park Farm (Uses Classes E(b), F1 or F2); AND, Part B: Outline planning permission with all matters reserved except means of access for commercial / industrial / warehousing development providing up to 70,310 sqm of floorspace (including ancillary office accommodation) in Use Classes E(g)(iii), B2 and B8; along with associated infrastructure (including means of plot / unit enclosure, internal access and service roads, parking, servicing, footpaths, landscaping, built infrastructure components of wider SUDS drainage strategy and ancillary works)
As published by the council, reference DC/097903
Application record
- Reference
- DC/097903
- Type
- Outline Application
- Status
- Registered
- Received
- 19 Dec 2025
- Validated
- 2 Mar 2026
- Ward
- Bredbury & Woodley (Wern)
- Postcode
- SK6 2SB
Timeline
Dates from the published record
-
19 Dec 2025
Received by Stockport
-
2 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Plan Red Ltd Agent, registered in Manchester
Active · incorporated 2021 · Manchester
34 applications on PlanIndex · across 8 councils · 80% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
213 documents on file for this application
- NATIONAL HIGHWAYS
- DRAINAGE_STRATEGY-2_OF_2_
- DRAINAGE_STRATEGY-1_OF_2_
- GMEU
- LLFA RESPONSE - REV A.
- EXTERNAL LIGHTING LAYOUT 2OF2 (C5).PDF
- EXTERNAL LIGHTING LAYOUT 1OF2 (C5).PDF
- DRAINAGE STRATEGY-2 OF 2 P06.PDF
- DRAINAGE STRATEGY-1 OF 2 P06.PDF
- CULTURAL HERITAGE AND ARCHAEOLOGY TECHNICAL NOTE 10861.005.PDF
- EXTERNAL LIGHTING CALCULATION L-250011 R07 ARTECH.PDF
- CIBSE GUIDE AGAINST DESIGN RESULTS R07 ARTECH.PDF
- LETTER SUBMISSION RESPONSES TO SMBC.
- 9891.02.001 BREDBURY - PWMS
- 1244_02-005_PROPOSED SITE PLAN-P11
- 9891.02.003 BREDBURY, BAT AND BIRD BOX SCHEME.
- ENVIRONMENTAL HEALTH - AIR QUALITY
- ARCHAEOLOGICAL EVALUATION
- GMAAS
- CONSERVATION
- UNITED UILITIES
- TRANSPORT ASSESSMENT REVIEW
- NATIONAL HIGHWAYS
- TFGM
- ENVIRONMENTAL HEALTH - ENVIRONMENTAL QUALITY
- GMEU
- ECOLOGY
- TRANSPORT ASSESSMENT APPENDICES
- NATIONAL HIGHWAYS
- GMAAS
- TAMESIDE GOV
- PLANNING POLICY (GROWTH)
- NATURAL ENGLAND
- PRESS NOTICE
- COAL AUTHORITY
- LLFA / FLOOD RISK OFFICER
- ENVIRONMENT AGENCY
- PROW
- BREDBURY GATEWAY FI030-006 V3 PROW STRATEGY
- AIR QUALITY ASSESSMENT INPUT DATA
- SUSTAINABILITY ENERGY AND CLIMATE STATEMENT
- SUSTAINABILITY, ENERGY AND CLIMATE CHANGE REPORT
- BIODIVERSITY NET GAIN SUPPORT DETAILS
- SEQUENTIAL TEST NOTE
- PROPOSED BOUNDARY FENCING
- PROPOSED SITE SECTIONS
- FINLAND PARK FARM BUNGALOW EXISTING PLANS AND ELEVATIONS
- FINLAND PARK FARM STABLES EXISTING ELEVATIONS
- FINLAND PARK FARM EXISTING SITE PLAN AND ELEVATION
- PROPOSED ACCESS AND ASHTON ROAD SIGNALISATION
- PROPOSED ACCESS AND ASHTON ROAD SIGNALISATION
- APPLICATIONFORMREDACTED
- ES_VOLUME 3_FIGURE 9.17_POND LOCATION PLAN
- ES_VOLUME 3_FIGURE 9.18_ARBORICULTURAL SITE OVERVIEW PLAN
- ES_VOLUME 3_FIGURE 9.19_TREE CONSTRAINTS PLAN
