Skip to content
PlanIndex Get alerts
Menu

Planning application

Bramhall Park Hall Road Bramhall Stockport SK7 3NX

Awaiting decision Stockport DC/097127 Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Listed Building application for works to building consisting of removal of existing M&E equipment and installation of new heating systems comprising an air-source heat pump (ASHP), associated pipework, underfloor heating and new radiators, along with new lighting; electrics; security, CCTV and fire alarm systems; secondary glazing; alterations to a retaining wall; new floor finishes; repairs and other building works.

As published by the council, reference DC/097127

Application record

Reference
DC/097127
Type
Listed Building Consent
Status
Registered
Received
26 Sep 2025
Validated
26 Sep 2025
Ward
Bramhall North (Bram)
Postcode
SK7 3NX

Timeline

Dates from the published record

  1. 26 Sep 2025

    Received by Stockport

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stockport took a median of 51 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Donald Insall Associates Ltd Agent, registered in London

Active · incorporated 1981 · London

202 applications on PlanIndex · across 43 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

71 documents on file for this application

  • PRESS NOTOCE Notice · 15 Oct 2025
  • STBH06-DR-3000-3P-1-DETAILS_FLOOR Plan · 29 Sep 2025
  • STBH06-DR-3001-3P-2-DETAILS_ASHP Plan · 29 Sep 2025
  • STBH06-DR-3002-3P-1-DETAILS_WINDOWS Plan · 29 Sep 2025
  • STBH06-DR-3003-3P-0-DETAILS_SOCKETS Plan · 29 Sep 2025
  • STBH06-DR-3004-3P-1-DETAILS_REMEDIATIONWORKEXAMPLES Plan · 29 Sep 2025
  • HEATING LAYOUT FIRST FLOOR Plan · 29 Sep 2025
  • LV DISTRIBUTION AND SMALL POWER ATTIC Plan · 29 Sep 2025
  • LIGHTING LAYOUT ATTIC Plan · 29 Sep 2025
  • SECURITY ATTIC Plan · 29 Sep 2025
  • FIRE DETECTION ATTIC Plan · 29 Sep 2025
  • LV DISTRIBUTION AND SMALL POWER BASEMENT Plan · 29 Sep 2025
  • LIGHTING LAYOUT BASEMENET Plan · 29 Sep 2025
  • SECURITY BASEMENT Plan · 29 Sep 2025
  • FIRE DETECTION BASEMENT Plan · 29 Sep 2025
  • HEATING LAYOUT BASEMENT Plan · 29 Sep 2025
  • PEPED SERVICE LAYOUT BASEMENT Plan · 29 Sep 2025
  • LV DISTRIBUTION AND SMALL POWER Plan · 29 Sep 2025
  • LIGHTING SCHEDULE GF Plan · 29 Sep 2025
  • SECURITY GROUND FLOOR Plan · 29 Sep 2025
  • FIRE DETECTION AND ALARM Plan · 29 Sep 2025
  • HEATING LAYOUT GF Plan · 29 Sep 2025
  • PIPED SERVICES LAYOUT GF Plan · 29 Sep 2025
  • LV DISTRIBUTION AND SMALL POWER LAYOUT FIRST FLOOR Plan · 29 Sep 2025
  • LIGHTING LAYOUT FIRST FLOOR Plan · 29 Sep 2025
  • SECURITY FIRST FLOOR Plan · 29 Sep 2025
  • HEATING LAYOUT FIRST FLOOR Plan · 29 Sep 2025
  • PIPED SERVICES LAYOUT FIRST FLOOR Plan · 29 Sep 2025
  • LV DISTRIBUTION AND SMALL FIRS FLOORPOWER LAYOUT Plan · 29 Sep 2025
  • LIGHTING LAYOUT FIRST FLOOR Plan · 29 Sep 2025
  • SECURITY SECOND FLOOR Plan · 29 Sep 2025
  • FIRE DETECTION AND ALARM SECOND FLLOR Plan · 29 Sep 2025
  • LIGHT SCHEDULE Report · 29 Sep 2025
  • STBH06-DR-4002-3P-1-LOCATIONPLAN Plan · 29 Sep 2025
  • STAGE 3 MECHANICAL AND ELECTRICAL REPORT Report · 29 Sep 2025
  • C002 CONSERVATION MANAGEMENT REPORT SEPT 2010_COMPRESSED Report · 29 Sep 2025
  • APPLICATIONFORMREDACTED ApplicationNoPersonalData · 26 Sep 2025
  • STBH06-DR-1000-3P-2-PLAN_BASEMENTEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1001-3P-2-PLAN_GROUNDEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1002-3P-2-PLAN_FIRSTFLOOREXISTING Plan · 26 Sep 2025
  • STBH06-DR-1003-3P-2-PLAN_SECONDANDTHIRDFLOORSEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1004-3P-2-PLAN_ATTICEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1500-3P-1-RCP_BASEMENTEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1501-3P-1-RCP_GROUNDEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1502-3P-1-RCP_FIRSTEXISTING Plan · 26 Sep 2025
  • STBH06-DR-1503-3P-1-RCP_SECONDFLOOREXISTING Plan · 26 Sep 2025
  • STBH06-DR-1504-3P-1-RCP_THIRDFLOOREXISTING Plan · 26 Sep 2025
  • STBH06-DR-2000-3P-3-PLAN_BASEMENTPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2001-3P-3-PLAN_GROUNDPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2002-3P-2-PLAN_FIRSTFLOORPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2003-3P-2-PLAN_SECONDANDTHIRDFLOORSPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2004-3P-1-PLAN_ATTICPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2400-3P-2-RCP_BASEMENTPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2401-3P-2-RCP_GROUNDPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2402-3P-2-RCP_FIRSTPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2403-3P-2-RCP_SECONDFLOORPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-2404-3P-1-RCP_THIRDFLOORPROPOSED Plan · 26 Sep 2025
  • STBH06-DR-5000-3P-1-PLAN_BASEMENTSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5001-3P-1-PLAN_GROUNDSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5002-3P-1-PLAN_FIRSTFLOORSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5003-3P-1-PLAN_SECONDANDTHIRDFLOORSSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5004-3P-1-PLAN_ATTICSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5400-3P-1-RCP_BASEMENTSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5401-3P-1-RCP_GROUNDSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5402-3P-0-RCP_FIRSTSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5403-3P-1-RCP_SECONDFLOORSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-5404-3P-1-RCP_THIRDFLOORSTRIPOUT Plan · 26 Sep 2025
  • STBH06-DR-4000-3P-7-SITEPLANEXISTING Plan · 26 Sep 2025
  • STBH06-DR-4001-3P-1-SITEPLANPROPOSED Plan · 26 Sep 2025
  • BRAMALL HALL HDAS_01_PART1 Report · 26 Sep 2025
  • BRAMALL HALL HDAS_01_PART2 Report · 26 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided heritage and listed building applications in a median of 371 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Bramall Hall Hall Road Bramhall Stockport SK7 3NX

