Planning application
Bramhall Park Hall Road Bramhall Stockport SK7 3NX
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed Building application for works to building consisting of removal of existing M&E equipment and installation of new heating systems comprising an air-source heat pump (ASHP), associated pipework, underfloor heating and new radiators, along with new lighting; electrics; security, CCTV and fire alarm systems; secondary glazing; alterations to a retaining wall; new floor finishes; repairs and other building works.
As published by the council, reference DC/097127
Application record
- Reference
- DC/097127
- Type
- Listed Building Consent
- Status
- Registered
- Received
- 26 Sep 2025
- Validated
- 26 Sep 2025
- Ward
- Bramhall North (Bram)
- Postcode
- SK7 3NX
Timeline
Dates from the published record
-
26 Sep 2025
Received by Stockport
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stockport took a median of 51 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Donald Insall Associates Ltd Agent, registered in London
Active · incorporated 1981 · London
202 applications on PlanIndex · across 43 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
71 documents on file for this application
- PRESS NOTOCE
- STBH06-DR-3000-3P-1-DETAILS_FLOOR
- STBH06-DR-3001-3P-2-DETAILS_ASHP
- STBH06-DR-3002-3P-1-DETAILS_WINDOWS
- STBH06-DR-3003-3P-0-DETAILS_SOCKETS
- STBH06-DR-3004-3P-1-DETAILS_REMEDIATIONWORKEXAMPLES
- HEATING LAYOUT FIRST FLOOR
- LV DISTRIBUTION AND SMALL POWER ATTIC
- LIGHTING LAYOUT ATTIC
- SECURITY ATTIC
- FIRE DETECTION ATTIC
- LV DISTRIBUTION AND SMALL POWER BASEMENT
- LIGHTING LAYOUT BASEMENET
- SECURITY BASEMENT
- FIRE DETECTION BASEMENT
- HEATING LAYOUT BASEMENT
- PEPED SERVICE LAYOUT BASEMENT
- LV DISTRIBUTION AND SMALL POWER
- LIGHTING SCHEDULE GF
- SECURITY GROUND FLOOR
- FIRE DETECTION AND ALARM
- HEATING LAYOUT GF
- PIPED SERVICES LAYOUT GF
- LV DISTRIBUTION AND SMALL POWER LAYOUT FIRST FLOOR
- LIGHTING LAYOUT FIRST FLOOR
- SECURITY FIRST FLOOR
- HEATING LAYOUT FIRST FLOOR
- PIPED SERVICES LAYOUT FIRST FLOOR
- LV DISTRIBUTION AND SMALL FIRS FLOORPOWER LAYOUT
- LIGHTING LAYOUT FIRST FLOOR
- SECURITY SECOND FLOOR
- FIRE DETECTION AND ALARM SECOND FLLOR
- LIGHT SCHEDULE
- STBH06-DR-4002-3P-1-LOCATIONPLAN
- STAGE 3 MECHANICAL AND ELECTRICAL REPORT
- C002 CONSERVATION MANAGEMENT REPORT SEPT 2010_COMPRESSED
- APPLICATIONFORMREDACTED
- STBH06-DR-1000-3P-2-PLAN_BASEMENTEXISTING
- STBH06-DR-1001-3P-2-PLAN_GROUNDEXISTING
- STBH06-DR-1002-3P-2-PLAN_FIRSTFLOOREXISTING
- STBH06-DR-1003-3P-2-PLAN_SECONDANDTHIRDFLOORSEXISTING
- STBH06-DR-1004-3P-2-PLAN_ATTICEXISTING
- STBH06-DR-1500-3P-1-RCP_BASEMENTEXISTING
- STBH06-DR-1501-3P-1-RCP_GROUNDEXISTING
- STBH06-DR-1502-3P-1-RCP_FIRSTEXISTING
- STBH06-DR-1503-3P-1-RCP_SECONDFLOOREXISTING
- STBH06-DR-1504-3P-1-RCP_THIRDFLOOREXISTING
- STBH06-DR-2000-3P-3-PLAN_BASEMENTPROPOSED
- STBH06-DR-2001-3P-3-PLAN_GROUNDPROPOSED
- STBH06-DR-2002-3P-2-PLAN_FIRSTFLOORPROPOSED
- STBH06-DR-2003-3P-2-PLAN_SECONDANDTHIRDFLOORSPROPOSED
- STBH06-DR-2004-3P-1-PLAN_ATTICPROPOSED
- STBH06-DR-2400-3P-2-RCP_BASEMENTPROPOSED
- STBH06-DR-2401-3P-2-RCP_GROUNDPROPOSED
- STBH06-DR-2402-3P-2-RCP_FIRSTPROPOSED
- STBH06-DR-2403-3P-2-RCP_SECONDFLOORPROPOSED