- ES_VOLUME 3_FIGURE 9.20_TREE WORKS PLAN (KNOWN EFFECTS)
- ES_VOLUME 3_FIGURE 9.21_ARBORICULTURAL METHOD STATEMENT HEADS OF TERMS PLAN (KNO
- ES_VOLUME 3_FIGURE 9.22_BASELINE UK HABITATS
- ES_VOLUME 3_FIGURE 9.23_BASELINE CONDITION AND SIGNIFICANCE
- ES_VOLUME 3_FIGURE 9.24_PROPOSED UK HABITATS
- ES_VOLUME 3_FIGURE 9.25_PROPOSED HABITAT CONDITION - STRATEGIC SIGNIFICANCE
- ES_VOLUME 3_FIGURE 9.26_HABITAT IMPACT
- ES_VOLUME 3_FIGURE 15.1_LOCATION OF KNOWN HERITAGE ASSETS
- ES_VOLUME 3_FIGURE 15.2_ORDNANCE SURVEY MAP 1872
- ES_VOLUME 3_FIGURE 15.3_TERRAIN PLAN
- ES_VOLUME 3_FIGURE 15.4_HISTORIC LANDSCAPE CHARACTERISATION
- ES_VOLUME 3_FIGURE 15.5_IMPORTANT HEDGEROW LOCATION PLAN
- ES_VOLUME 3_FIGURE 15.6_BEDROCK GEOLOGY
- ES_VOLUME 3_FIGURE 15.7_SUPERFICIAL GEOLOGY
- ES_VOLUME 3_FIGURES 12.1 TO 12.4_NOISE AND VIBRATION
- ES VOLUME 3_DRAWING 10.1 SENSITIVE RECEPTOR LOCATION PLAN
- ES VOLUME 3_DRAWING 16.1_EXTERNAL LIGHTING LAYOUT ILLUMINANCE INFORMATION
- ES VOLUME 3_DRAWING 16.2_EXTERNAL LUX LIGHTING PLOT LAYOUTS
- ES VOLUME 3_DRAWING_DEVELOPMENT FRAMEWORK PLAN_EXISTING-P10
- ES VOLUME 3_DRAWING_DEVELOPMENT FRAMEWORK PLAN_PROPOSED-P10
- ES VOLUME 3_DRAWING_EXISTING SITE PLAN-P8
- ES VOLUME 3_DRAWING_OUTLINE AND DETAILED PERMISSION EXTENTS-P4
- ES VOLUME 3_DRAWING_P11-DEVELOPMENT STRATEGY PLAN
- ES VOLUME 3_DRAWING_PROPOSED CUT AND FILL
- ES VOLUME 3_DRAWING_PROPOSED FINISHED LEVELS 1OF2
- ES VOLUME 3_DRAWING_PROPOSED FINISHED LEVELS 2OF2
- ES VOLUME 3_DRAWING_PROPOSED SITE PLAN-P10
- ES VOLUME 3_SITE LOCATION PLAN-REV_P7
- ES_VOLUME 3_DRAWING 8.1_ ILLUSTRATIVE LANDSCAPE MASTERPLAN (SITE ONLY)
- ES_VOLUME 3_DRAWING 8.2_ILLUSTRATIVE LANDSCAPE MASTERPLAN (INCLUDING OFF SITE AR
- ES_VOLUME 3_DRAWING 11.1_ADMS-ROADS INPUTS
- ES_VOLUME 3_DRAWING 11.2_MONITORING LOCATIONS
- ES_VOLUME 3_DRAWING 11.3_OPERATIONAL PHASE SENSITIVE RECEPTOR
- ES_VOLUME 3_DRAWING 11.4_WIND ROSE OF 2023 MANCHESTER AIRPORT
- ES_VOLUME 3_DRAWING 14-1_SURFACE WATER ENVIRONMENT BASELINE CONDITIONS_REVISION
- ES_VOLUME 3_DRAWING 14-2_DRAINAGE STRATEGY-1 OF 2
- ES_VOLUME 3_DRAWING 14-3_DRAINAGE STRATEGY-2 OF 2
- ES_VOLUME 3_DRAWING 16.1_EXTERNAL LIGHTING LAYOUT 1 OF 2
- ES_VOLUME 3_DRAWING 16.1_EXTERNAL LIGHTING LAYOUT 2 OF 2
- ES_VOLUME 3_FIGURE 8.1 SITE LOCATION AND LVIA STUDY AREA
- ES_VOLUME 3_FIGURE 8.2 ENVIRONMENTAL DESIGNATIONS
- ES_VOLUME 3_FIGURE 8.3 PUBLISHED LANDSCAPE CHARACTER TYPES AND AREAS
- ES_VOLUME 3_FIGURE 8.4 LANDSCAPE CONTEXT
- ES_VOLUME 3_FIGURE 8.5 TOPOGRAPHY
- ES_VOLUME 3_FIGURE 8.6 ZONE OF THEORETICAL VISIBILITY (BARE EARTH)
- ES_VOLUME 3_FIGURE 8.7 ZONE OF THEORETICAL VISIBILITY (SCREENED) AND VIEWPOINT L
- ES_VOLUME 3_FIGURE 8.8-8.15_VIEWPOINTS 1-6
- ES_VOLUME 3_FIGURE 8.27_VERIFIED PHOTOMONTAGE VIEWPOINT 5
- ES_VOLUME 3_FIGURE 8.28__VERIFIED PHOTOMONTAGE VIEWPOINT 6
- ES_VOLUME 3_FIGURE 8.29_VERIFIED PHOTOMONTAGE VIEWPOINT 10
- ES_VOLUME 3_FIGURE 8.30_VERIFIED PHOTOMONTAGE VIEWPOINT 14