    DC/096526 Submitted 25 Jul 2025 50 yards away

    94% historically approved · decision due ~8 Oct

    Temporary removal and reinstatement of existing plaster infill panels and associates repairs to external walls to allow for removal of beehives behind.

    Awaiting decision Heritage and listed buildings Extension 9 docs
  • Bramall Hall Hall Road Bramhall Stockport SK7 3NX

    DC/079796 Submitted 16 Feb 2021 50 yards away

    See plan and photo. T30 and T32, Sycamores. Significant decay in both trees. Fell and replace. HAR/CA29.

    Granted Trees 1 doc
  • 9 Lerryn Drive Bramhall Stockport SK7 3LU

    DC/099623 Submitted 13 Jul 2026 200 yards away

    Non-Material Amendment of Planning Permission DC/098151 - Addition of roof light

    Granted Amendments Loft or dormer 7 docs
  • 9 Lerryn Drive Bramhall Stockport SK7 3LU

    DC/100331 Submitted 2 Oct 2026 200 yards away

    99% historically approved · decision due ~27 Nov

    Discharge of conditions 2 and 3 of DC/098151

    Awaiting decision Conditions 3 docs
  • Tanglewood Hall Road Bramhall Stockport SK7 3NR

    DC/087390 Submitted 13 Dec 2022 200 yards away

    T1 Lime in rear garden. 20% reduction, too close to proprty with low incention. Also removal of stem and reduce left stem and reshape. HAR/CA29, TPO 78W.

    Granted Trees 2 docs
  • 3 Cherry Orchard Close BramhallStockport SK7 3EN

    DC/087497 Submitted 22 Dec 2022 200 yards away

    Single storey extension to the rear elevation.

    Granted Householder Extension 13 docs
    Small domestic

In Stockport

  • DC/100230 Awaiting decision

    20 Market Place Stockport SK1 1EU

    Internal structural works and associated internal works

    Received 18 Sep, published by the council 30 Sep 2026 Heritage and listed buildings
  • DC/100201 Awaiting decision

    Weir Mill Chestergate Stockport SK3 0AG

    Fit-out of commercial unit (EM-01 East Mill Unit 1, Weir Mill) within former mill building redeveloped by Capital and Centric.

    Received 15 Sep, published by the council 19 Sep 2026 Heritage and listed buildings
  • DC/100037 Awaiting decision

    Marple Lock 4 And Adjacent Footbridge On The Peak Forest Canal Peak Forest Canal Tow Path Marple Stockport

    Works to address towpath-side tailgate quadrant leakage, subsidence and movement (Listed Building Consent Application)

    Received 25 Aug, published by the council 9 Sep 2026 Heritage and listed buildings
  • DC/099500 Granted

    St Georges Ce Primary School Buxton Road Heaviley Stockport SK2 6NX

    Listed Building Consent - Replacement of steel framed single glazed windows to all elevations.

    Received 30 Jun, published by the council 21 Jul 2026 Heritage and listed buildings
  • DC/099912 Awaiting decision

    Bredbury Funeral Care 85 Higher Bents Lane Bredbury Stockport SK6 2NA

    To undertake repairs and refurbishment throughout the building. This includes roof repairs, replacement of rainwater goods, and the installation of a new suspended ceiling at the first floor office.

    Received 13 Aug, published by the council 6 Oct 2026 Heritage and listed buildings