- STBH06-DR-2404-3P-1-RCP_THIRDFLOORPROPOSED
- STBH06-DR-5000-3P-1-PLAN_BASEMENTSTRIPOUT
- STBH06-DR-5001-3P-1-PLAN_GROUNDSTRIPOUT
- STBH06-DR-5002-3P-1-PLAN_FIRSTFLOORSTRIPOUT
- STBH06-DR-5003-3P-1-PLAN_SECONDANDTHIRDFLOORSSTRIPOUT
- STBH06-DR-5004-3P-1-PLAN_ATTICSTRIPOUT
- STBH06-DR-5400-3P-1-RCP_BASEMENTSTRIPOUT
- STBH06-DR-5401-3P-1-RCP_GROUNDSTRIPOUT
- STBH06-DR-5402-3P-0-RCP_FIRSTSTRIPOUT
- STBH06-DR-5403-3P-1-RCP_SECONDFLOORSTRIPOUT
- STBH06-DR-5404-3P-1-RCP_THIRDFLOORSTRIPOUT
- STBH06-DR-4000-3P-7-SITEPLANEXISTING
- STBH06-DR-4001-3P-1-SITEPLANPROPOSED
- BRAMALL HALL HDAS_01_PART1
- BRAMALL HALL HDAS_01_PART2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Stockport for determination, against a statutory target of eight weeks. Over the last year Stockport decided heritage and listed building applications in a median of 371 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bramall Hall Hall Road Bramhall Stockport SK7 3NX
94% historically approved · decision due ~8 Oct
Temporary removal and reinstatement of existing plaster infill panels and associates repairs to external walls to allow for removal of beehives behind.
Awaiting decision Heritage and listed buildings Extension 9 docs -
Bramall Hall Hall Road Bramhall Stockport SK7 3NX
See plan and photo. T30 and T32, Sycamores. Significant decay in both trees. Fell and replace. HAR/CA29.
Granted Trees 1 doc -
9 Lerryn Drive Bramhall Stockport SK7 3LU
Non-Material Amendment of Planning Permission DC/098151 - Addition of roof light
Granted Amendments Loft or dormer 7 docs -
9 Lerryn Drive Bramhall Stockport SK7 3LU
99% historically approved · decision due ~27 Nov
Discharge of conditions 2 and 3 of DC/098151
Awaiting decision Conditions 3 docs -
Tanglewood Hall Road Bramhall Stockport SK7 3NR
T1 Lime in rear garden. 20% reduction, too close to proprty with low incention. Also removal of stem and reduce left stem and reshape. HAR/CA29, TPO 78W.
Granted Trees 2 docs -
3 Cherry Orchard Close BramhallStockport SK7 3EN
Single storey extension to the rear elevation.
Granted Householder Extension 13 docsSmall domestic
Other heritage and listed building applications
In Stockport
-
DC/100230 Awaiting decision
20 Market Place Stockport SK1 1EU
Internal structural works and associated internal works
-
DC/100201 Awaiting decision
Weir Mill Chestergate Stockport SK3 0AG
Fit-out of commercial unit (EM-01 East Mill Unit 1, Weir Mill) within former mill building redeveloped by Capital and Centric.
-
DC/100037 Awaiting decision
Marple Lock 4 And Adjacent Footbridge On The Peak Forest Canal Peak Forest Canal Tow Path Marple Stockport
Works to address towpath-side tailgate quadrant leakage, subsidence and movement (Listed Building Consent Application)
-
DC/099500 Granted
St Georges Ce Primary School Buxton Road Heaviley Stockport SK2 6NX
Listed Building Consent - Replacement of steel framed single glazed windows to all elevations.
-
DC/099912 Awaiting decision
Bredbury Funeral Care 85 Higher Bents Lane Bredbury Stockport SK6 2NA
To undertake repairs and refurbishment throughout the building. This includes roof repairs, replacement of rainwater goods, and the installation of a new suspended ceiling at the first floor office.