- ES_VOLUME 3_FIGURE 8.31_VERIFIED PHOTOMONTAGE VIEWPOINT 15
- ES_VOLUME 3_FIGURE 9.1_PHASE 1 HABITAT SURVEY
- ES_VOLUME 3_FIGURE 9.3_BAT TRANSECT ROUTE AND STATIC DETECTOR LOCATIONS
- ES_VOLUME 3_FIGURE 9.4_BAT TRANSECT SURVEY RESULTS - VISIT 1 - 03-05-2023
- ES_VOLUME 3_FIGURE 9.5_BAT TRANSECT SURVEY RESULTS - VISIT 2 - 24-05-2023
- ES_VOLUME 3_FIGURE 9.6_BAT TRANSECT SURVEY RESULTS - VISIT 3 - 26-06-2023
- ES_VOLUME 3_FIGURE 9.7_BAT TRANSECT SURVEY RESULTS - VISIT 4 - 25-07-2023
- ES_VOLUME 3_FIGURE 9.8_BAT TRANSECT SURVEY RESULTS - VISIT 5 - 24-08-2023
- ES_VOLUME 3_FIGURE 9.9_BAT TRANSECT SURVEY RESULTS - VISIT 6 - 25-09-2023
- ES_VOLUME 3_FIGURE 9.10_BAT TRANSECT SURVEY RESULTS - VISIT 7 - 16-10-2023
- ES_VOLUME 3_FIGURE 9.11_BREEDING BIRDS SURVEY RESULTS VISIT 1- 28-04-23
- ES_VOLUME 3_FIGURE 9.12_BREEDING BIRDS SURVEY RESULTS VISIT 2 - 11-05-23
- ES_VOLUME 3_FIGURE 9.13_BREEDING BIRDS SURVEY RESULTS VISIT 3- 22-05-23
- ES_VOLUME 3_FIGURE 9.14_BREEDING BIRDS SURVEY RESULTS VISIT 4- 06-06-23
- ES_VOLUME 3_FIGURE 9.15_BREEDING BIRDS SURVEY RESULTS VISIT 5- 23-06-23
- ES_VOLUME 3_FIGURE 9.16_BREEDING BIRDS SURVEY RESULTS VISIT 6- 06-07-23
- ES_VOLUME 3_FIGURE 8.16-8.26_VIEWPOINTS 7-16
- ES_VOLUME 2_APPENDIX 13.1_PART D_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART J_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART I_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART F_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 14.1_PART A_FLOOD RISK ASSESSMENT
- ES_VOLUME 2_APPENDIX 14.1_PART B_FLOOD RISK ASSESSMENT
- ES_VOLUME 2_APPENDIX 13.1_PART E GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART G_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART C_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART H_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART B_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 13.1_PART A_ GEO-ENVIRONMENTAL DESK STUDY
- ES_VOLUME 2_APPENDIX 15.1_PART A_HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- ES_VOLUME 2_APPENDIX 13.2_MINING STABILITY REPORT INCLUDING PAST MINING RISK ASS
- ES_VOLUME 2_APPENDIX 14.1_PART C_FLOOD RISK ASSESSMENT
- ES_VOLUME 2_APPENDIX 16.2 - BASELINE LIGHTING SURVEY REPORT
- ES_VOLUME 2_APPENDIX 9.8_ARBORICULTURAL IMPACT ASSESSMENT IN SUPPORT OF HYBRID P
- ES_VOLUME 2_APPENDIX 15.1_PART B_HISTORIC ENVIRONMENT DESK BASED ASSESSMENT
- ES_VOLUME 2_APPENDIX 9.9A_BNG STATUTORY METRIC_TEP X9891.004 (MACRO DISABLED)
- ES_VOLUME 2_APPENDIX 17.1_ALC REPORT
- ES_VOLUME 2_APPENDIX 9.1_ECOLOGY DESK STUDY
- ES_VOLUME 2_APPENDIX 9.2_PHASE 1 HABITAT SURVEY AND TARGET NOTES
- ES_VOLUME 2_APPENDIX 8.3_LANDSCAPE STRATEGY
- ES_VOLUME 2_APPENDIX 9.4_BADGER SURVEY_REDACTED
- ES_VOLUME 2_APPENDIX 9.9_BNG ASSESSMENT
- ES_VOLUME 2_APPENDIX 9.3_HEDGEROW REGULATIONS ASSESSMENT
- ES_VOLUME 2_APPENDIX 9.5_BAT SURVEY
- ES VOLUME 2_APPENDIX 9.10_FRAMEWORK CEMP
- ES_VOLUME 2_APPENDIX 9.7_AMPHIBIAN SURVEY
- ES_VOLUME 2_APPENDIX 9.6_BREEDING BIRD SURVEY
- ES_VOLUME 2_APPENDIX 12.1_MEASURED SOUND PRESSURE LEVELS
- ES_VOLUME 2_APPENDIX 8.1_LVIA METHOD
- ES_VOLUME 2_APPENDIX 16.3 - EXTERNAL LIGHTING STRATEGY
- ES_VOLUME 2_APPENDIX 16.1 - BASELINE LIGHTING SURVEY MAP
- ES_VOLUME 2_APPENDIX 1.1_EIA SCOPING OPINION
- ES_VOLUME 2_APPENDIX 2.1_BREDBURY_AREA SCHEDULE_PROPOSED_(REV D)
- ES_VOLUME 1_ INTRODUCTORY CHAPTERS_V16_NOV 2025
- ES_VOLUME 1_CHAPTER 19_MITIGATION AND MONITORING
- ES_VOLUME 1_CHAPTER 8_LANDSCAPE AND VISUAL
- ES_VOUME 1_ CHAPTER 7_SOCIO ECONOMICS_V4_NOV 25
- ES_VOLUME 1_ CHAPTER 13_GROUND CONDITIONS
- ES_VOLUME 1_CHAPTER 9_BIODIVERSITY
- ES_VOLUME 1_CHAPTER 10_TRAFFIC AND TRANSPORT
- ES_VOLUME 1_CHAPTER 11_AIR QUALITY
- ES_VOLUME 1_CHAPTER 12_NOISE AND VIBRATION
- ES_VOLUME 1_CHAPTER 14_WATER ENVIRONMENT
- ES_VOLUME 1_CHAPTER 15_CULTURAL HERITAGE AND ARCHAEOLOGY
- ES_VOLUME 1_CHAPTER 16_LIGHTING
- ES_VOLUME 1_CHAPTER 17_AGRICULTURE AND SOILS
- ES_VOLUME 1_CHAPTER 18_CUMULATIVE EFFECTS
- ES_VOLUME 1_CHAPTER 20_STATEMENT OF SIGNIFICANCE AND CONCLUSIONS
- NON TECHNICAL SUMMARY_V2_NOV 2025
- DESIGN AND ACCESS STATEMENT _REV B
- SOLAR PHOTOVOLTAIC GLINT AND GLARE STUDY 09.10.25
- BREDBURY EMPLOYMENT PARK CIS
- BREDBURY GATEWAY EMPLOYMENT NEEDS ASSESSMENT FINAL REPORT - ICENI
- BREDBURY GATEWAY LOGISTICS STUDY_V1_2025 - MODEL LOGIC
- BREDBURY LOW ZERO CARBON REPORT - ALDROCK
- BREDBURY SOCIAL VALUE EMPLOYMENT SKILLS PLAN 004 - SONAR
- BREDBURY GATEWAY FI030-006 V2 PROW STRATERGY
- BREDBURY GATEWAY FI030-005 V1 S106 HEADS OF TERMS
- BREDBURY GATEWAY FI030-002 V3 GREY BELT ASSESSMENT
- BREDBURY GATEWAY FI030-001 V12 PLANNING STATEMENT W APPENDIX
- BREDBURY GATEWAY FI030-003 V12 DEVELPOMENT SCHEDULE
- BREDBURY GATEWAY EMPLOYMENT REPORT JLL
- BREDBURY GATEWAY FI030-004 V4 SUMMARY STATEMENT
- BREDBURY GATEWAY SUSTAINABILITY CHECKLIST
- BREDBURY GATEWAY STATEMENT OF COMMUNITY INVOLVEMENT
- BREDBURY GATEWAY HEALTH IMPACT ASSESSMENT_ V8
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- DEVELOPMENT FRAMEWORK PLAN_EXISTING
- DEVELOPMENT FRAMEWORK PLAN_PROPOSED
- DEVELOPMENT STRATEGY PLAN
- PROPOSED SITE PLAN
- OUTLINE AND DETAILED PERMISSION EXTENTS
- PROPOSED FINISHED LEVELS 1OF2
- PROPOSED FINISHED LEVELS 2OF2
- PROPOSED CUT AND FILL
- D9687.001C ILLUSTRATIVE LANDSCAPE MASTERPLAN (SITE ONLY)
- D9697.002B ILLUSTRATIVE LANDSCAPE MASTERPLAN (INCLUDING OFF SITE AREA)
- ES_VOLUME 2_APPENDIX 10.2 TRAVEL PLAN-FINAL
- ES_VOLUME 2_APPENDIX 10.1 610-2025-126-01 REV 1 STAGE 1 RSA REPORT FINAL
- ES_VOLUME 2_APPENDIX 10.1 P24009-005F PROPOSED ACCESS
- ES_VOLUME 2_APPENDIX 10.1 P24009-006 ILLUSTRATIVE CYCLE ACCESS
- ES_VOLUME 2_APPENDIX 10.1 TRANSPORT ASSESSMENT-FINAL-TEXT
- BREDBURY GATEWAY COVERING LETTER
- ES_VOLUME 2_APPENDIX 11.1 AIR QUALITY ASSESSMENT INPUT DATA
- BREDBURY - APPLICATION VALIDATION ROLLING CHECKLIST V5
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided outline applications in a median of 70 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Adjacent To Ashton Road Bredbury Park Way Bredbury Stockport
EIA Scoping Opinion in relation to an extension to Bredbury Park Industrial Estate to comprise creation of storage/ distribution warehouses (B8 Use Class) (including ancillary office accommodation); General Industrial units (B2 Use Class); and Commercial and Business uses (Class E (g)(iii)), along with the provision of other associated infrastructure (including internal plot access, roads, vehicular and cycling parking, footpaths, earthworks, drainage and internal landscaping).
Decided Outline Extension 2 docs -
Land At Junction Of Bredbury Parkway/Horsfield Way
Confirmation that conditions of planning permission J/72099 have been discharged.
Granted Conditions 1 doc -
Gate Centre Bredbury Park Way Bredbury Stockport SK6 2SN
Discharge of condition 8 of DC/086187
Granted Conditions 11 docs -
Gate Centre Bredbury Park Way Bredbury Stockport SK6 2SN
Erection of 2 single storey light industrial starter units
Granted Full applications 13 docsSmall domestic -
Castle Hill Farm Castle Hill Bredbury Stockport SK6 2RY
Listed Building Consent for the repair and re-roofing of a Grade II listed barn.
Granted Heritage and listed buildings 11 docs -
Allied Bakeries Castle Hill Bredbury Stockport
Repositioning of wall adjacent to Allied Bakeries site entrance and relocation of fence along Castle Hill to allow road widening works approved under Planning Ref. DC/083927.
Granted Full applications 6 docsSmall domestic
Other outline applications
In Stockport
-
DC/100057 Granted
Ajax Works Whitehill Street South Reddish Stockport SK4 1NT
PV solar installation 220x 'Hengdian group DMEG Magnetic Co Ltd' DM450M10RT-54HBB modules
-
DC/099921 Decided
65 - 83 St Petersgate Stockport SK1 1DS
EIA Screening Opinion - To determine whether the proposed redevelopment of the site at 65-83 St Petersgate, Stockport constitutes Environmental Impact Assessment (EIA) development.
-
DC/098795 Decided
Land At Hyde Bank Meadows Romiley Stockport
Request for Screening Opinion under the Town and Country Planning Environmental Impact Assessment Regulations 2017 (as amended) for an outline planning application with all matters reserved, except access for the development of up to 250 dwellings (Use Class C3) with associated access roads and provision of open spaces.
-
DC/099773 Decided
Vitality House 217 Wellington Road South Heaviley Stockport SK2 6NG
EIA Screening Opinion - The proposed development will seek permission for the demolition of the existing building and structures on site and redevelopment of the site with a residential apartment scheme comprising of up to a maximum of 290 dwellings, together with 45sqm of commercial space at ground floor.
-
DC/100207 Awaiting decision
Land At Crescent Road Crescent Road Cheadle
Stage 1 Permission in Principle (PIP) application for up to 7 no. dwellings